R  panel. 
R  (b) Do a check of the bus bar for burn spots. 
R  5. Close-up________ 
R  Subtask 56-11-12-865-062 
R  A. Remove the safety clip(s) and the tag(s) and close this(these) circuit 
R  breaker(s): 
R  1DG1, 4DG1, 5DG1, 1DG2, 4DG2, 5DG2, 5SQ1, 5SQ2. 

R 1EFF : 051-099, 1 56-11-12Page 604 1 1 May 01/05 1 1 1CES 1


R  Glass Fixed Window - Permitted Damage 
R  Figure 602/TASK 56-11-12-991-028 
R 1EFF :  051-099,  1  56-11-12 Page 605 
1  1  May 01/05
 1  1
 1CES  1

 

R  Glass Fixed Window - Permitted Damage 
R  Figure 603/TASK 56-11-12-991-029 
R 1EFF :  051-099,  1  56-11-12 Page 606 
1  1  May 01/05
 1  1
 1CES  1

 

R  Glass Fixed Window - Permitted Damage 
R  Figure 604/TASK 56-11-12-991-030 
R 1EFF :  051-099,  1  56-11-12 Page 607 
1  1  May 01/05
 1  1
 1CES  1

 

R  Glass Fixed Window - Permitted Damage 
R  Figure 605/TASK 56-11-12-991-031 
R 1EFF :  051-099,  1  56-11-12 Page 608 
1  1  May 01/05
 1  1
 1CES  1

 

R  Glass Fixed Window - Permitted Damage 
R  Figure 606/TASK 56-11-12-991-033 
R 1EFF :  051-099,  1  56-11-12 Page 609 
1  1  May 01/05
 1  1
 1CES  1

 

R  Glass Fixed Window - Permitted Damage 
R  Figure 607/TASK 56-11-12-991-032 
R 1EFF :  051-099,  1  56-11-12 Page 610 
1  1  May 01/05
 1  1
 1CES  1

 

R Glass Fixed Window - Burn Spot Inspection Procedure R Figure 608/TASK 56-11-12-991-034
R 1EFF : 051-099, 1 56-11-12Page 611 1 1 May 01/05 1 1 1CES 1


R Subtask 56-11-12-942-055

R B. Close Access

R (1) Remove the ground support and maintenance equipment, the special and
R standard tools and all other items.
R (2) Remove the access platform(s).

R 1EFF : 051-099, 1 56-11-12Page 612 1 1 May 01/05 1 1 1CES 1

 

R **ON A/C 001-049, 101-149, 151-199, 201-299, 301-399, 401-499,

 TASK 56-11-12-200-001
 Inspection of the Fixed Windows
 WARNING : MAKE SURE THAT THE CIRCUIT BREAKERS RELATED TO THE WEATHER RADAR ARE
_______ OPENED, SAFETIED AND TAGGED.
 1. Reason for the Job
__________________
 This procedure is applicable :
 -
for the acrylic windows (LUCAS/ACT, P/N NH...)

 -
for the glass windows (PPG supplier, P/N NP...)

 -
for the glass windows (SPS supplier, P/N SPS...)


 2. Job Set-up Information
______________________
 A. Fixtures, Tools, Test and Support Equipment
 -------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
No specific circuit breaker(s) safety clip(s) No specific hand-held magnifying glass No specific light source No specific metal scale 150 mm (5.9 in.) long No specific access platform 4.5 m (14 ft. 9 in.)
 B. Referenced Information
 -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
56-10-00-110-002 Cleaning of the L/R Fixed Windows 56-10-00-200-004 Measurement of Scratch Depth with MITUTOYO Surface
 Tester SJ201 56-11-12-991-036 Fig. 609 56-11-12-991-037 Fig. 610 56-11-12-991-038 Fig. 611 56-11-12-991-039 Fig. 612 56-11-12-991-040 Fig. 613 56-11-12-991-041 Fig. 614 56-11-12-991-042 Fig. 615
R 1EFF : 001-049, 101-149, 151-199, 201-299, 1 56-11-12Page 613 1301-399, 401-499, 1Aug 01/05 1 1 1CES 1 -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------


56-11-12-991-043 Fig. 616 56-11-12-991-044 Fig. 617 56-11-12-991-045 Fig. 618 56-11-12-991-046 Fig. 619 56-11-12-991-048 Fig. 620 56-11-12-991-047 Fig. 621 56-11-12-991-049 Fig. 622 56-11-12-991-051 Fig. 623 56-11-12-991-050 Fig. 624 56-11-12-991-052 Fig. 625
 3. Job Set-up
__________
 Subtask 56-11-12-941-056
 A. Get Access
 (1)
 Put the access platform in position at the zone 210.
 