(2)
If the sliding window does not operate correctly, lubricate (Ref. TASK 12-22-56-600-001).
5. Close-up
________
Subtask 56-12-11-865-075
A. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s): R 1DG1, 4DG1, 5DG1, 1DG2, 4DG2, 5DG2, 5SQ1, 5SQ2.
Subtask 56-12-11-942-051
B. Close Access
(1)
Remove the ground support and maintenance equipment, the special and standard tools and all other items.
(2)
Close the sliding window 8DG1 (8DG2) (Ref. TASK 56-12-11-410-001).
(3)
Remove the access platform(s).
1EFF : ALL 1 56-12-11Page 639 1 1 May 01/05 1 1 1CES 1
ACTUATING MECHANISM - SLIDING WINDOW - REMOVAL/INSTALLATION
___________________________________________________________ TASK 56-12-12-000-001 Removal of the Actuating Mechanism WARNING : MAKE SURE THAT THE CIRCUIT BREAKERS RELATED TO THE WEATHER RADAR ARE
_______ OPENED, SAFETIED AND TAGGED.
1.
Reason for the Job
__________________
Self Explanatory
2.
Job Set-up Information
______________________
A. Fixtures, Tools, Test and Support Equipment
-------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
No specific circuit breaker(s) safety clip(s) No specific access platform 4.50 m (14 ft. 9 in.)
B. Referenced Information
-------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
56-12-12-991-001 Fig. 401 56-12-12-991-002 Fig. 402
3. Job Set-up
__________ Subtask 56-12-12-941-050
A. Get Access
(1) Put the access platform in position in the zone 210 in front of the sliding window.
1EFF : ALL 1 56-12-12Page 401 1 1 Feb 01/98 1 1 1CES 1
Subtask 56-12-12-865-050
B. Open, safety and tag this(these) circuit breaker(s):
R -------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------121VU COM NAV/RADAR/1 5SQ1 K13
R **ON A/C 051-099,
R 121VU COM NAV/RADAR/2 5SQ2 K14
R **ON A/C ALL
R R R R R R 122VU ANTI ICE/WINDOWS/R 122VU ANTI ICE/WHC/2 122VU ANTI ICE/WINDOWS/L 122VU ANTI ICE/WHC/1 123VU ANTI ICE/L/WHSLD 123VU ANTI ICE/R/WHSLD 4DG2 5DG2 4DG1 5DG1 1DG1 1DG2 W14 W13 X14 X13 AF10 AF03
Subtask 56-12-12-010-050
C. Removal of the Access Panels (Ref. Fig. 401/TASK 56-12-12-991-001)
(1) Removal of the panel 211PW, 212PW
(a) Open the sliding window,
(b) Remove the screw (15),the washer (16),
(c) Loosen the fastener (1),
(d) Remove the panel 211PW, 212PW.
(2) Removal of the lining panel 211GW, 212GW
(a) Remove the screws (8) and the washers (7),
(b) Loosen the fasteners (9),
1EFF : ALL 1 56-12-12Page 402 1 1 May 01/05 1 1 1CES 1
Removal of the Lower Lining Panels
Figure 401/TASK 56-12-12-991-001
1EFF : ALL 1 56-12-12 Page 403
1 1 Feb 01/98
1 1
1CES 1
(c)
Remove the screw (12), the washer (11) and disengage the electrical cable (13).
(d)
Remove the lining panel 211GW, 212GW.
(3) Removal of the lining panel 211DW, 212DW
(a)
Remove the screws (3) and (6) and the washers (2) and (5),
(b)
Loosen the fasteners (4),
(c)
Remove the lining panel 211DW, 212DW.
4. Procedure
_________ Subtask 56-12-12-020-050
A. Removal of the Actuating Mechanism
(Ref. Fig. 402/TASK 56-12-12-991-002)
(1)
Removal of the rod (35).
(a)
Remove the cotter pin (34) and discard it. Remove the washer (33).
(b)
Remove the cotter pin (36) and discard it. Remove the washer (37).
(c)
Remove the bolts (32) and (50). Remove the rod (35).