• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-03-27 08:58来源:蓝天飞行翻译 作者:admin
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

 (2)
 Install the screws (2) and the washers (6).

 (3)
 Put the lining panel (4) in position.

 (4)
 Install the four stud assy (3) and tighten them.

 

 (5)
 Tighten the fastener (5) and the screws (2).
 Subtask 56-11-11-110-051


 K. Cleaning of the windshield
 (1) Remove the protective film from the windshield.

 (2)
 Clean the windshield (Ref. TASK 56-10-00-110-001).
 Subtask 56-11-11-865-052

 

 L. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s): 1LF, 1DG1, 4DG1, 5DG1, 1DG2, 4DG2, 5DG2, 5SQ1, 5SQ2.
 1EFF : ALL 1 56-11-11Page 428 1 1 Aug 01/05 1 1 1CES 1


 Subtask 56-11-11-710-050

 M. Test
 (1) Do the test of the anti-icing and defogging system of the windshield (Ref. TASK 30-42-00-710-001).
 5. Close-up
________ Subtask 56-11-11-410-052
 A. Close Access
 (1)
 Install the wiper arm (Ref. TASK 30-45-52-400-002).

 (2)
 Remove the ground support and maintenance equipment, the special and standard tools and all other items.

 (3)
 Remove the access platform(s).

 (4)
 Remove the warning notice(s).

 (5)
 Make sure that the work area is clean and clear of tool(s) and other items.


 1EFF : ALL 1 56-11-11Page 429 1 1 Aug 01/05 1 1 1CES 1


R TASK 56-11-11-000-001- 01

R  Removal of the Windshield 
R  WARNING : MAKE SURE THAT THE CIRCUIT BREAKERS RELATED TO THE WEATHER RADAR ARE_______ 
R  OPENED, SAFETIED AND TAGGED. 
R  1. Reason for the Job__________________ 
R  NOTE : For the windshield removal/installation, there are three tool____ 
R  alternatives: 
R  - 98D56103001000 
R  - 98F56103000000 
R  - SGSIT01. 
R  The tool 98F56103000000 is the newest tool developed by Airbus to 
R  make the windshield adjustment easier. 
R  This procedure is applicable to the tool 98F56103000000. 
R  For SGS tool SGSIT01, the procedure is included in SGS documentation. 
R  NOTE : For the fastener removal, there are two tool alternatives:____ 
R  - 98A53003500000 
R  - SPSTK01-1. 
R  This procedure is applicable to the tool 98A53003500000. 
R  For SGS tool SPSTK01-1, the procedure is included in SGS 
R  documentation. 
R  2. Job Set-up Information______________________ 
R  A. Fixtures, Tools, Test and Support Equipment 
R  -------------------------------------------------------------------------------
R  REFERENCE  QTY DESIGNATION 
R  -------------------------------------------------------------------------------
R  No specific  blanking caps 
R  No specific  circuit breaker(s) safety clip(s) 
R  No specific  access platform 4.5 m (14 ft. 9 in.) 
R  98A53003500000  1 FASTENER REMOVAL TOOL 
R  98F56103000000  1 R/I FRONT WINDOW TOOL

 1EFF : ALL 1 56-11-11Page 430 1 1 Aug 01/05 1 1 1CES 1


R B. Referenced Information

R -------------------------------------------------------------------------------R REFERENCE DESIGNATION R -------------------------------------------------------------------------------
R  30-45-44-000-001  Removal of the Spray Nozzle 
R  30-45-52-000-002  Removal of the Wiper Arm (306DM, 307DM) 
R  56-11-11-991-001  Fig. 401 
R  56-11-11-991-002  Fig. 402 
R  56-11-11-991-022  Fig. 403 
R  56-11-11-991-023  Fig. 408 
R  3. Job Set-up__________ 
R  Subtask 56-11-11-010-061 
R  A. Get Access 

R  (1) Put an access platform in position at zone 210 in front of the 
R  windshield. 
R  (2) Remove the wiper arm (Ref. TASK 30-45-52-000-002). 
R  Subtask 56-11-11-865-063 
R  B. Open, safety and tag this(these) circuit breaker(s): 
R  -------------------------------------------------------------------------------
R  PANEL  DESIGNATION  IDENT. LOCATION 
R  -------------------------------------------------------------------------------
R  49VU LIGHTING/ICE AND STBY/COMP/LIGHT  1LF  H04 
R  121VU COM NAV/RADAR/1  5SQ1  K13 
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM WINDOWS 风挡 窗户(22)