R **ON A/C 052-052,
R Subtask 56-12-11-220-059-A
R C. Check of the Clearance
R (Ref. Fig. 416/TASK 56-12-11-991-047)
R (1) Make sure that the sliding window is open.
R (2) Do a check of the out-of-flush clearance C between the retainer (34)
R and the sliding window panel (30).
R NOTE : The clearance C (edge-clearance) between the window frame and____
R window panel, shows a defect in the flat surfaces of the panel
R and the frame.
R The edge-clearance location is at the window panel/frame edge.
R (a) Make sure that the out-of-flush clearance C between the retainer
R (34) and the glass sliding window (30) is 0.6 +0.8 -0.7 mm
R (0.0236 +0.0314 -0.0275 in.).
R (3) Close the sliding window. Make sure that the window moves easily.
R (4) Make sure that the out-of-flush B between the sliding window and the
R frame is:
R - 0 +0.6 -2 mm (0.0000 +0.0236 -0.0787 in.) at points 1, 3, 5, 6, 8,
R 10 and 11.
R - 0 +0.4 -2 mm (0.0000 +0.0157 -0.0787 in.) at points 2, 4, 7 and 9.
R NOTE : Make sure that the difference between the smallest and the____
R largest value at points 2, 4, 7 and 9 is not more than 0.3 mm
R (0.0118 in.).
R (5) If the out-of-flush B is not correct, adjust as follows:
R (a) Remove the circlips (42), (45), (46) and (51).
R (b) Loosen the nuts (41), (44), (47) and (50).
R (c) Turn the eccentrics (40), (43), (48) and (49) to get the correct
R out-of-flush B.
R (d) TORQUE the nuts (41), (44), (47) and (50) to between 0.6 and 0.7
R m.daN (53.09 and 61.94 lbf.in).
R (e) Safety the nuts (41), (44), (47) and (50) with BONDING AND
R ADHESIVE COMPOUNDS (Material No. 08-002A).
R (f) Install the circlips (42), (45), (46) and (51).
R **ON A/C 053-099,
R Subtask 56-12-11-220-059-B
R C. Check of the Clearance
R (Ref. Fig. 416A/TASK 56-12-11-991-047-A)
R (1) Make sure that the sliding window is open.
R (2) Do a check of the out-of-flush clearance C between the retainer (34)
R and the sliding window panel (30).
R NOTE : The clearance C (edge-clearance) between the window frame and____
R window panel, shows a defect in the flat surfaces of the panel
R and the frame.
R The edge-clearance location is at the window panel/frame edge.
R (a) Make sure that the out-of-flush clearance C between the retainer
R (34) and the glass sliding window (30) is 0.6 +0.8 -0.7 mm
R (0.0236 +0.0314 -0.0275 in.).
R (3) Close the sliding window. Make sure that the window moves easily.
R (4) Make sure that the out-of-flush B between the sliding window and the
R frame is:
R - 0 +0.6 -2 mm (0.0000 +0.0236 -0.0787 in.) at points 1, 3, 5, 6, 8,
R 10 and 11.
R - 0 +0.4 -2 mm (0.0000 +0.0157 -0.0787 in.) at points 2, 4, 7 and 9.
R NOTE : Make sure that the difference between the smallest and the____
R largest value at points 2, 4, 7 and 9 is not more than 0.3 mm
R (0.0118 in.).
R (5) If the out-of-flush B is not correct, adjust as follows:
R (a) Release the lockwashers (52), (53), (54) and (55).
R (b) Remove the circlips (42), (45), (46) and (51).
R (c) Remove the nuts (41), (44), (47) and (50).
R Sliding Windows - Clearances
R Figure 416A/TASK 56-12-11-991-047-A12 (SHEET 1)
1EFF : 053-099, 1 56-12-11Page 476 1 1 May 01/05 1 1 1CES 1
R Sliding Windows - Clearances
R Figure 416A/TASK 56-12-11-991-047-A22 (SHEET 2)
1EFF : 053-099, 1 56-12-11Page 477 1 1 May 01/05 1 1 1CES 1 1EFF : 051-099, 1 56-12-11Page 478 1 1 May 01/05 1 1 1CES 1
R (d) Remove the lockwashers (52), (53), (54) and (55) and discard
R them.
R (e) Install new lockwasher (52) and new lockwasher (53).
R (f) Install new lockwasher (54) and new lockwasher (55).
R (g) Install the nuts (41), (44), (47) and (50).
R (h) Turn the eccentrics (40), (43), (48) and (49) to get the correct
R out-of-flush B.