1EFF : ALL 1 56-11-11Page 438 1 1 Aug 01/05 1 1 1CES 1 1EFF : ALL 1 56-11-11Page 439 1 1 Aug 01/05 1 1 1CES 1 1EFF : ALL 1 56-11-11Page 440 1 1 Aug 01/05 1 1 1CES 1 1EFF : ALL 1 56-11-11Page 441 1 1 Aug 01/05 1 1 1CES 1 1EFF : ALL 1 56-11-11Page 442 1 1 Aug 01/05 1 1 1CES 1
R 3. Job Set-up__________
R Subtask 56-11-11-860-051
R A. Aircraft Maintenance Configuration
R (1) Make sure that the access platform is in position.
R Subtask 56-11-11-865-064
R B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and
R tagged
R -------------------------------------------------------------------------------
R PANEL DESIGNATION IDENT. LOCATION
R -------------------------------------------------------------------------------
R 49VU LIGHTING/ICE AND STBY/COMP/LIGHT 1LF H04
R 121VU COM NAV/RADAR/1 5SQ1 K13
R **ON A/C 051-099,
R 121VU COM NAV/RADAR/2 5SQ2 K14
R **ON A/C ALL
R 122VU ANTI ICE/WINDOWS/R 4DG2 W14
R 122VU ANTI ICE/WHC/2 5DG2 W13
R 122VU ANTI ICE/WINDOWS/L 4DG1 X14
R 122VU ANTI ICE/WHC/1 5DG1 X13
R 123VU ANTI ICE/L/WHSLD 1DG1 AF10
R 123VU ANTI ICE/R/WHSLD 1DG2 AF03
R Subtask 56-11-11-110-056
R C. Preparation for the Installation
R (1) Clean the windshield housing and the retainers with CLEANING AGENTS
R (Material No. 11-003).
R (2) Apply COMMON GREASE (Material No. 04-012) with a brush on the mating
R surfaces of the windshield panel and in its housing.
R (3) Make sure that the fastener countersinks at the upper horizontal
R frame are correctly filled with sealant.
R If they are not, apply SEALANTS (Material No. 09-016) or SEALANTS
R (Material No. 09-053) to make the upper horizontal frame flat in the
R seal contact area. This will prevent pressure leaks.
R If you use a sealant different from the remaining sealant, you must
R first clean the fastener countersinks with CLEANING AGENTS (Material
R No. 11-003).
R NOTE : If you use PR1436GB-ND1/2 at 23deg.C, the application time is____
R 1/2 hour and the cure time is 24 hours. If you use
R PR1436GB2-NA at 23deg.C, the application time is 2 hours and
R the cure time is 30 hours. If you use PR1436GB4-NA at 23deg.C,
R the application time is 4 hours and the cure time is 40 hours.
R If you use DAPCO 72 at 23deg.C, the application time is 1/4
R hour and the cure time is 2 1/2 hours.
R 4. Procedure_________
R Subtask 56-11-11-420-057
R A. Installation of the Windshield Panel
R (Ref. Fig. 408/TASK 56-11-11-991-023)
R WARNING : BE CAREFUL DURING THE REMOVAL/INSTALLATION OF THE WINDSHIELD TO_______
R PREVENT INJURY TO PERSONS AND/OR DAMAGE.
R MAKE SURE THAT:
R -THERE ARE SUFFICIENT PERSONS FOR THE TASK.
R -YOU DO NOT CAUSE DAMAGE TO THE SEAL OR THE GLASS PLIES.
R THE WINDSHIELD IS HEAVY.
R CAUTION : DO NOT USE A SUCTION CUP TO HOLD THE INNER SURFACE OF THE_______
R WINDSHIELD PANEL IF THE PANEL HAS A SOFT (SELF HEALING) LINER
R (SUPPLIER SPS).THE SUCTION CUP WILL CAUSE DAMAGE TO THE SOFT
R LINER.
R -DO NOT TRY TO REMOVE THE SOFT LINER.
R THE SOFT LINER IS A PART OF THE WINDSHIELD PANEL.
R CAUTION : REMOVE THE WINDSHIELD PANELS FROM THEIR CONTAINER ONLY WHERE_______
R AND WHEN YOU INSTALL THEM.
R KEEP THE PROTECTIVE FILM ON THE INTERNAL AND EXTERNAL SURFACES
R OF THE WINDSHIELD :
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM WINDOWS 风挡 窗户(25)