R TASK 56-12-11-400-002-A
R Installation of the Sliding Window Panel
R WARNING : MAKE SURE THAT THE CIRCUIT BREAKERS RELATED TO THE WEATHER RADAR ARE
_______ R OPENED, SAFETIED AND TAGGED.
R 1. Reason for the Job
__________________
R This procedure is applicable to the glass windows (SPS supplier, P/N R SPS...).
R 2. Job Set-up Information
______________________
R A. Fixtures, Tools, Test and Support Equipment
R -------------------------------------------------------------------------------R REFERENCE QTY DESIGNATION
R -------------------------------------------------------------------------------
R No specific 2 suction cups
R No specific 4 non metallic shims 1.4 mm (0.0551 in.)
R No specific dynamometer 25 daN (56.2022 lbf)
R No specific Torque Wrench : range 0.00 to 1.20 m.daN
R (0.00 to 9.00 lbf.ft)
R 98D56103002001 1 WRENCH, REMOVAL - SLIDING WINDOW
R B. Consumable Materials
R -------------------------------------------------------------------------------R REFERENCE DESIGNATION
R -------------------------------------------------------------------------------
R Material No. 08-002A R R Material No. 09-016 R R R Material No. 11-003 R R Material No. 19-003 R
GENERAL PURPOSE DIMETHACRYLATE GREEN (Ref. 20-31-00)
USA MIL-PRF-81733D TYPE II CLASS B
CORROSION INHIBITING FILLET CONSISTENCY
(Ref. 20-31-00)
USA ASTM D 740
METHYL-ETHYL-KETONE (Ref. 20-31-00)
USA AMS 3819
LINT-FREE COTTON CLOTH (Ref. 20-31-00)
1EFF : 051-099, 1 56-12-11Page 467 1 1 May 01/05 1 1 1CES 1
R C. Expendable Parts
R -------------------------------------------------------------------------------R FIG.ITEM |DESIGNATION |IPC-CSN R -------------------------------------------------------------------------------
R 52 lockwasher 56-12-11 02A-185 R 53 lockwasher 56-12-11 02A-185 R 54 lockwasher 56-12-11 03B-185 R 55 lockwasher 56-12-11 03B-185
R D. Referenced Information
R -------------------------------------------------------------------------------R REFERENCE DESIGNATION R -------------------------------------------------------------------------------
R 30-42-00-710-001 R R 33-12-12-400-002 R 33-12-18-400-001 R R 52-10-00-410-001 R 56-10-00-110-003 R 56-12-11-410-001 R 56-12-11-991-030 R 56-12-11-991-029
R **ON A/C 051-052,
R 56-12-11-991-047
R **ON A/C 053-099,
R 56-12-11-991-047-A Operational Test of the Windshield Anti-Icing and Defogging Installation of the Map Table lights (41LE, 42LE) Installation of the Map Table Light Rheostats (39LE, 40LE) Closing of the Passenger/Crew Door Cleaning of the L/R Sliding Windows Closing of the Cockpit Sliding Windows Fig. 414 Fig. 415
Fig. 416
Fig. 416A
1EFF : 051-099, 1 56-12-11Page 468 1 1 May 01/05 1 1 1CES 1
R **ON A/C 051-099,
R 3. Job Set-up__________
R Subtask 56-12-11-860-051
R A. Aircraft Maintenance Configuration
R (1) Make sure that the access platforms are in position.
R (2) Make sure that the FWD passenger/crew door is open.
R Subtask 56-12-11-865-060
R B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and
R tagged
R -------------------------------------------------------------------------------
R PANEL DESIGNATION IDENT. LOCATION
R -------------------------------------------------------------------------------
R 121VU COM NAV/RADAR/2 5SQ2 K14
R 121VU COM NAV/RADAR/1 5SQ1 K13
R FOR 8DG1
R 122VU ANTI ICE/WINDOWS/L 4DG1 X14
R 122VU ANTI ICE/WHC/1 5DG1 X13
R 123VU ANTI ICE/L/WHSLD 1DG1 AF10
R FOR 8DG2
R 122VU ANTI ICE/WINDOWS/R 4DG2 W14
R 122VU ANTI ICE/WHC/2 5DG2 W13
R 123VU ANTI ICE/R/WHSLD 1DG2 AF03
R 4. Procedure_________
R Subtask 56-12-11-110-059
R A. Preparation for Installation
R (1) Clean the housing of the sliding window panel with CLEANING AGENTS