R 1EFF : 053-099, 1 56-12-11Page 417 1 1 May 01/05 1 1 1CES 1
R Sliding Windows - Rollers
R Figure 405A/TASK 56-12-11-991-036-A
R 1EFF : 053-099, 1 56-12-11 Page 418
1 1 May 01/05
1 1
1CES 1
R (m) Install the circlips (70) and (63).
R (n) Install the sliding window and close it.
R (o) Make sure that the upper and lower peripheral clearances J4 on
R the Z axis are correct. If necessary do the adjustment procedure
R again.
R (3) Adjustment on the X axis :
R (a) Remove the circlip (59).
R (b) Loosen the nut (60).
R (c) Turn the eccentric (61) to get a correct peripheral clearance J4
R on the X axis.
R (d) TORQUE the nut (60) to between 0.4 and 0.5 m.daN (35.39 and 44.24
R lbf.in) safety it with BONDING AND ADHESIVE COMPOUNDS (Material
R No. 08-002A).
R (e) Install the circlip (59).
R (f) Make sure that the peripheral clearance J4 on the X axis is
R correct. If necessary do the adjustment procedure again.
R (4) Adjustment of the latches (90).
R (a) Make sure that the sliding window is closed.
R (b) Make sure that the clearance J5 between the latches (90) and the
R locking pins (91) is 0 +0 +0.1 mm (0.0000 +0.0000 +0.0039 in.).
R (c) If the clearance J5 is not in the tolerance, turn the eccentric
R of the locking pins (91) on the frame.
R (5) Temporary installation of the aft upper rail.
R (Ref. Fig. 403/TASK 56-12-11-991-032)
R (a) Install the aft upper rail (56), the bolts (54), (55) and the
R nuts (57). Do not tighten the nuts (57).
R 1EFF : 053-099, 1 56-12-11Page 419 1 1 May 01/05 1 1 1CES 1
R **ON A/C 051-051,
R Subtask 56-12-11-220-057
R C. Check of the Clearances
R (Ref. Fig. 404/TASK 56-12-11-991-035, 405/TASK 56-12-11-991-036)
R (1) Close the sliding window. Make sure that the window moves easily.
R (2) From points 1 to 11 make sure that the out-of-flush dimension A
R between the sliding window and the frame is 0 +0.6 -2 mm (0.0000
R +0.0236 -0.0787 in.) on the periphery of the window panel.
R (3) If the out-of-flush dimension A is not correct, adjust as follows:
R (a) Remove the circlips (63), (70), (79) and (80).
R (b) Loosen the nuts (64), (69), (72) and (78).
R (c) Turn the eccentrics (65), (68), (73) and (74) to get the
R out-of-flush dimension A.
R (d) TORQUE the nuts (64), (69), (72) and (78) to between 0.6 and 0.7
R m.daN (53.09 and 61.94 lbf.in).
R (e) Safety the nuts (64), (69), (72) and (78) with BONDING AND
R ADHESIVE COMPOUNDS (Material No. 08-002A).
R (f) Install the circlips (63), (70), (79) and (80).
R (4) Adjustment of the latches (90).
R (5) Make sure that the sliding window is closed.
R (a) If the clearance J5 is not in the tolerance, turn the eccentric
R of the locking pins (91) on the frame.
R (b) Make sure that the clearance J3 between the latches (90) and the
R locking pins (91) is 0 +0 +0.1 mm (0.0000 +0.0000 +0.0039 in.).
R 1EFF : 051-051, 1 56-12-11Page 420 1 1 May 01/05 1 1 1CES 1
R **ON A/C 052-052,
R Subtask 56-12-11-220-057-A
R C. Check of the Clearances
R (Ref. Fig. 404/TASK 56-12-11-991-035, 405/TASK 56-12-11-991-036)
R (1) Close the sliding window. Make sure that the window moves easily.
R (2) Make sure that the out-of-flush dimension A between the sliding
R window and the frame is:
R - 0 +0.6 -2 mm (0.0000 +0.0236 -0.0787 in.) at points 1, 3, 5, 6, 8,
R 10 and 11.
R - 0 +0.4 -2 mm (0.0000 +0.0157 -0.0787 in.) at points 2, 4, 7 and 9.