• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-03-27 08:58来源:蓝天飞行翻译 作者:admin
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

R  (71) and the frame is 0.5 mm (0.0196 in.) to 4.5 mm (0.1771 in.) 
R  (j) Lubricate the lower roller supports (62) and (71) with COMMON 
R  GREASE (Material No. 04-004), then install them. 
R  (k) Install the new lockwasher (82) and lockwasher (84). 
R  (l) Install the nuts (69) and (64). TORQUE to between 0.6 and 0.7 
R  m.daN (53.09 and 61.94 lbf.in). 

R 1EFF : 053-099, 1 56-12-11Page 417 1 1 May 01/05 1 1 1CES 1


R  Sliding Windows - Rollers 
R  Figure 405A/TASK 56-12-11-991-036-A 
R 1EFF :  053-099,  1  56-12-11 Page 418 
1  1  May 01/05
 1  1
 1CES  1

 

R (m) Install the circlips (70) and (63).

R  (n) Install the sliding window and close it. 
R  (o) Make sure that the upper and lower peripheral clearances J4 on 
R  the Z axis are correct. If necessary do the adjustment procedure 
R  again. 
R  (3) Adjustment on the X axis : 
R  (a) Remove the circlip (59). 
R  (b) Loosen the nut (60). 
R  (c) Turn the eccentric (61) to get a correct peripheral clearance J4 
R  on the X axis. 
R  (d) TORQUE the nut (60) to between 0.4 and 0.5 m.daN (35.39 and 44.24 
R  lbf.in) safety it with BONDING AND ADHESIVE COMPOUNDS (Material 
R  No. 08-002A). 
R  (e) Install the circlip (59). 
R  (f) Make sure that the peripheral clearance J4 on the X axis is 
R  correct. If necessary do the adjustment procedure again. 
R  (4) Adjustment of the latches (90). 
R  (a) Make sure that the sliding window is closed. 
R  (b) Make sure that the clearance J5 between the latches (90) and the 
R  locking pins (91) is 0 +0 +0.1 mm (0.0000 +0.0000 +0.0039 in.). 
R  (c) If the clearance J5 is not in the tolerance, turn the eccentric 
R  of the locking pins (91) on the frame. 
R  (5) Temporary installation of the aft upper rail. 
R  (Ref. Fig. 403/TASK 56-12-11-991-032) 
R  (a) Install the aft upper rail (56), the bolts (54), (55) and the 
R  nuts (57). Do not tighten the nuts (57). 

R 1EFF : 053-099, 1 56-12-11Page 419 1 1 May 01/05 1 1 1CES 1


R  **ON A/C 051-051, 
R  Subtask 56-12-11-220-057 
R  C. Check of the Clearances 
R  (Ref. Fig. 404/TASK 56-12-11-991-035, 405/TASK 56-12-11-991-036) 
R  (1) Close the sliding window. Make sure that the window moves easily. 
R  (2) From points 1 to 11 make sure that the out-of-flush dimension A 
R  between the sliding window and the frame is 0 +0.6 -2 mm (0.0000 
R  +0.0236 -0.0787 in.) on the periphery of the window panel. 
R  (3) If the out-of-flush dimension A is not correct, adjust as follows: 
R  (a) Remove the circlips (63), (70), (79) and (80). 
R  (b) Loosen the nuts (64), (69), (72) and (78). 
R  (c) Turn the eccentrics (65), (68), (73) and (74) to get the 
R  out-of-flush dimension A. 
R  (d) TORQUE the nuts (64), (69), (72) and (78) to between 0.6 and 0.7 
R  m.daN (53.09 and 61.94 lbf.in). 
R  (e) Safety the nuts (64), (69), (72) and (78) with BONDING AND 
R  ADHESIVE COMPOUNDS (Material No. 08-002A). 
R  (f) Install the circlips (63), (70), (79) and (80). 
R  (4) Adjustment of the latches (90). 
R  (5) Make sure that the sliding window is closed. 
R  (a) If the clearance J5 is not in the tolerance, turn the eccentric 
R  of the locking pins (91) on the frame. 
R  (b) Make sure that the clearance J3 between the latches (90) and the 
R  locking pins (91) is 0 +0 +0.1 mm (0.0000 +0.0000 +0.0039 in.). 

R 1EFF : 051-051, 1 56-12-11Page 420 1 1 May 01/05 1 1 1CES 1


R  **ON A/C 052-052, 
R  Subtask 56-12-11-220-057-A 
R  C. Check of the Clearances 
R  (Ref. Fig. 404/TASK 56-12-11-991-035, 405/TASK 56-12-11-991-036) 
R  (1) Close the sliding window. Make sure that the window moves easily. 
R  (2) Make sure that the out-of-flush dimension A between the sliding 
R  window and the frame is: 
R  - 0 +0.6 -2 mm (0.0000 +0.0236 -0.0787 in.) at points 1, 3, 5, 6, 8, 
R  10 and 11. 
R  - 0 +0.4 -2 mm (0.0000 +0.0157 -0.0787 in.) at points 2, 4, 7 and 9. 
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM WINDOWS 风挡 窗户(52)