• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-03-27 00:00来源:蓝天飞行翻译 作者:admin
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

 (2)
 Remove the nut (8), the washer set (6) and the stop screw (5) from the fitting assembly (7).


R 1EFF : 004-049, 055-099, 101-149, 221-221, 1 52-33-31Page 406 1224-224, 228-228, 1May 01/05 1 1 1CES 1


R **ON A/C 001-049, 051-099, 101-149, 221-221, 224-224, 228-228,

 TASK 52-33-31-400-001
 Installation of the Latch and the Stop Fitting
 1. Reason for the Job
__________________
 Self Explanatory
 2. Job Set-up Information
______________________
 A. Fixtures, Tools, Test and Support Equipment
 -------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
No specific access platform 2.3 m (7 ft. 7 in.) R No specific Torque Wrench : range 0.00 to 1.20 m.daN R (0.00 to 9.00 lbf.ft)
 B. Consumable Materials
 -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
Material No. 05-002  USA MIL-P-8116 PUTTY, ZINC CHROMATE GENERAL PURPOSE (Ref. 20-31-00)
 Material No. 05-027  USA MIL-L-81309
 RUST INHIBITOR(FOR CORROSION USE 15-004)
 (Ref. 20-31-00)

 Material No. 09-005  USA MIL-S-81733 CLASS C CORROSION INHIBITIVE INTERFAY SEALANT (Ref. 20-31-00)
 Material No. 09-013  USA MIL-PRF-81733 TYPE I CLASS A
 CORROSION INHIBITING BRUSH CONSISTENCY
 (Ref. 20-31-00)

 Material No. 09-016  USA MIL-PRF-81733D TYPE II CLASS B
 CORROSION INHIBITING FILLET CONSISTENCY
 (Ref. 20-31-00)

 Material No. 09-018  USA AMS 3267/3
 CORROSION INHIBITING LOW ADHESION SEALANT
 (Ref. 20-31-00)

 Material No. 16-003  F ASNB70720
 COATING (OBSOLETE USE 16-021) (Ref. 20-31-00)

R 1EFF : 001-049, 051-099, 101-149, 221-221, 1 52-33-31Page 407 1224-224, 228-228, 1May 01/05 1 1 1CES 1


 C. Expendable Parts
 -------------------------------------------------------------------------------
FIG.ITEM |DESIGNATION |IPC-CSN
 -------------------------------------------------------------------------------
lockplate 52-33-31 01 -030
 D. Referenced Information
 -------------------------------------------------------------------------------
REFERENCE DESIGNATION
 -------------------------------------------------------------------------------
52-30-00-860-001 Open the FWD or AFT Cargo-Compartment Door with the Yellow Electric Pump 52-30-00-860-002 Close the FWD or AFT Cargo-Compartment Door with the
 Yellow Electric Pump 52-30-00-860-006 Open the Bulk Cargo-Compartment Door 52-30-00-860-008 Close the Bulk Cargo-Compartment Door 52-30-00-860-010 Open the Deactivated Bulk Cargo-Compartment Door 52-30-00-860-011 Close the Deactivated Bulk Cargo-Compartment Door 52-33-11-100-001 Cleaning/Painting of the Bulk Cargo-Compartment Door 52-33-11-200-001 Inspection of the Bulk Cargo-Compartment Door 52-33-11-820-001 Adjustment of the Bulk Cargo-Compartment Door 52-33-13-000-001 Removal of the Lining and Insulation of the Bulk
 Cargo-Compartment Door 52-33-13-400-001 Installation of the Lining and Insulation of the Bulk Cargo-Compartment Door
R **ON A/C 001-003, 051-054,
 52-33-31-991-001 Fig. 401
R **ON A/C 004-049, 055-099, 101-149, 221-221, 224-224, 228-228,
 52-33-31-991-001-A Fig. 401A
R 1EFF : 001-049, 051-099, 101-149, 221-221, 1 52-33-31Page 408 1224-224, 228-228, 1May 01/05 1 1 1CES 1R **ON A/C 001-049, 051-099, 101-149, 221-221, 224-224, 228-228,


 3. Job Set-up
__________ R **ON A/C 001-049, 051-099, 101-105,
 Subtask 52-33-31-860-050
 A. Aircraft Maintenance Configuration
 (1)
 Make sure that the AFT cargo-compartment door is opened (Ref. TASK 52-30-00-860-001).

 (2)
 Make sure that the access platform is in position below the Bulk cargo-compartment door (referred to as Bulk door).

 (3)
 Make sure that the lining and insulation of the BULK door are removed (Ref. TASK 52-33-13-000-001).


 (4) Make sure that the Bulk door is opened (Ref. TASK 52-30-00-860-006). R **ON A/C 106-149, 221-221, 224-224, 228-228,
 Subtask 52-33-31-860-050-A
 A. Aircraft Maintenance Configuration
 (1)
 Make sure that the AFT cargo-compartment door is opened (Ref. TASK 52-30-00-860-001).

 (2)
 Make sure that the access platform is in position below the Bulk cargo-compartment door (referred to as Bulk door).

 (3)
 Make sure that the lining and insulation of the BULK door are removed (Ref. TASK 52-33-13-000-001).
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM DOORS 舱门6(70)