 TASK 52-33-13-400-001 Installation of the Lining and Insulation of the Bulk Cargo-Compartment Door
 1.
 Reason for the Job

__________________
 Self Explanatory


 2.
 Job Set-up Information


______________________
 A. Fixtures, Tools, Test and Support Equipment
 -------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
 -------------------------------------------------------------------------------
No specific access platform 2.0 m (6 ft. 7 in.)
 B. Referenced Information
 -------------------------------------------------------------------------------
REFERENCE DESIGNATION
 -------------------------------------------------------------------------------
52-30-00-860-001 Open the FWD or AFT Cargo-Compartment Door with the Yellow Electric Pump 52-30-00-860-002 Close the FWD or AFT Cargo-Compartment Door with the
 Yellow Electric Pump 52-33-11-100-001 Cleaning/Painting of the Bulk Cargo-Compartment Door 52-33-11-200-001 Inspection of the Bulk Cargo-Compartment Door
R **ON A/C 001-003, 051-054,
 52-33-13-991-001 Fig. 401 R **ON A/C 004-049, 055-099, 101-149, 221-221, 224-224, 228-228,
 52-33-13-991-001-A Fig. 401A
R 1EFF : 001-049, 051-099, 101-149, 221-221, 1 52-33-13Page 406 1224-224, 228-228, 1May 01/05 1 1 1CES 1R **ON A/C 001-049, 051-099, 101-149, 221-221, 224-224, 228-228,


 3. Job Set-up
__________
 Subtask 52-33-13-860-051

 A. Aircraft Maintenance Configuration
 (1)
 Make sure that the access platform 2.0 m (6 ft. 7 in.) is in position at the AFT cargo-compartment door.

 (2)
 Make sure that the AFT cargo-compartment door is opened (Ref. TASK 52-30-00-860-001).

 (3)
 Make sure that the divider net and the door net are removed.


 4. Procedure
_________
 Subtask 52-33-13-210-050

 A. Preparation for Installation
 (1)
 Examine the interspaces and the inner skin of the Bulk cargo door for damage (Ref. TASK 52-33-11-200-001).

 (2)
 Make sure that the inner surface of the outer skin is clean before you install the new self-adhesive insulation panels (Ref. TASK 52-33-11-100-001).


 (3) Make sure that the VELCRO tapes (4) are in the correct condition. R **ON A/C 001-003, 051-054,
 Subtask 52-33-13-420-050
 B. Installation of the Insulation Panels and the Linnings
 (Ref. Fig. 401/TASK 52-33-13-991-001)

 (1) Install the thick self-adhesive insulation panels (5) in the interspaces of the door structure.
 NOTE : Make sure that the insulation panel (5) does not cause a
____ blockage of the rubber flap of the drain hole.
R 1EFF : 001-049, 051-099, 101-149, 221-221, 1 52-33-13Page 407 1224-224, 228-228, 1May 01/05 1 1 1CES 1


 (2)
 Install the thin self-adhesive insulation panels (6) in the applicable interspaces.

 (3)
 Install the linings (1),(2),(3) to the inner skin of the Bulk cargo door and engage the VELCRO tapes (4).

 (4)
 Put the internal door handle (8) in postion to the lever assembly


 (11) and attach it the bolt (7), the washer (9) and the nut (10). R **ON A/C 004-049, 055-099, 101-149, 221-221, 224-224, 228-228,
 Subtask 52-33-13-420-050-A
 B. Installation of the Insulation Panels and the Linnings
 (Ref. Fig. 401A/TASK 52-33-13-991-001-A)

 (1) Install the thick self-adhesive insulation panels (5) in the interspaces of the door structure.
 NOTE : Make sure that the insulation panel (5) does not cause a
____ blockage of the rubber flap of the drain hole.
 (2)
 Install the thin self-adhesive insulation panels (6) in the applicable interspaces.

 (3)
 Install the linings (1),(2),(3) to the inner skin of the Bulk cargo door and engage the VELCRO tapes (4).


R **ON A/C 001-049, 051-099, 101-149, 221-221, 224-224, 228-228,
 5. Close-up
________
 Subtask 52-33-13-410-050

 A. Close Access
 (1)
 Make sure that the work area is clean and clear of tool(s) and other items.

 (2)
 Install the door net at the opening of Bulk cargo door.

 (3)
 Install the divider net at FR59.

 (4)
 Close the AFT cargo-compartment door (Ref. TASK 52-30-00-860-002).


R 1EFF : 001-049, 051-099, 101-149, 221-221, 1 52-33-13Page 408 1224-224, 228-228, 1May 01/05 1 1 1CES 1


 (5) Remove the access platform(s).

R 1EFF : 001-049, 051-099, 101-149, 221-221, 1 52-33-13Page 409 1224-224, 228-228, 1May 01/05 1 1 1CES 1 SEAL - DOOR - REMOVAL/INSTALLATION
 