3. Job Set-up
__________
Subtask 52-33-00-860-053
A. Aircraft Maintenance Configuration
(1)
Put the access platform in postion below the Bulk cargo compartment door (referred to as BULK door).
(2)
Make sure that the BULK door is correctly closed and locked with the internal door handle (Ref. TASK 52-30-00-860-008).
(3)
Do the EIS start procedure (Ref. TASK 31-60-00-860-001).
R 1EFF : 001-003, 051-054, 1 52-33-00Page 405 1 1 May 01/05 1 1 1CES 1
4. Procedure
_________ Subtask 52-33-00-210-050
A. Check of the inoperative BULK Door
(1)
Do a visual check of the external BULK door to make sure that it aligns with the fuselage skin.
(2)
Push against the BULK door from the outer side with handforce to make sure that it does not moves inboard.
(3)
Select the DOOR page on the lower ECAM display unit and examine if the symbol of the BULK door is green.
5. Close-up
________ Subtask 52-33-00-860-054
A. Aircraft Maintenance Configuration
(1)
Do the EIS stop procedure (Ref. TASK 31-60-00-860-002).
(2)
Make an entry in the aircraft log that the external door handle of the BULK door is missing.
(3)
Attach a warning note on the BULK door to tell persons that:
-the external door handle of the BULK door is missing
-but the BULK door is correctly closed and locked.
R 1EFF : 001-003, 051-054, 1 52-33-00Page 406 1 1 May 01/05 1 1 1CES 1
TASK 52-33-00-440-002 Reactivation of the Bulk Cargo Compartment Door
1.
Reason for the Job
__________________
Self Explanatory
2.
Job Set-up Information
______________________
A. Referenced Information
-------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
52-33-21-000-001 Removal of the Door Locking Mechanism 52-33-21-400-001 Installation of the Door Locking Mechanism
3. Job Set-up
__________ Subtask 52-33-00-860-055
A. Remove the warning note from the Bulk door.
4. Procedure
_________ Subtask 52-33-00-020-051
A. If required, remove the remaining part of the external locking handle (Ref. TASK 52-33-21-000-001).
Subtask 52-33-00-420-051
B. Install the new external locking handle (Ref. TASK 52-33-21-400-001).
R 1EFF : 001-003, 051-054, 1 52-33-00Page 407 1 1 May 01/05 1 1 1CES 1
DOOR - BULK CARGO COMPARTMENT - REMOVAL/INSTALLATION
____________________________________________________ TASK 52-33-11-000-001 Removal of the Bulk Cargo-Compartment Door
1.
Reason for the Job
__________________
Self Explanatory
2.
Job Set-up Information
______________________
A. Fixtures, Tools, Test and Support Equipment
-------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
No specific adjustment gage
No specific access platform 2.10 m (6 ft. 11 in.)
No specific access platform 2.30 m (7 ft. 7 in.)
B. Referenced Information
-------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
52-30-00-860-001 Open the FWD or AFT Cargo-Compartment Door with the
Yellow Electric Pump 52-30-00-860-006 Open the Bulk Cargo-Compartment Door 52-30-00-860-010 Open the Deactivated Bulk Cargo-Compartment Door 52-33-11-991-001 Fig. 401
3. Job Set-up
__________ Subtask 52-33-11-010-050
A. Get Access
(1)
Open the AFT cargo-compartment door (Ref. TASK 52-30-00-860-001).
(2)
Put the access platform 2.10 m (6.88 ft.) in position for the AFT cargo-compartment door.
(3)
Put the access platform 2.30 m (7.54 ft.) in position for the Bulk door.