• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-03-27 00:00来源:蓝天飞行翻译 作者:admin
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者


 Subtask 52-36-15-860-055
 C. Preparation for the Test
 (1)
 Remove the warning notices from the ground service panel and the overhead panel of the cockpit.

 (2)
 Connect the PTU isolation coupling (Ref. TASK 29-23-00-860-002).

 (3)
 Pressurize the reservoir of the Yellow hydraulic system (Ref. TASK 29-14-00-614-002).

 (4)
 Pressurize the Yellow hydraulic system (Ref. TASK 29-10-00-863-002).

 (5)
 Remove the actuator safety locks from the applicable cargo door.


 1EFF : ALL 1 52-36-15Page 424 1 1 May 01/05R 1 1 1CES 1


 Subtask 52-36-15-865-061
 D. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s): 1MJ, 3801GX, 3802GX, 3803GX
 Subtask 52-36-15-710-050
 E. Operational Test
 (1)
 Open and close the applicable cargo door hydraulically (Ref. TASK 52-30-00-860-001) several times to make sure that the proximity switch operates satisfactory.

 (2)
 Open the cargo door when the operational test is completed.

 (3)
 Examine the manual selector valve (15) to make sure that there are no leaks .


 5. Close-up
________ R **ON A/C 001-049, 051-099, 101-149, 201-299, 301-399,
 Subtask 52-36-15-410-051
 A. Close Access
 (1)
 Make sure that the work area is clean and clear of tool(s) and other items.

 FOR 2501MJ

 (2)
 Install the floor panel you removed to get access to the manual selector valve (Ref. TASK 53-22-14-400-001).

 (3)
 Close the FWD cargo door (Ref. TASK 52-30-00-860-002). FOR 2504MJ

 (4)
 Install the floor panel you removed to get access to the manual selector valve (Ref. TASK 53-42-14-400-001).

 (5)
 Close the AFT cargo door (Ref. TASK 52-30-00-860-002).


 1EFF : ALL 1 52-36-15Page 425 1 1 May 01/05 1 1 1CES 1R **ON A/C 151-199, 401-499,


 Subtask 52-36-15-410-051-A
 A. Close Access
 (1)
 Make sure that the work area is clean and clear of tool(s) and other items.

 FOR 2501MJ

 (2)
 Install the floor panel you removed to get access to the manual selector valve (Ref. TASK 53-22-14-400-001).

 (3)
 Close the FWD cargo door (Ref. TASK 52-30-00-860-002). FOR 2504MJ

 (4)
 Install the floor panel you removed to get access to the manual selector valve (Ref. TASK 53-42-14-400-001).

 (5)
 Close the AFT cargo door (Ref. TASK 52-30-00-860-002).


R 1EFF : 151-199, 401-499, 1 52-36-15Page 426 1 1 Aug 01/05 1 1 1CES 1 ACTUATOR - DOOR (2502MJ,2503MJ,2505MJ,2506MJ) - REMOVAL/INSTALLATION


____________________________________________________________________
 TASK 52-36-18-000-001
 Removal of the Door Actuator 2502MJ/2503MJ/2505MJ/2506MJ
 WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROL SURFACES ARE
_______ CLEAR BEFORE YOU PRESSURIZE/DEPRESSURIZE A HYDRAULIC SYSTEM.
 WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______ GEAR.
 1. Reason for the Job
__________________
 Self Explanatory
 2. Job Set-up Information
______________________
 A. Fixtures, Tools, Test and Support Equipment
 -------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
No specific blanking caps No specific blanking plugs No specific circuit breaker(s) safety clip(s) No specific container No specific access platform 3.5 m (11 ft. 6 in.)
 B. Referenced Information
 -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
29-00-00-864-001 Put the Related Hydraulic System in the Depressurized
 Configuration before Maintenance Action 29-00-00-910-002 Safety Procedures of the Hydraulic System 29-14-00-614-001 Depressurization of the Hydraulic Reservoirs 29-23-00-860-001 Disconnection of the Isolation Coupling of the Power
 Transfer Unit (PTU) 52-30-00-860-001 Open the FWD or AFT Cargo-Compartment Door with the Yellow Electric Pump 52-36-18-991-001 Fig. 401
 1EFF : ALL 1 52-36-18Page 401 1 1 Feb 01/98 1 1 1CES 1


 3. Job Set-up
__________
 Subtask 52-36-18-010-051

 A. Get Access
 (1) Open the FWD and/or AFT cargo-compartment door and install the support struts (Ref. TASK 52-30-00-860-001).
 (2) Put the access platform in position below the opened cargo door. Subtask 52-36-18-865-050
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM DOORS 舱门6(127)