• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-03-27 00:00来源:蓝天飞行翻译 作者:admin
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

R 123VU Y HYD/ELEC/ELEC PUMP/NORM 3801GX AB03
 Subtask 52-36-18-860-054
 C. Aircraft Maintenance Configuration
 (1)
 Obey the hydraulic safety procedures (Ref. TASK 29-00-00-910-002).

 (2)
 Make sure that the Yellow hydraulic system is depressurized and put it in the maintenance configuration. (Ref. TASK 29-00-00-864-001).

 (3)
 Depressurize the reservoir of the Yellow hydraulic system (Ref. TASK 29-14-00-614-001).

 (4)
 Disconnect the isolation coupling of the Power Transfer Unit (PTU) (Ref. TASK 29-23-00-860-001).

 (5)
 Put the warning notices in position to tell persons not to pressurize the Yellow hydraulic system:

 -In the cockpit on the hydraulic section 40VU of the overhead panel,
 -On the ground service panel of the Yellow hydraulic system.

 (6)
 Put the spillage container below the proximity switch of the applicable door actuator to collect the hydraulic fluid.


 1EFF : ALL 1 52-36-18Page 415 1 1 Feb 01/99 1 1 1CES 1


 4. Procedure
_________
 (Ref. Fig. 402/TASK 52-36-18-991-003) Subtask 52-36-18-020-051
 A. Removal of the Proximity Switch
 (1)
 Disconnect the electrical connector (1) from the proximity switch (2).

 (2)
 Put blanking caps on the disconnected electrical connector (1) and on the receptacle of the proximity switch (2).

 (3)
 Cut and remove the lockwire from the proximity switch (2).

 (4)
 Remove the proximity switch (2) together with the O-ring (4) and the back-up ring (3) from the switch housing (5).

 (5)
 Discard the O-ring (4) and the back-up ring (3).


 1EFF : ALL 1 52-36-18Page 416 1 1 Feb 01/98 1 1 1CES 1


 Proximity Switch
 Figure 402/TASK 52-36-18-991-003
 1EFF :  ALL  1  52-36-18 Page 417 
1  1  Feb 01/98
 1  1
 1CES  1

 

 TASK 52-36-18-400-002
 Installation of the Proximity Switch

 1.
 Reason for the Job

__________________
 Self Explanatory


 2.
 Job Set-up Information


______________________
 A. Fixtures, Tools, Test and Support Equipment
 -------------------------------------------------------------------------------
REFERENCE  QTY DESIGNATION
 -------------------------------------------------------------------------------
No specific spillage container R No specific Torque Wrench : range 0.00 to 1.20 m.daN R (0.00 to 9.00 lbf.ft)
 B. Consumable Materials
 -------------------------------------------------------------------------------
REFERENCE  DESIGNATION
 -------------------------------------------------------------------------------
No specific  lockwire, corrosion-resistant steel, dia. 0.8 mm
 (0.032 in.)
 Material No. 05-002  USA MIL-P-8116 PUTTY, ZINC CHROMATE GENERAL PURPOSE (Ref. 20-31-00)
 C. Expendable Parts
 -------------------------------------------------------------------------------
FIG.ITEM |DESIGNATION  |IPC-CSN
 -------------------------------------------------------------------------------
3 back-up ring 52-36-18 01 -060 4 O-ring 52-36-18 01 -050
 1EFF : ALL 1 52-36-18Page 418 1 1 May 01/05 1 1 1CES 1R D. Referenced Information


 -------------------------------------------------------------------------------
REFERENCE DESIGNATION
 -------------------------------------------------------------------------------
29-00-00-864-001 Put the Related Hydraulic System in the Depressurized
 Configuration before Maintenance Action 29-00-00-910-002 Safety Procedures of the Hydraulic System 29-14-00-614-001 Depressurization of the Hydraulic Reservoirs 29-14-00-614-002 Pressurization of the Hydraulic Reservoirs through
 the Ground Connector 29-23-00-860-001 Disconnection of the Isolation Coupling of the Power Transfer Unit (PTU) 29-23-00-860-002 Connection of the Isolation Coupling of the Power Transfer Unit (PTU) 29-24-00-863-001 Pressurize the Yellow Hydraulic System with the Electric Pump 52-30-00-860-001 Open the FWD or AFT Cargo-Compartment Door with the Yellow Electric Pump 52-30-00-860-002 Close the FWD or AFT Cargo-Compartment Door with the Yellow Electric Pump 52-36-00-600-001 Hydraulic System for the Cargo Compartment Doors -Servicing
 3. Job Set-up
__________
 Subtask 52-36-18-865-054
 A. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged
 -------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------121VU HYDRAULIC/HYD POWER/Y 3803GX N30 122VU DOORS/CARGO 1MJ T12 123VU Y HYD/ELEC/PUMP 3802GX AB06 123VU Y HYD/ELEC/ELEC PUMP/NORM 3801GX AB03
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM DOORS 舱门6(132)