(183) from the the link lever (40).
(c)
Remove the nuts (188), the sleeves (189) and the tapered pins
(187) from the interlock cam (186).
(d)
Remove the nut (192), the sleeve (193) and the tapered pin (191) from the the control lever (190).
R 1EFF : 001-049, 053-099, 101-149, 151-199, 1 52-32-21Page B485 1201-299, 301-399, 401-499, 1Aug 01/05 1 1 1CES 1
Latching Shaft Assembly
Figure 417/TASK 52-32-21-991-017- 12 (SHEET 1)
R 1EFF : 001-049, 053-099, 101-105, 201-220, 1 52-32-21Page B486 1 1 Aug 01/05 1 1 1CES 1
Latching Shaft Assembly
Figure 417/TASK 52-32-21-991-017- 22 (SHEET 2)
R 1EFF : 001-049, 053-099, 101-105, 201-220, 1 52-32-21Page B487 1 1 Aug 01/05 1 1 1CES 1
Latching Shaft Assembly
Figure 417A/TASK 52-32-21-991-017-B12 (SHEET 1)
R 1EFF : 106-149, 221-299, 301-399, 1 52-32-21Page B488 1 1 Aug 01/05 1 1 1CES 1
Latching Shaft Assembly
Figure 417A/TASK 52-32-21-991-017-B22 (SHEET 2)
R 1EFF : 106-149, 221-299, 301-399, 1 52-32-21Page B489 1 1 Aug 01/05 1 1 1CES 1
Latching Shaft Assembly
Figure 417B/TASK 52-32-21-991-017-A12 (SHEET 1)
R 1EFF : 151-199, 1 52-32-21Page B490 1 1 Aug 01/05 1 1 1CES 1
Latching Shaft Assembly
Figure 417B/TASK 52-32-21-991-017-A22 (SHEET 2)
R 1EFF : 151-199, 1 52-32-21Page B491 1 1 Aug 01/05 1 1 1CES 1
R Latching Shaft Assembly
R Figure 417C/TASK 52-32-21-991-017-C12 (SHEET 1)
R 1EFF : 401-499, 1 52-32-21Page B492 1 1 Aug 01/05 1 1 1CES 1
R Latching Shaft Assembly
R Figure 417C/TASK 52-32-21-991-017-C22 (SHEET 2)
R 1EFF : 401-499, 1 52-32-21Page B493 1 1 Aug 01/05 1 1 1CES 1
(e) Remove the locking shaft (171) slowly through the lateral cutout of the cargo door.
NOTE : Collect the shaft levers (175), the control lever (190),
____ the link lever (40) and the interlock cam (186) during this movement.
(4)
Remove the shaft levers (175),the control lever (190) and the interlock cam (186) while you remove the locking shaft (171) from the cargo door.
(5)
If necessary, remove the target from the control lever (190) (Ref. TASK 52-35-13-000-002).
R 1EFF : 001-049, 053-099, 101-149, 151-199, 1 52-32-21Page B494 1201-299, 301-399, 401-499, 1Aug 01/05 1 1 1CES 1 TASK 52-32-21-400-012
Installation of the Latching Shaft Assembly
1. Reason for the Job
__________________
Self Explanatory
2. Job Set-up Information
______________________
A. Fixtures, Tools, Test and Support Equipment
-------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
No specific access platform 3.5 m (11 ft. 6 in.)
B. Consumable Materials
-------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
Material No. 04-004 USA MIL-PRF-23827 TYPE I SYNTH.ESTER BASED GREASE HIGH PRESSURE (Ref. 20-31-00)
Material No. 09-016 USA MIL-PRF-81733D TYPE II CLASS B CORROSION INHIBITING FILLET CONSISTENCY (Ref. 20-31-00)
Material No. 15-005 AIB TN 10138 TYPE I GRADE 2 CORROSION PREVENTIVE TEMPORARY PROTECTIVE COMPOUND (Ref. 20-31-00)
Material No. 15-006 AIB TN 10138 TYPE I GRADE 3 CORROSION PREVENTIVE TEMPORARY PROTECTIVE COMPOUND (Ref. 20-31-00)
C. Expendable Parts
-------------------------------------------------------------------------------FIG.ITEM |DESIGNATION |IPC-CSN -------------------------------------------------------------------------------
41 cotter pin 52-32-21 33 -150 41 cotter pin 52-32-21 34 -150 172 cotter pin 52-32-21 37 -240 172 cotter pin 52-32-21 38 -240
R 1EFF : 001-049, 053-099, 101-149, 151-199, 1 52-32-21Page B495 1201-299, 301-399, 401-499, 1Aug 01/05 1 1 1CES 1
D. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
52-30-00-860-001 Open the FWD or AFT Cargo-Compartment Door with the Yellow Electric Pump 52-30-00-860-002 Close the FWD or AFT Cargo-Compartment Door with the
Yellow Electric Pump 52-32-00-720-001 Functional Test of the AFT Cargo-Compartment Door 52-32-11-820-002 Adjustment of the Door Mechanism 52-35-13-400-002 Installation of the Proximity Switches 5MJ and 12MJ