R R  (7) Assemble the fairing (1) to the tail cone (11) and lock the five stud nuts (2).
 Subtask 52-41-18-710-050 
R R R  D. Do the operational test of the tail navigation-light 15LA (Ref. TASK 33-41-00-710-001) and the tail cone strobe-light 19LV (Ref. TASK 33-48-00-710-002).
 5. Close-up________
 Subtask 52-41-18-865-052
 A. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s): 1LA, 1KD, 2KD
 Subtask 52-41-18-860-052
 B. Put the aircraft back to the serviceable condition. 
R R  (1) Fill the clearance between the fairing (1) and the tail cone (11) with the SEALANTS (Material No. 09-016).
 (2) Remove the warning notice(s).

 

 (3) Remove the access platform(s).

 1EFF : ALL 1 52-41-18Page 408 1 1 May 01/05 1 1 1CES 1 DOOR - APU ACCESS - REMOVAL/INSTALLATION


________________________________________
 TASK 52-41-21-000-001
 Removal of the APU Access Door 315AL
 WARNING : DO NOT TOUCH THE APU UNTIL IT IS SUFFICIENTLY COOL TO PREVENT BURNS
_______
 WHEN YOU DO THE MAINTENANCE TASK(S).

 1.
 Reason for the Job

__________________
 Self Explanatory


 2.
 Job Set-up Information


______________________
 A. Fixtures, Tools, Test and Support Equipment
 -------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
 -------------------------------------------------------------------------------
No specific circuit breaker(s) safety clip(s)
 No specific warning notice
 No specific access platform 4.0 m (13 ft. 1 in.)

 B. Referenced Information
 -------------------------------------------------------------------------------
REFERENCE DESIGNATION
 -------------------------------------------------------------------------------
52-41-00-010-001 Open the APU Doors for Access
 52-41-21-991-001 Fig. 401
 52-41-21-991-002 Fig. 402

 3. Job Set-up
__________
 Subtask 52-41-21-860-050

 A. Safety Precautions R (1) Put the access platform in position below the APU compartment.
 (2) Put the warning notice in the flight compartment to tell persons not to start the APU.
 1EFF : ALL 1 52-41-21Page 401 1 1 May 01/04 1 1 1CES 1 Subtask 52-41-21-865-050


 B. Open, safety and tag this(these) circuit breaker(s):
 -------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------121VU APU/APU/CTL 2KD L42 121VU APU/ECB/SPLY 1KD L41
 Subtask 52-41-21-010-050
 C. Get Access
 (1) Open the APU access doors 315AL, 316AR and (Ref. TASK 52-41-00-010-001).
 4. Procedure
_________ (Ref. Fig. 401/TASK 52-41-21-991-001, 402/TASK 52-41-21-991-002) Subtask 52-41-21-020-050
 A. Removal of the APU Access Door
 (1)
 Remove the screws (12) and the washers (13) and disconnect the bonding strap (11) from the APU access door (1).

 (2)
 Hold the APU access door (1) and remove the three pip-pins (10).

 (3)
 Remove the APU access door (1).


 1EFF : ALL 1 52-41-21Page 402 1 1 Feb 01/98 1 1 1CES 1


 INTENTIONALLY BLANK

 1 1
52-41-21Page 403
1 1 Feb 01/98 1 1 1CES 1


R  APU Access Door 315AL Figure 401/TASK 52-41-21-991-001- 12 (SHEET 1)
 1EFF : 1 1 1CES  ALL  1 111 52-41-21 Page 404 May 01/00

 

R  APU Access Door 315AL Figure 401/TASK 52-41-21-991-001- 22 (SHEET 2)
 1EFF : 1 1 1CES  ALL  1 111 52-41-21 Page 405 May 01/00

 

 APU Access Door Sealing
 Figure 402/TASK 52-41-21-991-002
 1EFF :  ALL  1  52-41-21 Page 406 
1  1  Feb 01/98
 1  1
 1CES  1

 

 TASK 52-41-21-400-001
 Installation of the APU Access Door 315AL
 WARNING : DO NOT TOUCH THE APU UNTIL IT IS SUFFICIENTLY COOL TO PREVENT BURNS
_______
 WHEN YOU DO THE MAINTENANCE TASK(S).

 1. Reason for the Job
__________________
 Self Explanatory
 2. Job Set-up Information
______________________
 A. Fixtures, Tools, Test and Support Equipment
 -------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM DOORS 舱门6(156)