3. Job Set-up
__________ Subtask 52-33-00-010-050
A. Get Access
(1)
Put the access platform in postion below the Bulk cargo compartment door (referred to as BUlk door.
(2)
Attach a warning note on the Bulk door to tell persons that the door balance mechanism is inoperative.
R 1EFF : 001-049, 051-099, 101-105, 1 52-33-00Page 401 1 1 May 01/05 1 1 1CES 1
4. Procedure
_________ Subtask 52-33-00-869-050
A. Operation of the Bulk Door with an inoperative Balance Mechanism
(1) Open the Bulk door as follows:
(a) If you will open the Bulk cargo door from the outer side, push the button of the external door handle.
NOTE : This causes the external door handle releases from its
____
recess.
(b)
Move the internal or external door handle to the OPEN position.
(c)
Push the Bulk door inboard and put the door handle to the LOCKED position.
NOTE : If you used the external door handle, push it into its
____
recess again.
(d)
Move the Bulk door manually inboards until the hook engages with the hook arrester of the fuselage crossbeam.
(e)
Safety the Bulk door additionally with arope or strap on the hook arrester of the fuselage.
NOTE : This prevents that the Bulk door falls down when you
____ release the hook during the closing procedure.
(2) Close the Bulk door as follows:
(a)
Push the button of the external door handle to release it from its recess.
(b)
Move the external door handle to the OPEN position and hold the Bulk door to prevent that it falls down.
(c)
If you will close the Bulk door from the inner side, continuesas follows:
1 Move the Bulk door slowly down until the hook is free from the
_
hook arrester.
2 Move the external door handle to the LOCKED position and push
_
it into its recess.
R 1EFF : 001-049, 051-099, 101-105, 1 52-33-00Page 402 1 1 May 01/05 1 1 1CES 1 3 Make sure that the internal door handle is the UNLOCKED
_
position.
(d)
Move the Bulk door down into the door opening and put the applicable door handle into the LOCKED position.
(e)
If you closes the Bulk door from the outer side, push the external door handle into its recess.
5. Close-up
________ Subtask 52-33-00-860-050
A. Close Access
(1)
Remove the access platform(s).
(2)
Make an entry in the aircraft technical log that the balance mechanism of the Bulk door is deactivated.
R 1EFF : 001-049, 051-099, 101-105, 1 52-33-00Page 403 1 1 May 01/05 1 1 1CES 1
TASK 52-33-00-440-001 Reactivation of the Bulk Cargo Compartment Door
1. Reason for the Job
__________________
Refer to the MMEL TASK: 52-33-01
Bulk Cargo
Cargo Door Balance Mechanism
2. Job Set-up Information
______________________
A. Referenced Information
-------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
52-33-41-000-001 Removal of the Balance Mechanism 52-33-41-400-001 Installation of the Balance Mechanism
3. Job Set-up
__________ Subtask 52-33-00-860-051
A. Remove the warning note from the Bulk door.
4. Procedure
_________ Subtask 52-33-00-020-050
A. Remove the inoperative balance mechanism (Ref. TASK 52-33-41-000-001). Subtask 52-33-00-420-050
B. Install the balance mechanism (Ref. TASK 52-33-41-400-001).
R 1EFF : 001-049, 051-099, 101-105, 1 52-33-00Page 404 1 1 May 01/05 1 1 1CES 1R **ON A/C 001-003, 051-054,
TASK 52-33-00-040-002
Deactivation of the Bulk Cargo Compartment Door
1. Reason for the Job
__________________
Refer to the CDL TASK: 52-14
Bulk Door Handle
2. Job Set-up Information
______________________
A. Fixtures, Tools, Test and Support Equipment
-------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM DOORS 舱门6(27)