(3) Put blanking plugs on the disconnected line ends. Subtask 52-36-00-865-057
B. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s): 1MJ, 3801GX, 3802GX, 3803GX
Subtask 52-36-00-860-058
C. Preparation for the Test
(1)
Remove the warning notices from the overhead panel of the cockpit.
(2)
Pressurize the reservoir of the Yellow hydraulic system (Ref. TASK 29-14-00-614-002).
(3)
Pressurize the Yellow hydraulic system (Ref. TASK 29-10-00-863-002).
(4)
Push the PTU P/B switch on the overhead panel 40VU to activate the power transfer unit.
1EFF : ALL 1 52-36-00Page 412 1 1 Feb 01/99R 1 1 1CES 1
Hand Pump Figure 402/TASK 52-36-00-991-002
1EFF : 1 1R 1CES ALL 1 11 1 52-36-00 Page 413 Feb 01/99
Subtask 52-36-00-790-052
D. Leak Check of the Door Hydraulic System
(1) Turn the selector of the service panel to the OPEN position and hold it until the cargo door is fully opened.
(2) Turn the selector of the service panel to the CLOSE position and hold R it until the cargo door is closed.
(3)
Open and close the cargo door three times to bleed the door hydraulic system.
(4)
Do a visual inspection to make sure that there are no leaks at the disconnected hydraulic lines.
(5)
Check the level of the Yellow reservoir on the HYD page of the lower display unit of the ECAM system. If necessary, fill the Yellow reservoir (Ref. TASK 12-12-29-611-001).
5. Close-up
________
Subtask 52-36-00-410-053
A. Close Access
(1)
Make sure that the work area is clean and clear of tool(s) and other items.
(2)
Remove the container.
(3)
Make sure that the FWD or AFT cargo door is correctly closed (Ref. TASK 52-30-00-860-002).
(4) Install the access panel 198DB. R (5) Close the access door 198CB of the Yellow ground service panel.
(6) Remove the access platform(s).
1EFF : ALL 1 52-36-00Page 414 1 1 Nov 01/01 1 1 1CES 1
TASK 52-36-00-440-002 Reactivation of the Hand Pump
1.
Reason for the Job
__________________
Self Explanatory
2.
Job Set-up Information
______________________
A. Fixtures, Tools, Test and Support Equipment
-------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
No specific access platform 1.76 m (5 ft. 9 in.)
B. Referenced Information
-------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
52-36-11-000-001 Removal of the Hand Pump 3009GM 52-36-11-400-001 Installation of the Hand Pump 3009GM
3. Job Set-up
__________ Subtask 52-36-00-860-059
A. Aircraft Maintenance Configuration
(1)
Make sure that the access platform is in positon below the Yellow ground service panel.
(2)
Make sure that the access door 198CB is opened and the access panel 198DB is removed.
4. Procedure
_________ Subtask 52-36-00-020-051
A. Remove the defective hand pump (Ref. TASK 52-36-11-000-001).
1EFF : ALL 1 52-36-00Page 415 1 1 Feb 01/99R 1 1 1CES 1
Subtask 52-36-00-420-051
B. Install the replacement hand pump (Ref. TASK 52-36-11-400-001).
1EFF : ALL 1 52-36-00Page 416 1 1 Feb 01/99R 1 1 1CES 1
Closing of the Cargo Door with the Crane
Figure 403/TASK 52-36-00-991-004
1EFF : ALL 1 52-36-00 Page 417
1 1 Feb 01/99
1 1
1CES 1
CARGO COMPARTMENT DOOR HYDRAULIC SYSTEM - INSPECTION/CHECK
__________________________________________________________
TASK 52-36-00-200-001
Inspection/Check of the Cargo Compartment Door Hydraulic System
1. Reason for the Job
__________________
To examine the condition of the pipes, fittings and related components of the cargo compartment door hydraulic system.
2. Job Set-up Information
______________________
A. Fixtures, Tools, Test and Support Equipment
-------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM DOORS 舱门6(108)