• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-03-27 00:00来源:蓝天飞行翻译 作者:admin
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

 Safety the jam nuts (47) with lockwire corrosion-resistance steel, dia 0.63/mm on the safety rings (48).

 (3)
 Safety the nut (42) with new cotter pin (41).


 5. Close-up
________ Subtask 52-33-11-410-060
 A. Close Access
 (1)
 Close the Bulk door correctly (Ref. TASK 52-30-00-860-008).

 (2)
 Remove the adjustment gage from the stop fitting (53).

 (3)
 Make sure that the work area is clean and clear of tool(s) and other items.

 (4)
 Install the insulation packs in the work area and the protection lining on the Bulk door (Ref. TASK 52-33-13-400-001).

 (5)
 Install the door net into the opening of the Bulk door.

 (6)
 Install the divider net between the Bulk/AFT cargo compartment at FR59.

 (7)
 Close the AFT cargo-compartment door (Ref. TASK 52-30-00-860-002).

 (8)
 Remove the access platform(s).


 1EFF : 001-049, 051-099, 101-149, 221-221, 1 52-33-11Page 543 1224-224, 228-228, 1May 01/05 1 1 1CES 1 DOOR - BULK CARGO COMPARTMENT - INSPECTION/CHECK


________________________________________________
 TASK 52-33-11-200-001
 Inspection of the Bulk Cargo-Compartment Door
 1. Reason for the Job
__________________
 Self Explanatory
 2. Job Set-up Information
______________________
 A. Fixtures, Tools, Test and Support Equipment
 -------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
No specific access platform/2.30/m
 B. Consumable Materials
 -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
Material No. 05-027 USA MIL-L-81309
 RUST INHIBITOR(FOR CORROSION USE 15-004)
 (Ref. 20-31-00)
 C. Referenced Information
 -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
20-28-00-912-001 Electrical Bonding of Components with Rivets 51-75-12-300-001 Repair of Major Paint Damage on Light Alloy and
 Composite Material 52-30-00-860-006 Open the Bulk Cargo-Compartment Door 52-30-00-860-008 Close the Bulk Cargo-Compartment Door 52-30-00-860-010 Open the Deactivated Bulk Cargo-Compartment Door 52-30-00-860-011 Close the Deactivated Bulk Cargo-Compartment Door 52-33-11-820-001 Adjustment of the Bulk Cargo-Compartment Door 52-33-13-000-001 Removal of the Lining and Insulation of the Bulk
 Cargo-Compartment Door
R 1EFF : 001-049, 051-099, 101-149, 221-221, 1 52-33-11Page 601 1224-224, 228-228, 1May 01/05 1 1 1CES 1 -------------------------------------------------------------------------------


REFERENCE DESIGNATION
 -------------------------------------------------------------------------------
52-33-13-400-001 Installation of the Lining and Insulation of the Bulk
 Cargo-Compartment Door
 52-33-21-000-001 Removal of the Door Locking Mechanism
 52-33-41-000-001 Removal of the Balance Mechanism
 __________

3. Job Set-up
R **ON A/C 001-049, 051-099, 101-105,
 Subtask 52-33-11-010-052
 A. Get Access
 (1)
 Put the access platform/2.30/m in position below the Bulk cargo-compartment door (referred to as Bulk door).

 (2)
 Open the Bulk door (Ref. TASK 52-30-00-860-006).

 (3)
 Remove the lining and insulation of the Bulk door (Ref. TASK 52-33-13-000-001).


R **ON A/C 106-149, 221-221, 224-224, 228-228,
 Subtask 52-33-11-010-052-A
 A. Get Access
 (1)
 Put the access platform/2.30/m in position below the Bulk cargo-compartment door (referred to as Bulk door).

 (2)
 Open the Bulk door (Ref. TASK 52-30-00-860-010).

 (3)
 Remove the lining and insulation of the Bulk door (Ref. TASK 52-33-13-000-001).


R 1EFF : 001-049, 051-099, 101-149, 221-221, 1 52-33-11Page 602 1224-224, 228-228, 1May 01/05 1 1 1CES 1


R **ON A/C 001-049, 051-099, 101-149, 221-221, 224-224, 228-228,

 4. Procedure
_________ Subtask 52-33-11-210-053
 A. Inspection of the Bulk Door Structure
 (1)
 Examine the liquid drain device on the lower beam to make sure that it is not blocked.

 (2)
 Examine all rivets of the hatch structure.

 (a)
 If you find an empty rivet hole, install a new rivet with the correct sealant.
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM DOORS 舱门6(42)