(2)
Install the door net into the opening of the Bulk door.
(3)
Install the divider net between the Bulk/ AFT cargo compartment at FR59.
(4)
Close the AFT cargo-compartment door (Ref. TASK 52-30-00-860-002).
R 1EFF : 001-049, 051-099, 101-149, 221-221, 1 52-33-11Page 534 1224-224, 228-228, 1May 01/05 1 1 1CES 1
(5) Remove the access platform(s).
R 1EFF : 001-049, 051-099, 101-149, 221-221, 1 52-33-11Page 535 1224-224, 228-228, 1May 01/05 1 1 1CES 1
TASK 52-33-11-820-003 Adjustment of the Balance Mechanism
1. Reason for the Job
__________________
Self Explanatory
2. Job Set-up Information
______________________
A. Fixtures, Tools, Test and Support Equipment
-------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
No specific adjustment gage
No specific access platform 2.10 m (6 ft. 11 in.)
No specific access platform 2.30 m (7 ft. 7 in.)
B. Consumable Materials
-------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
No specific lockwire corrosion-resistance steel, dia 0.63 mm No specific lockwire corrosion-resistance steel, dia 0.63/mm
C. Expendable Parts
-------------------------------------------------------------------------------FIG.ITEM |DESIGNATION |IPC-CSN -------------------------------------------------------------------------------
41 cotter pin 52-33-04 01 -070 41 cotter pin 52-33-04 01A-070
R 1EFF : 001-049, 051-099, 101-149, 221-221, 1 52-33-11Page 536 1224-224, 228-228, 1May 01/05 1 1 1CES 1
D. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
52-30-00-860-001 Open the FWD or AFT Cargo-Compartment Door with the Yellow Electric Pump 52-30-00-860-002 Close the FWD or AFT Cargo-Compartment Door with the
Yellow Electric Pump 52-30-00-860-006 Open the Bulk Cargo-Compartment Door 52-30-00-860-008 Close the Bulk Cargo-Compartment Door 52-33-13-000-001 Removal of the Lining and Insulation of the Bulk
Cargo-Compartment Door 52-33-13-400-001 Installation of the Lining and Insulation of the Bulk Cargo-Compartment Door
R **ON A/C 001-003, 051-054,
52-33-11-991-006 Fig. 507
R **ON A/C 004-049, 055-099, 101-149, 221-221, 224-224, 228-228,
52-33-11-991-006-A Fig. 507A
R **ON A/C 001-049, 051-099, 101-149, 221-221, 224-224, 228-228,
3. Job Set-up
__________
Subtask 52-33-11-010-058
A. Get Access
(1)
Open the AFT cargo-compartment door (Ref. TASK 52-30-00-860-001) to get access to the inner side of the closed Bulk door.
(2)
Put the access platform (2.10 m (6 ft. 11 in.)) in position for the AFT cargo-compartment door.
(3)
Put the access platform (2.30 m (7 ft. 7 in.)) in position for the Bulk door.
(4)
Remove the divider net between the AFT/Bulk cargo compartment at FR59.
R 1EFF : 001-049, 051-099, 101-149, 221-221, 1 52-33-11Page 537 1224-224, 228-228, 1May 01/05 1 1 1CES 1
(5)
Remove the door net from the opening of the Bulk door.
(6)
Remove the protection lining and insulation packs (Ref. TASK 52-33-13-000-001) to get access to the components of the balance mechanism.
4. Procedure
_________ R **ON A/C 001-003, 051-054,
(Ref. Fig. 507/TASK 52-33-11-991-006) R **ON A/C 004-049, 055-099, 101-149, 221-221, 224-224, 228-228,
(Ref. Fig. 507A/TASK 52-33-11-991-006-A) R **ON A/C 001-049, 051-099, 101-149, 221-221, 224-224, 228-228,
Subtask 52-33-11-820-055
A. Adjustment of the Balance Mechanism
(1) Release the pre-tension of the balance mechanism as follows:
(a) Install the adjustment gage between the forward lever (52) and the stop fitting (53) of the Bulk door structure.
NOTE : The thickness of the adjustment gage must be between 17.7
____ mm (0.6968 in.) and 18.3 mm (0.7204 in.).
(b)
Open the Bulk door carefully (Ref. TASK 52-30-00-860-006).
(c)
Disconnect the connection rod (50) from the fuselage fitting (44) as follows: