• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-03-27 00:00来源:蓝天飞行翻译 作者:admin
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

 Reason for the Job

__________________
 Self Explanatory


 2.
 Job Set-up Information


______________________
 A. Fixtures, Tools, Test and Support Equipment
 -------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
No specific circuit breaker(s) safety clip(s) No specific access platform 1.80 m (5 ft. 11 in.)
 B. Referenced Information
 -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
52-41-12-991-001 Fig. 401
 3. Job Set-up
__________ Subtask 52-41-12-865-050
 A. Open, safety and tag this(these) circuit breaker(s):
 -------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------
121VU EIS/SDAC1 AND 2/DOOR/DET/AVNCS 46WV P02
 Subtask 52-41-12-010-050
 B. Get Access
 (1)
 Put an access platform in position at zone 125.

 (2)
 Open the door 812.


 1EFF : ALL 1 52-41-12Page 401 1 1 Feb 01/98 1 1 1CES 1


 4. Procedure
_________ Subtask 52-41-12-020-050
 A. Removal of the Avionics-Compartment Lateral-Left Door (Ref. Fig. 401/TASK 52-41-12-991-001)
 (1)
 Disconnect the bonding leads (2).

 (2)
 Remove and discard the cotter pins (4).

 (3)
 Remove the nuts (3) and the washer (9).

 (4)
 Hold the avionics-compartment lateral-left door (1).

 (5)
 Remove the pins (7).

 (6)
 Remove the avionics-compartment lateral-left door (1).

 (7)
 Remove the bushes (6), (8) and (5).


 1EFF : ALL 1 52-41-12Page 402 1 1 Feb 01/98 1 1 1CES 1


 Avionics-Compartment Lateral-Left Door
 Figure 401/TASK 52-41-12-991-001
 1EFF :  ALL  1  52-41-12 Page 403 
1  1  Feb 01/98
 1  1
 1CES  1

 

 TASK 52-41-12-400-001
 Installation of the Avionics-Compartment Lateral-Left Door
 1. Reason for the Job
__________________
 Self Explanatory
 2. Job Set-up Information
______________________
 A. Fixtures, Tools, Test and Support Equipment
 -------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
No specific dynamometer 20 daN (44.9617 lbf)
 No specific Torque Wrench : range 0.35 to 0.45 daN

 (0.78 to 1.01 lbf)
 No specific Torque Wrench : range 8 to 15 daN

 (17.98 to 33.72 lbf)
 B. Consumable Materials
 -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
Material No. 04-012  USA VV-P-236 PURE MINERALVASELINE OR PETRO- LATUM (Ref. 20-31-00)
 Material No. 11-004  USA MIL-T-81533
 1.1.1TRICHLOROETHANE (METHYL CHLOROFORM)
 (Ref. 20-31-00)

 C. Expendable Parts
 -------------------------------------------------------------------------------FIG.ITEM |DESIGNATION |IPC-CSN -------------------------------------------------------------------------------
4 cotter pins 52-41-01 02 -030 R 4 cotter pins 52-41-01 02A-030
 1EFF : ALL 1 52-41-12Page 404 1 1 Feb 01/04 1 1 1CES 1 D. Referenced Information


 -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
52-71-00-710-001 Operational Test of the Door Warning System 52-41-12-991-001 Fig. 401 52-41-12-991-003 Fig. 402
 3. Job Set-up
__________ Subtask 52-41-12-860-050
 A. Aircraft Maintenance Configuration
 (1) Make sure that the access platform is in position. Subtask 52-41-12-865-051
 B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged
 -------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------
121VU EIS/SDAC1 AND 2/DOOR/DET/AVNCS 46WV P02
 Subtask 52-41-12-916-050
 C. Preparation for Installation
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM DOORS 舱门6(144)