• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-03-26 14:43来源:蓝天飞行翻译 作者:admin
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

 3. Job Set-up
__________ Subtask 49-51-54-860-050
 A. Aircraft Maintenance Configuration
 (1)
 Energize the ground service network
 (Ref. TASK 24-42-00-861-001).


 (2)
 On the panel 25VU, make sure that the APU MASTER SW pushbutton switch is off.

 (3)
 Put a warning notice in the cockpit to tell persons not to start the APU.

 (4)
 Depressurize the aircraft hydraulic systems
 (Ref. TASK 29-00-00-864-001).

 

 

 Subtask 49-51-54-865-050
 B. Open, safety and tag this(these) circuit breaker(s):
 -------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------121VU APU/APU/CTL 2KD L42 121VU APU/ECB/SPLY 1KD L41
 Subtask 49-51-54-010-050
 C. Get Access
 (1)
 Put the access platform in position below the APU access doors 315AL and 316AR.

 (2)
 Open the APU access doors 315AL, 316AR (Ref. TASK 52-41-00-010-001).

 (3)
 Set the LIGHT control switch 11LJ to the ON position.


 4. Procedure
_________ (Ref. Fig. 401/TASK 49-51-54-991-001) Subtask 49-51-54-020-050
 A. Removal of the Bypass Valve
 (1)
 Loosen the pipes (1), (7) and (9) from the bypass valve (3).

 (2)
 Remove the screws (4) and the washers (5) from the bypass valve (3).

 (3)
 Carefully remove the bypass valve (3) from the pipes (1), (7), (9) and from the bracket (6).

 (4)
 Remove and discard the packings (2), (8) and (10).

 (5)
 Put blanking plugs on the disconnected line ends.

 


 Removal/Installation of Buffer-Air Bypass Valve Figure 401/TASK 49-51-54-991-001 
R  EFF :  059-099, 401-499,  49-51-54 Page 403 Aug 01/05
 CES 

 

 TASK 49-51-54-400-001
 Installation of the Buffer-Air Bypass Valve (GTCP 36-300)
 1. Reason for the Job
__________________
 Self Explanatory
 2. Job Set-up Information
______________________
 A. Fixtures, Tools, Test and Support Equipment
 -------------------------------------------------------------------------------REFERENCE QTY DESIGNATION
 -------------------------------------------------------------------------------
No specific access platform 2.5 m (8 ft. 2 in.)
 No specific Torque Wrench : range 0.20 to 3.60 m.daN

 (2.00 to 26.00 lbf.ft)
 B. Expendable Parts
 -------------------------------------------------------------------------------FIG.ITEM |DESIGNATION |IPC-CSN -------------------------------------------------------------------------------
2 packing 49-51-04 02 -110 8 packing 49-51-04 02 -110 10 packing 49-51-04 02 -100
 C. Referenced Information
 -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
24-41-00-861-002 Energize the Aircraft Electrical Circuits from the External Power 24-42-00-862-001 De-energize the Ground Service Network Supplied from the External Power 29-00-00-864-001 Put the Related Hydraulic System in the Depressurized
 Configuration before Maintenance Action 49-00-00-710-004 Operational Test of the APU (4005KM) (GTCP 36-300) 49-00-00-790-004 Air Leak Test with closed APU Doors 52-41-00-010-001 Open the APU Doors for Access 52-41-00-410-001 Close the APU Doors after Access 49-51-54-991-001 Fig. 401


 3. Job Set-up
__________ Subtask 49-51-54-860-051
 A. Aircraft Maintenance Configuration
 (1)
 Make sure that the aircraft electrical circuits are de-energized (Ref. TASK 24-41-00-861-002).

 (2)
 On the panel 25VU, make sure that the APU MASTER SW pushbutton switch is off.

 (3)
 Put a warning notice in the cockpit to tell persons not to start the APU.

 (4)
 Make sure that hydraulic systems are depressurized
 (Ref. TASK 29-00-00-864-001).


 (5)
 Make sure that the access platform is in position below the APU access doors 315AL and 316AR.

 (6)
 Make sure that the APU access doors 315AL, 316AR are open (Ref. TASK 52-41-00-010-001).

 (7)
 Make sure that the LIGHT control switch 11LJ is set to the ON position.


 Subtask 49-51-54-865-051
 B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged
 -------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------121VU APU/APU/CTL 2KD L42 121VU APU/ECB/SPLY 1KD L41
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM 机载辅助动力 AIRBORNE AUXILIARY POWER5(43)