 Aircraft Maintenance Configuration


 (1) De-energize the aircraft electrical circuits
 (Ref. TASK 24-41-00-862-002).

 

 TRANSDUCER - APU INLET PRESSURE - REMOVAL/INSTALLATION
______________________________________________________ TASK 49-51-21-000-001 Removal of the Transducer - APU Inlet Pressure (8048KM) (131-9(A)) WARNING : DO NOT TOUCH THE APU UNTIL IT IS SUFFICIENTLY COOL TO PREVENT BURNS
_______ WHEN YOU DO THE MAINTENANCE TASK(S).
 1.
 Reason for the Job

__________________
 Self Explanatory


 2.
 Job Set-up Information


______________________
 A. Fixtures, Tools, Test and Support Equipment
 -------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
No specific blanking caps
 No specific blanking plug
 No specific circuit breaker(s) safety clip(s)
 No specific access platform 3.5 m (11 ft. 6 in.)

 B. Referenced Information
 -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
24-42-00-861-001  Energize the Ground Service Network from the External Power 29-00-00-864-001 Put the Related Hydraulic System in the Depressurized Configuration before Maintenance Action 52-41-00-010-001 Open the APU Doors for Access

R  EFF : 001-049, 101-105, 107-107, 151-199, 49-51-21Page 401 201-210, Aug 01/05
 CES  3. Job Set-up


__________ Subtask 49-51-21-860-050
 A. Aircraft Maintenance Configuration
 (1)
 Energize the ground service network
 (Ref. TASK 24-42-00-861-001).


 (2)
 On the panel 25VU, make sure that the APU MASTER SW p/bsw is OFF.

 (3)
 Put a warning notice in the cockpit to tell persons not to start the APU.

 (4)
 Make sure that hydraulic systems are depressurized
 (Ref. TASK 29-00-00-864-001).

 

 Subtask 49-51-21-865-050
 B. Open, safety and tag this(these) circuit breaker(s):
 -------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------121VU APU/APU/CTL 2KD L42 121VU APU/ECB/SPLY 1KD L41
 Subtask 49-51-21-010-050
 C. Get Access
 (1)
 Put the access platform in position below the APU access doors 315AL and 316AR.

 (2)
 Open the APU access doors 315AL, 316AR (Ref. TASK 52-41-00-010-001).

 (3)
 Set the LIGHT control SW 11LJ to the ON position.


 4. Procedure
_________ Subtask 49-51-21-020-050
 A. Removal of the Inlet Pressure Transducer
 (1)
 Disconnect the electrical connector (4) from the transducer (3).

 (2)
 Put blanking caps on the disconnected electrical connectors.

 

R  EFF : 001-049, 101-105, 107-107, 151-199, 49-51-21Page 402 201-210, Aug 01/05
 CES


 (3)
 Loosen the nut (1) from the transducer (3).

 (4)
 Remove the transducer (3) from the APU.

 (5)
 Remove and discard the packing (2).

 (6)
 Install a blanking plug in the APU port.

 

R  EFF : 001-049, 101-105, 107-107, 151-199, 49-51-21Page 403 201-210, Aug 01/05
 CES


 TASK 49-51-21-400-001
 Installation of the Transducer - APU Inlet Pressure (8048KM) (131-9(A))

 1. Reason for the Job
__________________
 Self Explanatory
 2. Job Set-up Information
______________________
 A. Fixtures, Tools, Test and Support Equipment
 -------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
No specific  Torque Wrench : range 0.00 to 1.20 m.daN
 (0.00 to 9.00 lbf.ft)
 B. Consumable Materials
 -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
Material No. 03-002  GB DEF-STAN 91-101 LUBRICATING OIL TURBINE ENGINE SYNT BASE (Ref. 20-31-00)
 C. Expendable Parts
 -------------------------------------------------------------------------------FIG.ITEM |DESIGNATION |IPC-CSN -------------------------------------------------------------------------------
 