 A. Fixtures, Tools, Test and Support Equipment
 -------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
No specific blanking caps
 No specific blanking plugs
 No specific circuit breaker(s) safety clip(s)
 No specific access platform 3.5 m (11 ft. 6 in.)

 B. Referenced Information
 -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
24-41-00-861-002 Energize the Aircraft Electrical Circuits from the External Power 29-00-00-864-001 Put the Related Hydraulic System in the Depressurized
 Configuration before Maintenance Action
 52-41-00-010-001 Open the APU Doors for Access
 49-51-51-991-001 Fig. 401

 

 3. Job Set-up
__________ Subtask 49-51-51-860-050
 A. Aircraft Maintenance Configuration
 (1)
 Energize the aircraft electrical circuits
 (Ref. TASK 24-41-00-861-002).


 (2)
 In the cockpit, on the APU panel 25VU, make sure that the FAULT and ON legends in p/bsw MASTER SW are off.

 (3)
 Put a warning notice in the cockpit to tell persons not to start the APU.

 (4)
 Make sure that hydraulic systems are depressurized
 (Ref. TASK 29-00-00-864-001).

 

 Subtask 49-51-51-865-050
 B. Open, safety and tag this(these) circuit breaker(s):
 -------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------49VU AIR BLEED/X FEED/VALVE/BAT 2HV D13 121VU APU/APU/CTL 2KD L42 121VU APU/ECB/SPLY 1KD L41
 Subtask 49-51-51-010-050
 C. Get Access
 (1)
 Put the access platform in position below the APU access doors 315AL and 316AR.

 (2)
 Open the APU access doors 315AL, 316AR (Ref. TASK 52-41-00-010-001).

 (3)
 Set the LIGHT control switch 11LJ to the on position.

 


 4. Procedure
_________
 (Ref. Fig. 401/TASK 49-51-51-991-001) Subtask 49-51-51-020-051
 A. Removal of the BLCV (8050KM)
 (1)
 Disconnect the electrical connection (1) and the electrical connection (2).

 (2)
 Put blanking caps on the disconnected electrical connectors.

 (3)
 Disconnect the V-clamp (4) from the valve (8050KM) (6).

 (4)
 Remove and discard the lockwire from the air pipe (3) connection.

 (5)
 Disconnect the air pipe (3) from the APU bleed load valve (8050KM) (6).

 (6)
 Hold the valve (8050KM) (6) and disconnect the V-clamp (5).

 (7)
 Remove the valve (8050KM) (6).

 (8)
 Put blanking plugs on the disconnected line ends.

 


 Valve - APU Bleed Load.
 Figure 401/TASK 49-51-51-991-001

 CES  TASK 49-51-51-400-001


 Installation of the Bleed Load Control-Valve (8050KM) (GTCP 36-300)
 WARNING : DO NOT TOUCH THE APU UNTIL IT IS SUFFICIENTLY COOL TO PREVENT BURNS
_______ WHEN YOU DO THE MAINTENANCE TASK(S).
 1. Reason for the Job
__________________
 Self Explanatory
 2. Job Set-up Information
______________________
 A. Fixtures, Tools, Test and Support Equipment
 -------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
No specific lockwire - corrosion resistant steel 0.8 mm (0.032
 in) dia No specific access platform 3.5 m (11 ft. 6 in.) No specific Torque Wrench : range 0.00 to 1.20 m.daN
 (0.00 to 9.00 lbf.ft)
 B. Referenced Information
 -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
24-42-00-861-001 Energize the Ground Service Network from the External Power 24-42-00-862-001 De-energize the Ground Service Network Supplied from the External Power 29-00-00-864-001 Put the Related Hydraulic System in the Depressurized Configuration before Maintenance Action 29-14-00-614-002 Pressurization of the Hydraulic Reservoirs through the Ground Connector 31-32-00-860-001 Procedure to Get Access to the SYSTEM REPORT/TEST
 Menu Page 34-10-00-860-002 ADIRS Start Procedure 49-00-00-790-004 Air Leak Test with closed APU Doors 49-00-00-860-003 APU Start by External Power (GTCP 36-300) 49-00-00-860-004 APU Shutdown by External Power (GTCP 36-300) 52-41-00-010-001 Open the APU Doors for Access 52-41-00-410-001 Close the APU Doors after Access
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM 机载辅助动力 AIRBORNE AUXILIARY POWER5(27)