(3)
Remove the warning notice(s).
VALVE - SURGE CONTROL - REMOVAL/INSTALLATION
____________________________________________
TASK 49-51-52-000-003
Removal of the Surge Control Valve (8058KM) (131-9(A))
WARNING : DO NOT TOUCH THE APU UNTIL IT IS SUFFICIENTLY COOL TO PREVENT BURNS
_______ WHEN YOU DO THE MAINTENANCE TASK(S).
1. Reason for the Job
__________________
Self Explanatory
2. Job Set-up Information
______________________
A. Fixtures, Tools, Test and Support Equipment
-------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
No specific blanking caps No specific blanking plugs No specific circuit breaker(s) safety clip(s) No specific gaskets No specific O-rings No specific access platform 3.5 m (11 ft. 6 in.)
B. Referenced Information
-------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
24-42-00-861-001 Energize the Ground Service Network from the External Power 29-00-00-864-001 Put the Related Hydraulic System in the Depressurized
Configuration before Maintenance Action 52-41-00-010-001 Open the APU Doors for Access 49-51-52-991-005 Fig. 401
R EFF : 001-049, 101-105, 107-107, 151-199, 49-51-52Page 401 201-210, Config-2 Aug 01/05
CES 3. Job Set-up
__________ Subtask 49-51-52-860-055
A. Aircraft Maintenance Configuration
(1)
Energize the ground service network
(Ref. TASK 24-42-00-861-001).
(2)
On the panel 25VU, make sure that the APU MASTER SW p/bsw is OFF.
(3)
Put a warning notice in the cockpit to tell persons not to start the APU.
(4)
Make sure that hydraulic systems are depressurized
(Ref. TASK 29-00-00-864-001).
Subtask 49-51-52-865-057
B. Open, safety and tag this(these) circuit breaker(s):
-------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------121VU APU/APU/CTL 2KD L42 121VU APU/ECB/SPLY 1KD L41
Subtask 49-51-52-010-054
C. Get Access
(1)
Put the access platform in position below the APU access doors 315AL and 316AR.
(2)
Open the APU access doors 315AL, 316AR (Ref. TASK 52-41-00-010-001).
(3)
Set the LIGHT control SW 11LJ to the ON position.
R EFF : 001-049, 101-105, 107-107, 151-199, 49-51-52Page 402 201-210, Config-2 Aug 01/05
CES 4. Procedure
_________
(Ref. Fig. 401/TASK 49-51-52-991-005) Subtask 49-51-52-020-054
A. Removal of the Surge Control Valve.
(1)
Make a mark on the valve and duct for correct alignment during installation.
(2)
Disconnect the electrical connector (13) from the valve (11).
(3)
Put blanking caps on the disconnected electrical connectors.
(4)
Loosen the captive bolts (3) and remove the pipe clamp (2).
(5)
Remove the pipes (4), (6) and (7) from the valve (11).
(6)
Remove the clamp (9) from the valve.
(7)
Hold the valve (11) and remove the clamp (12).
(8)
Remove the surge control valve (11) from the APU.
(9)
Remove and discard the gaskets (10).
(10)
Remove and discard O-rings (1), (5) and (8).
(11)
Put blanking plugs on the disconnected line ends.
R EFF : 001-049, 101-105, 107-107, 151-199, 49-51-52Page 403 201-210, Config-2 Aug 01/05
CES
Surge Control Valve
Figure 401/TASK 49-51-52-991-005
CES
TASK 49-51-52-400-003
Installation of the Surge Control Valve (8058KM) (131-9(A))
1. Reason for the Job
__________________
Self Explanatory
2. Job Set-up Information
______________________
A. Fixtures, Tools, Test and Support Equipment
-------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
No specific Torque Wrench : range 0.00 to 1.20 m.daN