• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-03-26 14:43来源:蓝天飞行翻译 作者:admin
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

 -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
24-42-00-861-001 Energize the Ground Service Network from the External Power 29-00-00-864-001 Put the Related Hydraulic System in the Depressurized
 Configuration before Maintenance Action 52-41-00-010-001 Open the APU Doors for Access 49-51-51-991-004 Fig. 401

R  EFF : 001-049, 101-105, 107-107, 151-199, 49-51-51Page 401 201-210, Config-2 Aug 01/05
 CES  3. Job Set-up


__________ Subtask 49-51-51-860-053
 A. Aircraft Maintenance Configuration
 (1)
 Energize the ground service network
 (Ref. TASK 24-42-00-861-001).


 (2)
 On the panel 25VU, make sure that the APU MASTER SW p/bsw is OFF.

 (3)
 Put a warning notice in the cockpit to tell persons not to start the APU.

 (4)
 Make sure that hydraulic systems are depressurized
 (Ref. TASK 29-00-00-864-001).

 

 Subtask 49-51-51-865-059
 B. Open, safety and tag this(these) circuit breaker(s):
 -------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------49VU AIR BLEED/X FEED/VALVE/BAT 2HV D13 121VU APU/APU/CTL 2KD L42 121VU APU/ECB/SPLY 1KD L41
 Subtask 49-51-51-010-055
 C. Get Access
 (1)
 Put the access platform in position below the APU access doors 315AL and 316AR.

 (2)
 Open the APU access doors 315AL, 316AR (Ref. TASK 52-41-00-010-001).

 (3)
 Set the LIGHT control SW 11LJ to the ON position.

 

R  EFF : 001-049, 101-105, 107-107, 151-199, 49-51-51Page 402 201-210, Config-2 Aug 01/05
 CES  CES


 4. Procedure_________
 (Ref. Fig. 401/TASK 49-51-51-991-004)
 Subtask 49-51-51-020-054
 A. Removal of the Load Control Valve 
R  (1) Disconnect the electrical connector (3).
 (2) Put blanking caps on the disconnected electrical connectors. 
R  (3) Loosen the clamp (2) from the duct (1) and the valve (4). 
R  (4) Hold the valve (4) and remove the clamp (6). 
R  (5) Remove the valve (4). 
R  (6) Remove and discard the seal (5).
 (7) Install blanking covers on the ducts. 

 

R  Load Control Valve Figure 401/TASK 49-51-51-991-004 
R  EFF : 001-049, 101-105, 107-107, 151-199, 201-210,  Page 40449-51-51Config-2 Aug 01/05
 CES 

 

 TASK 49-51-51-400-004
 Installation of the Load Control Valve (8050KM) (131-9(A))
 1. Reason for the Job
__________________
 Self Explanatory
 2. Job Set-up Information
______________________
 A. Fixtures, Tools, Test and Support Equipment
 -------------------------------------------------------------------------------
REFERENCE  QTY DESIGNATION
 -------------------------------------------------------------------------------
No specific  Torque Wrench : range 0.00 to 1.20 m.daN
 (0.00 to 9.00 lbf.ft)
 B. Expendable Parts
 -------------------------------------------------------------------------------
FIG.ITEM |DESIGNATION  |IPC-CSN
 -------------------------------------------------------------------------------
R 5 seal 49-51-09 01 -090 R
 C. Referenced Information
 -------------------------------------------------------------------------------
REFERENCE  DESIGNATION
 -------------------------------------------------------------------------------
24-42-00-861-001 Energize the Ground Service Network from the External Power 24-42-00-862-001 De-energize the Ground Service Network Supplied from the External Power 29-00-00-864-001 Put the Related Hydraulic System in the Depressurized Configuration before Maintenance Action 29-14-00-614-002 Pressurization of the Hydraulic Reservoirs through the Ground Connector 31-32-00-860-001 Procedure to Get Access to the SYSTEM REPORT/TEST
 Menu Page
 49-00-00-790-006 Air Leak Test with closed APU Doors
 49-00-00-860-008 APU Start by External Power (131-9(A))
 49-00-00-860-009 APU Shutdown by External Power (131-9(A))


R  EFF : 001-049, 101-105, 107-107, 151-199, 49-51-51Page 405 201-210, Config-2 Aug 01/05
 CES  -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM 机载辅助动力 AIRBORNE AUXILIARY POWER5(30)