• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-04-10 09:38来源:蓝天飞行翻译 作者:航空
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 26-13-00
 ALL  ú ú 09 Page 503 ú Oct 15/98
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400 MAINTENANCE MANUAL
 S 865-062
 (6) Remove electrical power if it is not necessary (AMM 24-22-00/201).
 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 26-13-00
 ALL  ú ú 06 Page 504 ú Jun 10/96
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400 MAINTENANCE MANUAL
 LAVATORY SMOKE DETECTOR - REMOVAL/INSTALLATION
______________________________________________
 1.  General_______
 A.  Two tasks are in this procedure. The first is the removal of the lavatory smoke detector and the second is the installation of the lavatory smoke detector.
 B.  A smoke detector is installed in the ceiling of each lavatory. The removal and installation procedures are the same for each smoke detector.
 TASK 26-13-01-004-001
 2.  Remove the Smoke Detector (Fig. 401)____________________________________
 A.  References
 (1)  
WDM 26-13-11 through 26-13-14

 (2)  
SSM 26-13-01 through 26-13-04


 B.  Access
 (1)  Location Zone
 211 to 274 Upper Half Fuselage

 C.  Remove the Lavatory Smoke Detector
 S 864-002
 (1)  Open these circuit breakers and attach DO-NOT-CLOSE tags:
 (a)  P180 DC Power Distribution Panel
 1) 180F18 LAV SMOKE DET-1
 2) 180F03 LAV SMOKE DET-2

 S 034-003
 (2)  Loosen the two screws on the smoke detector faceplate.
 NOTE:____The screws are attached to the faceplate. Do not remove them.
 S 014-004
 (3)  Remove the faceplate from the smoke detector case.
 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 26-13-01
 ALL  ú ú 01 Page 401 ú Jun 10/91
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A 747-400 MAINTENANCE MANUAL
CEILING
BRACKET


FACE (2 LOCATIONS) PLATE
____ THE SCREWS ATTACHED TO THE FACE PLATE
NOTE:
CANNOT BE REMOVED.
Lavatory Smoke Detector Installation
Figure 401

EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 26-13-01
 ALL  ú ú 02 Page 402 ú Jun 10/91
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A 747-400 MAINTENANCE MANUAL
 (4)  S 034-005Remove the two mounting screws which attach the smoke detector case to the ceiling bracket.
 (5)  S 024-006Remove the smoke detector and the ceiling bracket from the ceiling.
 (6)  S 034-007Disconnect the electrical connector.
 (7)  S 034-008Hold the smoke detector case and disconnect the lanyard from the rear of the smoke detector case.

 TASK 26-13-01-404-009
 3. Install the Smoke Detector (Fig. 401)
_____________________________________
 A. References
 (1)  
AMM 26-13-00/501 Lavatory Smoke Detection System

 (2)  
WDM 26-13-11 through 26-13-14

 (3)  
SSM 26-13-01 through 26-13-04


 B. Access
 (1)  Location Zone
 211 to 274 Upper Half Fuselage

 C. Procedure
 S 434-010
 (1)  
Attach the lanyard from the ceiling bracket to the smoke detector case.

 S 434-011

 (2)  
Hold the ceiling bracket on top of the smoke detector and loosely tighten the two mounting screws on the smoke detector case.

 S 434-012

 (3)  
Connect the airplane wiring connector to the electrical connector on the smoke detector or case.
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:747-400 AMM 飞机维护手册 防火 FIRE PROTECTION 1(47)