• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-03-27 08:44来源:蓝天飞行翻译 作者:admin
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

R R  25-13-41-400-001 25-13-41-400-002  Installation of the Ceiling Panels Installation of the Sidewall Panels
 25-80-00-000-001  Removal of the Insulation Blankets
 25-80-00-400-001  Installation of the Insulation Blankets
R R  52-10-00-010-001 52-10-00-410-001 52-41-00-010-002 52-41-00-410-002  Opening of the Passenger/Crew DoorClosing of the Passenger/Crew Door Open the Avionics Compartment Doors for Access Close the Avionics Compartment Doors after Access

 

 -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
R R  SRM 511100 P.Block 001 SRM 512200 P.Block 001 53-11-00-991-058 53-11-00-991-059  (for corrective action)(for corrective action) Fig. 649 Fig. 650
 3. Job Set-up__________
 Subtask 53-11-00-010-081
 A. Get Access 

R  (Ref. Fig. 649/TASK 53-11-00-991-058) 
R  (1) Put an access platform in position at the zone 811. 
R R  (2) Open the avionics-compartment door 811 (Ref. TASK 52-41-00-010-002). 
R  (3) Open the forward passenger/crew Door 831 (841) (Ref. TASK 52-10-00-010-001). 
R R R  (4) Remove the linings around the cockpit windows: 211GW, 211DW, 211PW, 211NW, 211LW, 211MW, 211KC, 211AC, 211LC, 211MC, 212LC, 212AC, 212KC, 212NW, 212PW, 212DW, 212KW, 212GW, (Ref. TASK 25-13-41-000-001), (Ref. TASK 25-13-41-000-002). 
R  (5) Remove the insulation blankets (Ref. TASK 25-80-00-000-001). 
R  (6) Move the electrical devices.
 Subtask 53-11-00-110-095
 B. Cleaning of the Structure
 WARNING : USE SOLVENTS/CLEANING AGENTS, SEALANTS AND OTHER SPECIAL_______ MATERIALS ONLY WITH A GOOD SUPPLY OF AIR. OBEY THE MANUFACTURERS INSTRUCTIONS. PUT ON PROTECTIVE CLOTHING. DO NOT GET THEM IN YOUR MOUTH. DO NOT SMOKE. DO NOT BREATHE THE GAS. THESE MATERIALS ARE POISONOUS, FLAMMABLE AND SKIN IRRITANT. GET MEDICAL HELP IF YOUR SKIN OR EYES BECOME IRRITATED.

 CES


R R  Cockpit Lining Panels Figure 649/TASK 53-11-00-991-058
 EFF :  ALL  53-11-00 Page A693 Aug 01/03
 CES 

 

R R R  (1) Clean the inspection area with CLEANING AGENTS (Material No. 11-004) and a lint-free cotton cloth MISCELLANEOUS (Material No. 19-003), if necessary.
 4. Procedure_________
 Subtask 53-11-00-220-061
R  A. Inspection (Ref. Fig. 650/TASK 53-11-00-991-059) 
R R  (1) Do a detailed inspection of the structure of the cockpit window frames and closing panels (up to FR12).
 (2) Make sure that there is no:
R R R  (a) Corrosion damage: - If you find corrosion damage, refer to the Structural Repair Manual (Ref. SRM 512200 P.Block 001) for types of corrosion, inspection, removal and corrosion protection.
R R R  (b) Other damage (cracks, scratches, stress, marks, dents, bumps ...): - If you find other damage, refer to the Structural Repair Manual (Ref. SRM 511100 P.Block 001) for damage classification and corrective action .
 5. Close-up________
 Subtask 53-11-00-410-081
 A. Close Access 
R  (1) Put the electrical devices back in position.
 (2) Install the insulation blankets (Ref. TASK 25-80-00-400-001).
R R R  (3) Install the lining panels around the cockpit windows 211GW, 211DW, 211PW, 211NW, 211LW, 211MW, 211KC, 211AC, 211LC, 211MC, 212LC, 212AC, 212KC, 212NW, 212PW, 212DW, 212KW, 212GW, (Ref. TASK 25-13-41-400-001), (Ref. TASK 25-13-41-400-002).
 (4) Make sure that the work area is clean and clear of tool(s) and other items. 
R  (5) Close the forward passenger/crew Door 831 (841) (Ref. TASK 52-10-00-410-001).

 CES


R  Cockpit Window Frames Figure 650/TASK 53-11-00-991-059
 EFF :  ALL  53-11-00 Page A695 Aug 01/03
 CES 

 

R (6) Close the avionics-compartment door 811 (Ref. TASK 52-41-00-410-002). R (7) Remove the access platform(s).


 TASK 53-11-00-210-048 
R  Detailed Inspection of Cockpit Floor Structure, between FR 1 and FR 12
 1. Reason for the Job__________________
 Refer to the MPD TASK: 531188-01
 2. Job Set-up Information______________________
 A. Fixtures, Tools, Test and Support Equipment
 -------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
R  No specific  access platform 3.5 m (11 ft. 6 in.)
 B. Consumable Materials
 -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM FUSELAGE 机身1(76)