R Internal Structure below the Forward Passenger/Crew Doors and the Cabin Floor R Level R Figure 634/TASK 53-11-00-991-045
EFF : ALL 53-11-00Page A631 Aug 01/03
CES 5. Close-up
________ Subtask 53-11-00-410-093
A. Close Access
(1)
Install the insulation (Ref. TASK 25-80-00-400-001).
(2)
Make sure that the work area is clean and clear of tool(s) and other items.
(3)
Close the lateral avionics-compartment doors 812 (824) (Ref. TASK 52-41-00-410-002).
(4)
Remove the access platform(s).
EFF : ALL 53-11-00Page A632
Aug 01/03
R
CES
TASK 53-11-00-210-036
R Detailed Inspection of Fuselage Internal Structure, below Batteries, between FR R 10 and FR 16, RH
1. Reason for the Job
__________________
Refer to the MPD TASK: 531167-01
2. Job Set-up Information
______________________
A. Fixtures, Tools, Test and Support Equipment
-------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
No specific access platform 1.80 m (5 ft. 11 in.)
B. Consumable Materials
-------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
No specific masking paper
Material No. 08-074
MASKING TAPE (Ref. 20-31-00)
Material No. 11-004 USA MIL-T-81533
1.1.1TRICHLOROETHANE (METHYL CHLOROFORM)
(Ref. 20-31-00)
Material No. 15-005 AIB TN 10138 TYPE I GRADE 2 CORROSION PREVENTIVE TEMPORARY PROTECTIVE COMPOUND (Ref. 20-31-00)
Material No. 15-006 AIB TN 10138 TYPE I GRADE 3 CORROSION PREVENTIVE TEMPORARY PROTECTIVE COMPOUND (Ref. 20-31-00)
Material No. 19-003 USA AMS 3819
LINT-FREE COTTON CLOTH (Ref. 20-31-00)
C. Referenced Information
-------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
R R R 25-80-00-000-001 25-80-00-400-001 52-41-00-010-002 52-41-00-410-002 SRM 511100 P.Block 001 SRM 512200 P.Block 001 53-11-00-991-048 Removal of the Insulation BlanketsInstallation of the Insulation Blankets Open the Avionics Compartment Doors for Access Close the Avionics Compartment Doors after Access(for corrective action)(for corrective action) Fig. 635
3. Job Set-up__________
Subtask 53-11-00-010-076
A. Get Access
(1) Put an access platform at the zone 126.
R (2) Open the avionics compartment door 822 (Ref. TASK 52-41-00-010-002).
(3) Remove the insulation blankets (Ref. TASK 25-80-00-000-001).
Subtask 53-11-00-110-084
B. Cleaning of the Structure
WARNING : USE SOLVENTS/CLEANING AGENTS, SEALANTS AND OTHER SPECIAL_______ MATERIALS ONLY WITH A GOOD SUPPLY OF AIR. OBEY THE MANUFACTURERS INSTRUCTIONS. PUT ON PROTECTIVE CLOTHING. DO NOT GET THEM IN YOUR MOUTH. DO NOT SMOKE. DO NOT BREATHE THE GAS. THESE MATERIALS ARE POISONOUS, FLAMMABLE AND SKIN IRRITANT. GET MEDICAL HELP IF YOUR SKIN OR EYES BECOME IRRITATED.
R R (1) Clean the inspection area with CLEANING AGENTS (Material No. 11-004) and a lint-free cotton cloth MISCELLANEOUS (Material No. 19-003), if necessary.
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM FUSELAGE 机身1(64)