EFF : ALL
53-11-00Page 698
Aug 01/04
5. Close-up
________
Subtask 53-11-00-914-051
A. Preparation of the Bolts for Installation
(1) Make sure that the parts retained from the removed component are clean and in the correct condition.
(2) Apply a bead of SEALANTS (Material No. 09-005) around the screws (1) and the nuts (2).
Subtask 53-11-00-420-059
B. Installation of the Components
R (1) Install the FWD lavatories (Ref. TASK 25-41-41-400-001), if removed.
R R R (2) Install the FWD galleys (Ref. TASK 25-31-41-400-001), (Ref. TASK 25-31-41-400-002), (Ref. TASK 25-31-41-400-008), (Ref. TASK 25-31-41-400-013), if removed.
R R (3) Install the threaded pins (HI-LITE) (1) and the nuts (2). Refer to the Structural Repair Manual (Ref. SRM 514211, P.BLOCK-001). (Ref. Fig. 625/TASK 53-11-00-991-043)
R (4) Install the insulation blankets at FR16 (Ref. TASK 25-80-00-400-001).
Subtask 53-11-00-410-065
C. Close Access
R R (1) Install the lining panels at FR16: - For the left side: 221AW, 221BW, 221CW, 221EW, 221FW, 221GW (Ref. TASK 25-23-45-400-006). - For the right side: 222AW, 222BW, 222CW, 222DW, 222EW, 222FW, 222GW (Ref. TASK 25-23-45-400-007).
(2) Make sure that the work area is clean and clear of tool(s) and other items.
R (3) Close the forward passenger/crew door 831 (841) (Ref. TASK 52-10-00-410-001).
(4) Remove the access platform(s).
EFF : ALL
53-11-00Page 699
Aug 01/04
TASK 53-11-00-210-027
R Special Detailed Inspection of Door FR 20, at Double Joggle Area in Outer R Flange of FR, at Door Stops Number 1 and 7 Location, LH/RH
1. Reason for the Job
__________________
Refer to the MPD TASK: 531155-02
2. Job Set-up Information
______________________
A. Fixtures, Tools, Test and Support Equipment
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
No specific access platform 3.50 m (11 ft. 6 in.)
B. Consumable Materials
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
Material No. 09-005 USA MIL-S-81733 CLASS C CORROSION INHIBITIVE INTERFAY SEALANT (Ref. 20-31-00)
Material No. 11-004 USA MIL-T-81533
1.1.1TRICHLOROETHANE (METHYL CHLOROFORM)
(Ref. 20-31-00)
Material No. 19-003 USA AMS 3819
LINT-FREE COTTON CLOTH (Ref. 20-31-00)
C. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
25-23-45-000-002 Removal of the Door Frame Linings at the Right FWD Passenger/Crew Door 25-23-45-000-005 Removal of the Door Frame Linings at the Left FWD Passenger/Crew Door 25-23-45-400-006 Installation of the Door Frame Linings at the Left FWD Passenger/Crew Door 25-23-45-400-007 Installation of the Door Frame Linings at the Right FWD Passenger/Crew Door
-------------------------------------------------------------------------------
REFERENCE DESIGNATION -------------------------------------------------------------------------------
R 25-80-00-000-001 25-80-00-400-001 52-10-00-010-001 52-10-00-410-001 NTM 531155,P.Block-601 SRM 514211,P.Block 001 SRM 511100,P.Block 001 SRM 512200,P.Block 001 53-11-00-991-044 53-11-00-991-071 Removal of the Insulation BlanketsInstallation of the Insulation BlanketsOpening of the Passenger/Crew DoorClosing of the Passenger/Crew Door(for corrective action)(for corrective action)Fig. 627Fig. 628
3. Job Set-up__________
Subtask 53-11-00-010-067
A. Get Access
R (1) Put an access platform in position at the zone 831 (841).
R R (2) Open the forward passenger/crew door 831 (841), and lock it in the open position (Ref. TASK 52-10-00-010-001).
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM FUSELAGE 机身1(57)