EFF : ALL
53-20-00Page 20
MAIN STRUCTURE - INSPECTION/CHECK_________________________________
R **ON A/C 301-399,
R TASK 53-21-00-200-018
R Detailed Inspection of Internal Structure around Forward Emergency Exit
R Cutouts, between FR 35 and FR 35.3 from Stringer 23 LH to Stringer 7 LH...
R 1. Reason for the Job__________________
R Refer to the MPD TASK: 532113-01
R 2. Job Set-up Information______________________
R A. Fixtures, Tools, Test and Support Equipment
R -------------------------------------------------------------------------------
R REFERENCE QTY DESIGNATION
R -------------------------------------------------------------------------------
R No specific masking paper
R No specific masking tape
R No specific access platform 3.5 m (11 ft. 6 in.)
R B. Consumable Materials
R -------------------------------------------------------------------------------
R REFERENCE DESIGNATION
R -------------------------------------------------------------------------------
R No specific masking paper
R Material No. 08-074
R MASKING TAPE (Ref. 20-31-00)
R Material No. 11-004 USA MIL-T-81533
R 1.1.1TRICHLOROETHANE (METHYL CHLOROFORM)
R (Ref. 20-31-00)
R Material No. 15-005 AIB TN 10138 TYPE I GRADE 2
R CORROSION PREVENTIVE TEMPORARY PROTECTIVE COMPOUND
R (Ref. 20-31-00)
R Material No. 15-006 AIB TN 10138 TYPE I GRADE 3
R CORROSION PREVENTIVE TEMPORARY PROTECTIVE COMPOUND
R (Ref. 20-31-00)
R Material No. 19-003 USA AMS 3819
R LINT-FREE COTTON CLOTH (Ref. 20-31-00)
EFF : ALL
53-21-00Page 601
May 01/04
R C. Referenced Information
R -------------------------------------------------------------------------------R REFERENCE DESIGNATION R -------------------------------------------------------------------------------
R 25-23-41-000-001 R 25-23-41-400-001 R 25-23-43-000-001 R 25-23-43-400-001 R 25-23-47-000-004 R R 25-23-47-000-009 R R 25-23-47-400-004 R R 25-23-47-400-009 R R 25-23-48-000-001 R 25-23-48-400-001 R 25-24-41-000-001 R 25-80-00-000-001 R 25-80-00-400-001 R 52-22-00-010-001 R R 52-22-00-410-001 R R SRM 511100 P.Block 001 R SRM 512200 P.Block 001 R 53-21-00-991-020
R 3. Job Set-up__________
R Subtask 53-21-00-010-059
R A. Get Access Removal of the Ceiling Panels Installation of the Ceiling Panels Removal of the Upper Sidewall Panel(s) Installation of the Upper Sidewall Panel(s) Removal of the Door Frame Linings of the LH FWD Emergency Exit Door, zone 231 Removal of the Door Frame Linings of the RH FWD Emergency Exit Door, zone 232 Installation of the Door Frame Linings of the LH FWD Emergency Exit Door, zone 231 Installation of the Door Frame Linings of the RH FWD Emergency Exit Door, zone 232 Removal of the Cove Light Panels Installation of the Cove Light Panels Removal of the Overhead Stowage Compartments Removal of the Insulation Blankets Installation of the Insulation Blankets Opening of the Emergency Exit Doors from the Passenger Compartment Closing of the Emergency Exit Doors from the Passenger Compartment (for corrective action) (for corrective action) Fig. 601
R (1) Put an access platform in position at zone 833 (843).
R (2) Open the forward emergency exit door 833 (843) (Ref. TASK 52-22-00-R 010-001).
R (3) Remove the door frame linings (Ref. TASK 25-23-47-000-004) (Ref. TASK R 25-23-47-000-009).
R (4) Remove the sidewall panels: 231AX, 232AX, 231PX, 232PX, 231BX, 232BX, R 231QX, 232QX (Ref. TASK 25-23-43-000-001).
R EFF : 301-399, 53-21-00Page 602 May 01/04
CES CES
R (5) Remove the cove light panels: 231CX, 231FX, 231RX, 232CX, 232FX,
R 232RX (Ref. TASK 25-23-48-000-001).
R (6) Remove the ceiling panels (Ref. TASK 25-23-41-000-001).
R (7) Remove the overhead stowage compartments, if installed (Ref. TASK 25-
R 24-41-000-001).
R (8) Remove the insulation blankets (Ref. TASK 25-80-00-000-001).
R Subtask 53-21-00-110-050
R B. Cleaning of the Structure
R WARNING : USE SOLVENTS/CLEANING AGENTS, SEALANTS AND OTHER SPECIAL_______
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM FUSELAGE 机身1(132)