EFF : ALL 
53-15-11Page 458
 RADOME (1560WM) - ADJUSTMENT/TEST
_________________________________
 TASK 53-15-11-700-002 Tap Test of the Radome
 1.
 Reason for the Job
__________________
 Self explanatory
 2.
 Job Set-up Information
______________________
 A. Fixtures, Tools, Test and Support Equipment
 -------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
No specific chalk No specific access platform 3.5 m (11 ft. 6 in.) 98A57103013000 1 TAP TEST TOOL
 B. Referenced Information
 -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
53-15-11-010-001 Opening of the Radome 110AL 53-15-11-410-001 Closing of the Radome 110AL 53-15-11-991-017 Fig. 501
 3. Job Set-up
__________ Subtask 53-15-11-941-060
 A. Get Access
 (1)
 Put an access platform in position at the zone 110.
 (2)
 Open the radome (Ref. TASK 53-15-11-010-001), if necessary.
 EFF : ALL 
53-15-11Page 501
 4. Procedure
_________ Subtask 53-15-11-750-050
 A. Tap Test CAUTION : TAP THE SURFACE OF THE COMPONENT LIGHTLY. IF YOU APPLY TOO MUCH
_______
 FORCE, YOU CAN CAUSE DAMAGE TO THE RADOME.
 (1)
 Tap the full surface of the inspection area with a TAP TEST TOOL (98A57103013000) in a grid pattern with a distance of approximately 10 mm (0.3937 in.) between the grids (Ref. Fig. 501/TASK 53-15-11-991-017)
 (a)
 If there is a clear resonant sound, the area has no debonding.
 (b)
 If there is a dull sound, the area has delamination/debonding.
 (2)
 Identify the damage area on the skin with chalk.
 5. Close-up
________ Subtask 53-15-11-860-050
 A. Close Access
 (1)
 Make sure that the work area is clean and clear of tool(s) and other items.
 (2)
 Close the radome (Ref. TASK 53-15-11-410-001), if necessary.
 (3)
 Remove the ground support and maintenance equipment, the special and standard tools and all other items.
 (4)
 Remove the access platform(s).
 EFF : ALL 
53-15-11Page 502
 Radome - Tap Test Tool and Grid Pattern 
 Figure 501/TASK 53-15-11-991-017 
 EFF :  ALL  53-15-11 Page 503  
Aug 01/03 
 CES 
 RADOME (1560WM) - INSPECTION/CHECK__________________________________ 
 TASK 53-15-11-200-001  
R  Detailed Inspection of the Radome 
 WARNING : MAKE SURE THAT THE CIRCUIT BREAKERS RELATED TO THE WEATHER RADAR ARE_______ OPENED, SAFETIED AND TAGGED. 
 1. Reason for the Job__________________ 
 Self Explanatory 
 2. Job Set-up Information______________________ 
 A. Fixtures, Tools, Test and Support Equipment 
 -------------------------------------------------------------------------------REFERENCE QTY DESIGNATION ------------------------------------------------------------------------------- 
No specific No specific No specific  circuit breaker(s) safety clip(s)warning noticesaccess platform 3.50 m (11 ft. 6 in.)  
R  B. Consumable Materials  
R R R  -------------------------------------------------------------------------------REFERENCE DESIGNATION ------------------------------------------------------------------------------- 
R R R R R R R R  Material No. 11-001A Material No. 11-001Q Material No. 19-003  USA MIL-C-87936 TYPE I EXT.AIRCRAFT CLEANER GENERAL PURPOSE CLEANING (Ref. 20-31-00) USA AMS 1526,1527 CLEANER,EXTERIOR AIRCRAFT-GENERAL PURPOSE (Ref. 20-31-00) USA AMS 3819 LINT-FREE COTTON CLOTH (Ref. 20-31-00)
 EFF : ALL 
53-15-11Page 601 
Aug 01/03
 C. Referenced Information
 -------------------------------------------------------------------------------
REFERENCE  DESIGNATION
 -------------------------------------------------------------------------------
24-42-00-861-001 Energize the Ground Service Network from the External Power 24-42-00-862-001 De-energize the Ground Service Network Supplied from
 the External Power 52-41-00-010-002 Open the Avionics Compartment Doors for Access 52-41-00-410-002 Close the Avionics Compartment Doors after Access 53-15-11-000-001 Removal of the Radome 53-15-11-010-001 Opening of the Radome 110AL 53-15-11-300-001 Temporary Repair of the Radome 53-15-11-400-001 Installation of the Radome 53-15-11-410-001 Closing of the Radome 110AL 53-15-11-700-002 Tap Test of the Radome 
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM FUSELAGE 机身1(111)