53-15-11Page 458
RADOME (1560WM) - ADJUSTMENT/TEST
_________________________________
TASK 53-15-11-700-002 Tap Test of the Radome
1.
Reason for the Job
__________________
Self explanatory
2.
Job Set-up Information
______________________
A. Fixtures, Tools, Test and Support Equipment
-------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
No specific chalk No specific access platform 3.5 m (11 ft. 6 in.) 98A57103013000 1 TAP TEST TOOL
B. Referenced Information
-------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
53-15-11-010-001 Opening of the Radome 110AL 53-15-11-410-001 Closing of the Radome 110AL 53-15-11-991-017 Fig. 501
3. Job Set-up
__________ Subtask 53-15-11-941-060
A. Get Access
(1)
Put an access platform in position at the zone 110.
(2)
Open the radome (Ref. TASK 53-15-11-010-001), if necessary.
EFF : ALL
53-15-11Page 501
4. Procedure
_________ Subtask 53-15-11-750-050
A. Tap Test CAUTION : TAP THE SURFACE OF THE COMPONENT LIGHTLY. IF YOU APPLY TOO MUCH
_______
FORCE, YOU CAN CAUSE DAMAGE TO THE RADOME.
(1)
Tap the full surface of the inspection area with a TAP TEST TOOL (98A57103013000) in a grid pattern with a distance of approximately 10 mm (0.3937 in.) between the grids (Ref. Fig. 501/TASK 53-15-11-991-017)
(a)
If there is a clear resonant sound, the area has no debonding.
(b)
If there is a dull sound, the area has delamination/debonding.
(2)
Identify the damage area on the skin with chalk.
5. Close-up
________ Subtask 53-15-11-860-050
A. Close Access
(1)
Make sure that the work area is clean and clear of tool(s) and other items.
(2)
Close the radome (Ref. TASK 53-15-11-410-001), if necessary.
(3)
Remove the ground support and maintenance equipment, the special and standard tools and all other items.
(4)
Remove the access platform(s).
EFF : ALL
53-15-11Page 502
Radome - Tap Test Tool and Grid Pattern
Figure 501/TASK 53-15-11-991-017
EFF : ALL 53-15-11 Page 503
Aug 01/03
CES
RADOME (1560WM) - INSPECTION/CHECK__________________________________
TASK 53-15-11-200-001
R Detailed Inspection of the Radome
WARNING : MAKE SURE THAT THE CIRCUIT BREAKERS RELATED TO THE WEATHER RADAR ARE_______ OPENED, SAFETIED AND TAGGED.
1. Reason for the Job__________________
Self Explanatory
2. Job Set-up Information______________________
A. Fixtures, Tools, Test and Support Equipment
-------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
No specific No specific No specific circuit breaker(s) safety clip(s)warning noticesaccess platform 3.50 m (11 ft. 6 in.)
R B. Consumable Materials
R R R -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
R R R R R R R R Material No. 11-001A Material No. 11-001Q Material No. 19-003 USA MIL-C-87936 TYPE I EXT.AIRCRAFT CLEANER GENERAL PURPOSE CLEANING (Ref. 20-31-00) USA AMS 1526,1527 CLEANER,EXTERIOR AIRCRAFT-GENERAL PURPOSE (Ref. 20-31-00) USA AMS 3819 LINT-FREE COTTON CLOTH (Ref. 20-31-00)
EFF : ALL
53-15-11Page 601
Aug 01/03
C. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
24-42-00-861-001 Energize the Ground Service Network from the External Power 24-42-00-862-001 De-energize the Ground Service Network Supplied from
the External Power 52-41-00-010-002 Open the Avionics Compartment Doors for Access 52-41-00-410-002 Close the Avionics Compartment Doors after Access 53-15-11-000-001 Removal of the Radome 53-15-11-010-001 Opening of the Radome 110AL 53-15-11-300-001 Temporary Repair of the Radome 53-15-11-400-001 Installation of the Radome 53-15-11-410-001 Closing of the Radome 110AL 53-15-11-700-002 Tap Test of the Radome
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM FUSELAGE 机身1(111)