PANELS - FWD CARGO COMPARTMENT FLOOR 53-22-14
REMOVAL/INSTALLATION 401 ALL
Removal of the FWD 401 ALL
Cargo-Compartment Floor-Panels
53-CONTENTS Page 12 Aug 01/05 R CES
CHAPTER 53
__________
FUSELAGE
TABLE OF CONTENTS
_________________
SUBJECT_______ CH/SE/SU _ PAGE EFFECTIVITY
________ C ____ ___________ Installation of the FWD 409 ALL Cargo-Compartment Floor-Panels Removal of the Maintenance Panels 414 301-399, at Frame 35.5 Installation of the Maintenance 417 301-399, Panels at Frame 35.5
FAIRINGS - WING TO FUSELAGE 53-25-11
REMOVAL/INSTALLATION 401 ALL Removal of the Wing-to-Fuselage 401 ALL Fairings (191AT, 191AB, 192AT, 192AB) Installation of the 410 ALL Wing-to-Fuselage Fairings (191AT, 191AB, 192AT, 192AB)
SCUFF PLATES - EMERGENCY EXIT DOOR 53-25-41
REMOVAL/INSTALLATION 401 301-399, Removal of the FWD Emergency-Exit 401 301-399, Scuff-Plate Installation of the FWD 404 301-399, Emergency-Exit Scuff-Plate
MISCELLANEOUS (EG : DRAINS) 53-29-00
DESCRIPTION AND OPERATION 1 ALL General 1 ALL Description 1 ALL
DRAINS - FORWARD FUSELAGE 53-29-41
REMOVAL/INSTALLATION 401 ALL Removal of the Drain Valves 401 ALL Installation of the Drain Valves 406 ALL
CENTER FUSELAGE 53-30-00
_______________
DESCRIPTION AND OPERATION 1 ALL General 1 ALL Component Location 1 ALL Description 1 ALL
MAIN STRUCTURE 53-31-00
DESCRIPTION AND OPERATION 1 ALL General 1 ALL Description 1 ALL Wing Center Box 1 ALL Belly Fairing 3 ALL Center Fuselage 3 ALL
MAIN STRUCTURE 53-31-00
53-CONTENTS Page 13 Aug 01/05 R CES
CHAPTER 53
__________
FUSELAGE
TABLE OF CONTENTS
_________________
SUBJECT_______ CH/SE/SU _ PAGE EFFECTIVITY
________ C ____ ___________
INSPECTION/CHECK 601 ALL
Detailed Visual Inspection of 601 ALL
Pressure Bulkhead at FR46, FWD
Face
Detailed Visual Inspection of MLG 605 ALL
Bay Fuselage Side Panels inside
MLG Bay, between FR42 and FR46,
including Slanted Frames and Side
Box, LH/RH
Detailed Visual Inspection of MLG 609 ALL
Bay Fuselage Side Panels, Outboard
Face, between FR42 and FR47, from
STGR26 to STGR36, LH/RH
Detailed Visual Inspection of 614 ALL
Upper Surfaces of Pressure Deck
Membranes, Side Boxes between FR42
and FR46 including Connections to
all Beams and Ribs, LH/RH
Detailed Visual Inspection of 618 ALL
Lower Surface of Pressure Deck
Membranes between FR42 and FR46
Including Connections to
Longitudinal Beams
Detailed Visual Inspection of 622 ALL
Keelbeam Box
Detailed Visual Inspection of 629 ALL
Pressure Bulkhead at FR46, AFT
Face, Including Vertical Beams,
Above Cargo Floor Level
Detailed Visual Inspection of 635 001-049, 051-099
Internal Structure around the 101-149, 151-199
Emergency Exit Cutouts, Both 201-299, 401-499
Sides, from STGR10 to STGR23,
LH/RH
Detailed Visual Inspection of Skin 643 ALL
around Anti-Collision Light
Cutout, between FR40 and FR41 and
between Stringer 1, LH/RH,
External Surface
Detailed Visual Inspection of Skin 647 ALL
around ADF-1 Antenna Cutout,
between FR44 and FR45 and between
Stringer 1, LH/RH, External
Surface
Detailed Visual Inspection of 651 ALL
Pressure Bulkhead FWD Face and the
53-CONTENTS Page 14 Aug 01/05 R CES
CHAPTER 53__________
FUSELAGE
TABLE OF CONTENTS_________________
SUBJECT_______ CH/SE/SU________ C_ PAGE EFFECTIVITY____ ___________
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM FUSELAGE 机身1(22)