Job Set-up Information
______________________
A. Fixtures, Tools, Test and Support Equipment
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
No specific access platform 1.50 m (4 ft. 11 in.)
No specific access platform 3.50 m (11 ft. 6 in.)
No specific Torque Wrench : range 0.00 to 1.20 m.daN
(0.00 to 9.00 lbf.ft)
B. Consumable Materials
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
Material No. 09-016 USA MIL-PRF-81733D TYPE II CLASS B
CORROSION INHIBITING FILLET CONSISTENCY
(Ref. 20-31-00)
R EFF : 001-049, 054-099, 101-149, 151-199, 53-19-41Page 405 201-299, 301-399, 401-499, Aug 01/05
CES
C. Referenced Information -------------------------------------------------------------------------------
REFERENCE DESIGNATION -------------------------------------------------------------------------------24-41-00-862-002 De-energize the Aircraft Electrical Circuits Supplied
from the External Power
52-10-00-010-001 Opening of the Passenger/Crew Door
52-10-00-410-001 Closing of the Passenger/Crew Door
R **ON A/C 001-049, 054-099, 101-149, 151-199, 201-299, 301-399, 401-499, Post SB 53-1143 For A/C 001-003, 53-19-41-991-001 Fig. 401
R **ON A/C 001-049, 054-099, 101-149, 151-199, 201-299, 301-399, 401-499,
3. Job Set-up
__________
R **ON A/C 001-049, 054-099, 101-149, 151-199, 201-299, 301-399, 401-499, Post SB 53-1143 For A/C 001-003, Subtask 53-19-41-860-050
A. Aircraft Maintenance Configuration
(1)
Make sure that the access platform is in position at zone 812.
(2)
Make sure that the access platform is in position at zone 831.
(3)
Make sure that the FWD passenger/crew door 831 is open (Ref. TASK 52-10-00-010-001).
(4)
Make sure that the avionics-compartment access door 812 is open.
R EFF : 001-049, 054-099, 101-149, 151-199, 53-19-41Page 406 201-299, 301-399, 401-499, Aug 01/05
CES
R **ON A/C 001-049, 054-099, 101-149, 151-199, 201-299, 301-399, 401-499,
4. Procedure
_________
R **ON A/C 001-049, 054-099, 101-149, 151-199, 201-299, 301-399, 401-499, Post SB 53-1143 For A/C 001-003, Subtask 53-19-41-840-050
A. Preparation for Installation
(Ref. Fig. 401/TASK 53-19-41-991-001)
(1)
Flush the collector grid (2) and the container (9).
(2)
Remove and clean the strainers (10) of the container.
(3)
Dry the collector grid (2), the container (9) and the strainers (10).
(4)
Install the strainers (10).
(5) Clean the component interface and/or the adjacent area.
Subtask 53-19-41-420-050
B. Installation of the Collector Grid and the Container
(Ref. Fig. 401/TASK 53-19-41-991-001)
(1)
Put the container (9) in position.
(2)
Install the washers (3) and the screws (4).
(3)
Install the washers (5) and the screws (6).
(4)
Tighten the screws (4) and (6).
(5)
Make sure that the line end-fittings are serviceable.
(6)
Connect the ducts (8).
(7)
Install the clamps (7) and TORQUE the clamps to 0.28 m.daN (24.77 lbf.in).
(8)
Put the collector grid (2) in position.
(9)
Install the screws (1) and tighten.
R EFF : 001-049, 054-099, 101-149, 151-199, 53-19-41Page 407 201-299, 301-399, 401-499, Aug 01/05
CES
(10) Apply a layer of SEALANTS (Material No. 09-016) between the structure and the grid rack assembly, on the heads of the screws (1) and on the ends of the screws (4) and (6).
R **ON A/C 001-049, 054-099, 101-149, 151-199, 201-299, 301-399, 401-499,
5. Close-up
________
R **ON A/C 001-049, 054-099, 101-149, 151-199, 201-299, 301-399, 401-499, Post SB 53-1143 For A/C 001-003, Subtask 53-19-41-410-050
A. Close Access
(1)
Make sure that the work area is clean and clear of tool(s) and other items.
(2)
Close the FWD passenger/crew door 831 (Ref. TASK 52-10-00-410-001).
(3)
Close the access door 812.