• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-03-27 08:44来源:蓝天飞行翻译 作者:admin
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

 Attached to FR 1
 Detailed Inspection of Cockpit  A666  ALL
 Side Windows, External Visible
 Portion of Framework, between FR 4
 and FR 12, LH/RH
 Detailed Inspection of Cockpit  A670  ALL
 Windshield, External Portion of
 Framework Covered by Retainers
 Detailed Inspection of Cockpit  A674  ALL
 Windshield, External Visible
 Portion of Retainers
 Detailed Inspection of Forward  A678  ALL
 Passenger/Crew Door Cutout,
 Underneath the Scuff-Plate, LH/RH
 Detailed Inspection of Fuselage  A682  ALL
 Internal Structure and Lower
 53-CONTENTS  Page 4
 Aug 01/03 
R
 CES 

 

 CHAPTER 53__________
 FUSELAGE
 TABLE OF CONTENTS_________________
 SUBJECT_______  CH/SE/SU________  C_  PAGE EFFECTIVITY____ ___________
 Surface of Cabin Floor Structure,
 from FR 15 to FR 21, between STRG
 23 and STRG 28 LH/RH
 Detailed Inspection of Aft Face of  A687  ALL
 Forward Pressure Bulkhead, Above
 Cockpit Floor Level, Including FR
 1, as far as Visible
 Detailed Inspection of Cockpit  A691  ALL
 Window Frames and Closing Panels,
 Internal Structure (FR 12 and
 Forward)
 Detailed Inspection of Cockpit  A697  ALL
 Floor Structure, between FR 1 and
 FR 12
 Detailed Inspection of Cabin Floor  B602  ALL
 Structure between FR 12 and FR 21
 Detailed Inspection of Aft Face of  B607  ALL
 Forward Pressure Bulkhead, below
 Cockpit Floor Level, Including FR1
 and Stringer Connections
 Detailed Inspection of Cabin Floor  B612  ALL
 Structure, below and 0.5 M around
 Galleys and Toilets, between FR 21
 and FR 24
 Clean Door Girt Bar Fitting Stop  B617  ALL
 Levers
 General Visual Inspection of Cabin  B620  ALL
 Floor Structure Excluding Areas
 below Galleys and Toilets, between
 FR 21 and FR 24
 General Visual Inspection of  B625  ALL
 Fuselage Internal Structure and
 Floor Structure, Including NLG Bay
 Panels, Between FR 1 and FR 12,
 below Cockpit Floor Panels
 General Visual Inspection of  B630  ALL
 Fuselage Internal Structure and
 Floor Structure, Including NLG Bay
 Aft Face, between FR 21 and FR 24,
 below Cabin Floor Panels
 Detailed Inspection of Forward  B635  ALL
 Passenger/Crew Door Cutout Lower
 Corners Internal Structure above
 Cabin Floor Level, at FR 16 and FR
 20 from ...
 PROTECTIVE SHIELDS - FR1  53-11-41
 53-CONTENTS  Page 5
 Aug 01/04 
R
 CES 

 

 CHAPTER 53
__________
 FUSELAGE
 TABLE OF CONTENTS
_________________
 SUBJECT_______ CH/SE/SU _ PAGE EFFECTIVITY
________ C ____ ___________ REMOVAL/INSTALLATION 401 ALL Removal of the Protective Shields 401 ALL
 -FR1 Installation of the Protective 405 ALL Shields - FR1
 FLOOR PANELS 53-12-00
 REPAIRS 801 ALL Repair of the Damaged Area of the 801 ALL Adhesive Tape
 PANELS - COCKPIT FLOOR 53-12-11
 REMOVAL/INSTALLATION 401 ALL Removal of the Cockpit Floor 401 ALL Panels from FR1 Thru FR12 Installation of the Cockpit Floor 406 ALL Panels from FR1 thru FR12
 PANELS - CABIN FLOOR 53-12-12
 REMOVAL/INSTALLATION 401 ALL Removal of the Cabin Floor Panels 401 ALL from FR12 thru FR24 Installation of the Cabin Floor 414 ALL Panels from FR12 thru FR24
 PANELS - AVIONICS COMPARTMENT FLOOR 53-12-13
 REMOVAL/INSTALLATION 401 ALL Removal of the avionics 401 ALL compartment floor panels Installation of the avionics 406 ALL compartment floor panels
 RADOME 53-15-11
 MAINTENANCE PRACTICES 201 ALL Opening of the Radome 110AL 201 ALL Closing of the Radome 110AL 204 ALL
 RADOME 53-15-11
 REMOVAL/INSTALLATION 401 ALL Removal of the Radome 401 ALL Installation of the Radome 407 ALL Removal of a Radome Telescopic Rod 421 ALL Installation of a Radome 425 ALL Telescopic Rod Removal of the Locking Handle 429 ALL Installation of the Locking Handle 432 ALL Removal of the Arrestor Pick-Up 440 ALL Fitting Installation of the Arrestor 443 ALL Pick-Up Fitting Removal of the Radome Seal 447 ALL
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM FUSELAGE 机身1(19)