• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-03-27 08:44来源:蓝天飞行翻译 作者:admin
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

R EFF : 301-399, 53-21-00Page 611 May 01/04
 CES R TASK 53-21-00-200-020


R Detailed Inspection of Escape Chute Slide Compartment, Internal Structure, R between FR 35.1 and FR 35.2A, from Stringer 24 to Stringer 28, LH/RH R 1. Reason for the Job
__________________ R Refer to the MPD TASK: 532117-01 R 2. Job Set-up Information
______________________
R A. Fixtures, Tools, Test and Support Equipment
R -------------------------------------------------------------------------------R REFERENCE QTY DESIGNATION R -------------------------------------------------------------------------------
R No specific masking paper R No specific masking tape R No specific access platform 3.2 m (10 ft. 6 in.)
R B. Consumable Materials
R -------------------------------------------------------------------------------R REFERENCE DESIGNATION R -------------------------------------------------------------------------------
R No specific R Material No. 08-074 R R Material No. 11-004 R R R Material No. 15-005 R R R Material No. 15-006 R R R Material No. 19-003 R
masking paper

MASKING TAPE (Ref. 20-31-00)
USA MIL-T-81533
1.1.1TRICHLOROETHANE (METHYL CHLOROFORM)
(Ref. 20-31-00)
AIB TN 10138 TYPE I GRADE 2
CORROSION PREVENTIVE TEMPORARY PROTECTIVE COMPOUND
(Ref. 20-31-00)
AIB TN 10138 TYPE I GRADE 3
CORROSION PREVENTIVE TEMPORARY PROTECTIVE COMPOUND
(Ref. 20-31-00)
USA AMS 3819
LINT-FREE COTTON CLOTH (Ref. 20-31-00)

R EFF : 301-399, 53-21-00Page 612 May 01/04
 CES R C. Referenced Information


R -------------------------------------------------------------------------------R REFERENCE DESIGNATION R -------------------------------------------------------------------------------
R 25-62-47-000-001 R 25-62-47-400-001 R 52-30-00-860-003 R R 52-30-00-860-004 R R SRM 511100 P.Block 001 R SRM 512200 P.Block 001 R 53-21-00-991-022
R 3. Job Set-up
__________
R Subtask 53-21-00-010-061
R A. Get Access Escape-Slide Enclosure - Removal Escape-Slide Enclosure - Installation Open the FWD or AFT Cargo-Compartment Door with the Hand Pump Close the FWD or AFT Cargo-Compartment Door with the Hand Pump (for corrective action) (for corrective action) Fig. 603
R (1) Put an access platform at the zone 131 (132).
R (2) Open the forward cargo compartment door 825 (Ref. TASK 52-30-00-860-R 003).
R (3) Remove the escape-slide stowage compartment at door 2 and 3 R (Ref. TASK 25-62-47-000-001).
R Subtask 53-21-00-110-052
R B. Cleaning of the Structure
R  WARNING : USE SOLVENTS/CLEANING AGENTS, SEALANTS AND OTHER SPECIAL_______
R  MATERIALS ONLY WITH A GOOD SUPPLY OF AIR.
R  OBEY THE MANUFACTURERS INSTRUCTIONS.
R  PUT ON PROTECTIVE CLOTHING.
R  DO NOT GET THEM IN YOUR MOUTH.
R  DO NOT SMOKE.
R  DO NOT BREATHE THE GAS.
R  THESE MATERIALS ARE POISONOUS, FLAMMABLE AND SKIN IRRITANT.
R  GET MEDICAL HELP IF YOUR SKIN OR EYES BECOME IRRITATED.
R  WARNING : OBEY THE MANUFACTURER'S INSTRUCTIONS WHEN YOU USE THIS/THESE_______
R  MATERIAL/S.
R  USE PROTECTIVE CLOTHING, RUBBER GLOVES, GOGGLES AND A MASK.
R EFF : 301-399, 53-21-00Page 613 May 01/04
 CES  CES


R  (1) Clean the inspection area with a CLEANING AGENTS (Material No. 11-
R  004) and a lint-free cotton cloth MISCELLANEOUS (Material No. 19-
R  003), if necessary. 
R  4. Procedure_________ 
R  Subtask 53-21-00-220-052 
R  A. Inspection 
R  (Ref. Fig. 603/TASK 53-21-00-991-022) 
R  (1) Do a detailed inspection of the internal structure of the escape 
R  slide stowage compartment. This inspection is applicable between 
R  FR35.1 and FR35.2A from STGR24 to STGR28, left and right sides. 
R  (2) Make sure that there is no: 
R  (a) Corrosion damage: 
R  - If you find corrosion damage, refer to the Structural Repair 
R  Manual (Ref. SRM 512200 P.Block 001) for types of corrosion, 
R  inspection, removal and corrosion protection. 
R  (b) Other damage (cracks, scratches, stress, marks, dents, 
R  bumps,...): 
R  - If you find other damage, refer to the Structural Repair Manual 
R  (Ref. SRM 511100 P.Block 001) for damage classification and 
R  corrective action. 
R  Subtask 53-21-00-916-059 
R  B. Application of the Temporary Protection 
R  (Ref. Fig. 603/TASK 53-21-00-991-022) 
R  CAUTION : DO NOT APPLY TEMPORARY PROTECTION ON THE OXYGEN SYSTEMS._______ 
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM FUSELAGE 机身1(135)