R R  (3) Remove the lining panels at FR20: - For the left door: 221KW, 221LW, 221MW, 221NW, 221PW, 221QW (Ref. TASK 25-23-45-000-005) - For the right door: 222KW, 222LW, 222MW, 222NW, 222PW, 222QW (Ref. TASK 25-23-45-000-002)
 Subtask 53-11-00-020-063 
R  B. Removal of the Components
 (1) Remove the insulation blankets (Ref. TASK 25-80-00-000-001) at FR20.
R  (2) Remove the threaded pins (HI-LITE) (1) and the nuts (2). Refer to the Structural Repair Manual (Ref. SRM 514211,P.Block 001). (Ref. Fig. 627/TASK 53-11-00-991-044)

 CES


R Bolts at the Outer Flange of FR20 at the Double Joggle Area Figure 627/TASK 53-11-00-991-044
 EFF : ALL 53-11-00Page A602 Feb 01/04
 CES  CES


 Subtask 53-11-00-110-075
 C. Preparation of the Inspection Area (Ref. Fig. 628/TASK 53-11-00-991-071)
 WARNING : USE SOLVENTS/CLEANING AGENTS, SEALANTS AND OTHER SPECIAL_______ MATERIALS ONLY WITH A GOOD SUPPLY OF AIR. OBEY THE MANUFACTURERS INSTRUCTIONS. PUT ON PROTECTIVE CLOTHING. DO NOT GET THEM IN YOUR MOUTH. DO NOT SMOKE. DO NOT BREATHE THE GAS. THESE MATERIALS ARE POISONOUS, FLAMMABLE AND SKIN IRRITANT. GET MEDICAL HELP IF YOUR SKIN OR EYES BECOME IRRITATED.
 WARNING : OBEY THE MANUFACTURER'S INSTRUCTIONS WHEN YOU USE THIS/THESE_______ MATERIAL/S. USE PROTECTIVE CLOTHING, RUBBER GLOVES, GOGGLES AND A MASK. 
R R R  (1) Clean the inspection surface with CLEANING AGENTS (Material No. 11-004) and a lint-free cotton cloth MISCELLANEOUS (Material No. 19-003), if necessary.
 (2) Make sure that the surface of the inspection area is clean and smooth. 
R R  (3) Do a visual check of the inspection area for damage or discontinuities.
 (4) Make sure that there is no:
R R R  (a) Corrosion damage: - If you find corrosion damage, refer to the Structural Repair Manual (Ref. SRM 512200,P.Block 001) for types of corrosion, inspection, removal and corrosion protection.
R R R  (b) Other damage (cracks, scratches, stress, marks, dents, bumps...): - If you find this type of damage, refer to the Structural Repair Manual (Ref. SRM 511100,P.Block 001) for damage classification and corrective action.

 

R  Door Stops at FR20 - Inspection Area Figure 628/TASK 53-11-00-991-071
 EFF :  ALL  53-11-00 Page A604 Feb 01/04
 CES 

 

 4. Procedure_________
 Subtask 53-11-00-250-056
 A. Inspection (Ref. Fig. 628/TASK 53-11-00-991-071) 
R R R  (1) Do a special detailed inspection of the door FR20, left and right sides. This inspection is applicable at the double joggle area in the outer flange of the frame (at the door stops 1 and 7). Refer to the Non-destructive Testing Manual (Ref. NTM 531155,P.Block-601). 
R  (2) Make a report of the damage after the NDT inspection:
R R  (a) Corrosion damage: - If you find damage, refer to the Structural Repair Manual (Ref. SRM 512200,P.Block 001) for types, inspection, removal and corrosion protection.
R R R  (b) Other damage (cracks, scratches, stress, marks, dents, bumps...): - If you find this type of damage, refer to the Structural Repair Manual (Ref. SRM 511100,P.Block 001) for damage classification and corrective action.
 5. Close-up________
 Subtask 53-11-00-914-052
 A. Preparation of the Bolts for Installation
 (1) Make sure that the parts retained from the removed component are clean and in the correct condition.
 (2) Apply a bead of SEALANTS (Material No. 09-005) around the screws (1) and the nuts (2).
 Subtask 53-11-00-420-061 
R  B. Installation of the Components
R  (1) Install the threaded pins (HI-LITE) (1) and the nuts (2). Refer to the Structural Repair Manual (Ref. SRM 514211,P.Block 001). (Ref. Fig. 627/TASK 53-11-00-991-044) 
R  (2) Install the insulation blankets (Ref. TASK 25-80-00-400-001).

 CES


 Subtask 53-11-00-410-067
 C. Close Access
R R R R  (1) Install the lining panels at FR20: - For the left door: 221KW, 221LW, 221MW, 221NW, 221PW, 221QW (Ref. TASK 25-23-45-400-006). - For the right door: 222KW, 222LW, 222MW, 222NW, 222PW, 222QW (Ref. TASK 25-23-45-400-007).
 (2) Make sure that the work area is clean and clear of tool(s) and other items. 
R  (3) Close the forward passenger/crew door 831 (841) (Ref. TASK 52-10-00-410-001).
 (4) Remove the access platform(s).

 

 TASK 53-11-00-210-021 
R R  Detailed Inspection of Continuity Fitting between FR 20 and FR 21, and Angle Fitting, Both Sides of FR 21, at Stringer 41 Location, LH/RH
 1. Reason for the Job__________________
 Refer to the MPD TASK: 531157-01
 