__________________
Self Explanatory
2.
Job Set-up Information
______________________
A. Fixtures, Tools, Test and Support Equipment
-------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
No specific circuit breaker(s) safety clip(s)
No specific nonmetallic scraper
No specific access platform 1.80 m (5 ft. 11 in.)
B. Referenced Information
-------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
53-19-42-991-001 Fig. 401
R EFF : 106-149, 154-199, 207-299, 301-399, 53-19-42Page 401 401-499, Aug 01/05
CES 3. Job Set-up
__________ Subtask 53-19-42-865-050
A. Open, safety and tag this(these) circuit breaker(s):
-------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------122VU ANTI ICE/PROBES/PHC/3 2DA3 Y16 122VU ANTI ICE/PROBES/3/PITOT 3DA3 Z16 122VU ANTI ICE/PROBES/3/AOA 4DA3 Z15 122VU ANTI ICE/PROBES/3/STATIC 5DA3 Z14
Subtask 53-19-42-941-050
B. Get Access
(1) Put an access platform in position at the zone 122.
4. Procedure
_________ (Ref. Fig. 401/TASK 53-19-42-991-001) Subtask 53-19-42-020-050
A. Removal of the Static Port Blanking-Plate
(1)
Remove the sealant from the area between the static port blanking-plate (3) and the fuselage structure with a nonmetallic scraper.
(2)
Remove the screws (1) and (2).
(3)
Remove the static port blanking-plate (3).
R EFF : 106-149, 154-199, 207-299, 301-399, 53-19-42Page 402 401-499, Aug 01/05
CES
Static Port Blanking-Plate Figure 401/TASK 53-19-42-991-001
R EFF : 106-149, 154-199, 207-299, 301-399, 401-499, 53-19-42 Page 403 Aug 01/05
CES
TASK 53-19-42-400-001
Installation of the Static Port Blanking-Plate
WARNING : MAKE SURE THAT THE CIRCUIT BREAKERS RELATED TO THE WEATHER RADAR ARE
_______ OPENED, SAFETIED AND TAGGED.
WARNING : MAKE SURE THAT:
_______
-
THE STATIC PROBE IS NOT HOT
-
THE ELECTRICAL SUPPLY TO THE HEATING ELEMENT OF THE PROBE IS ISOLATED BEFORE YOU START THE TASK.
1. Reason for the Job
__________________
Self Explanatory
2. Job Set-up Information
______________________
A. Fixtures, Tools, Test and Support Equipment
-------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
No specific masking tape No specific non metallic pin 2.5 mm (0.0984 in.) dia. No specific nonmetallic scraper
B. Consumable Materials
-------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
Material No. 05-013A C Z-24.223 RELEASE AGENT (Ref. 20-31-00)
Material No. 09-016 USA MIL-PRF-81733D TYPE II CLASS B CORROSION INHIBITING FILLET CONSISTENCY (Ref. 20-31-00)
Material No. 09-019B USA AMS 3267 LOW ADHESION POLYSULFIDE SEALANT (Ref. 20-31-00) Material No. 11-003 USA ASTM D 740 METHYL-ETHYL-KETONE (Ref. 20-31-00) Material No. 19-003 USA AMS 3819 LINT-FREE COTTON CLOTH (Ref. 20-31-00)
R EFF : 106-149, 154-199, 207-299, 301-399, 53-19-42Page 404 401-499, Aug 01/05
CES
C. Referenced Information
-------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
34-11-16-000-001 Removal of the Static Probe (7DA1,7DA2,7DA3,8DA1,8DA2,8DA3) 34-11-16-400-002 Installation of the Static Probe
(7DA1,7DA2,7DA3,8DA1,8DA2,8DA3) 53-19-42-991-001 Fig. 401 53-19-42-991-003 Fig. 402
3. Job Set-up
__________
Subtask 53-19-42-865-051
A. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged
-------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------122VU ANTI ICE/PROBES/PHC/3 2DA3 Y16 122VU ANTI ICE/PROBES/3/PITOT 3DA3 Z16 122VU ANTI ICE/PROBES/3/AOA 4DA3 Z15 122VU ANTI ICE/PROBES/3/STATIC 5DA3 Z14
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM FUSELAGE 机身1(127)