 -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
53-11-41-000-001 Removal of the Protective Shields - FR1
 53-11-41-400-001 Installation of the Protective Shields - FR1
 53-15-11-010-001 Opening of the Radome 110AL
 53-15-11-410-001 Closing of the Radome 110AL
 SRM 511100 P.Block 001 (for corrective action)
 SRM 512200 P.Block 001 (for corrective action)
 53-11-00-991-003 Fig. 604

 EFF : ALL

53-11-00Page 614


 3. Job Set-up__________
 Subtask 53-11-00-010-052
 A. Get Access 
R  (1) Put an access platform in position at the zone 110.
 (2) Open the radome 110AL (Ref. TASK 53-15-11-010-001).
 (3) Remove the upper protection shield (Ref. TASK 53-11-41-000-001).
 Subtask 53-11-00-110-054
 B. Cleaning of the Structure
 WARNING : USE SOLVENTS/CLEANING AGENTS, SEALANTS AND OTHER SPECIAL_______ MATERIALS ONLY WITH A GOOD SUPPLY OF AIR. OBEY THE MANUFACTURERS INSTRUCTIONS. PUT ON PROTECTIVE CLOTHING. DO NOT GET THEM IN YOUR MOUTH. DO NOT SMOKE. DO NOT BREATHE THE GAS. THESE MATERIALS ARE POISONOUS, FLAMMABLE AND SKIN IRRITANT. GET MEDICAL HELP IF YOUR SKIN OR EYES BECOME IRRITATED. 
R R R  (1) Clean the inspection area with CLEANING AGENTS (Material No. 11-004) and a lint-free cotton cloth MISCELLANEOUS (Material No. 19-003), if necessary.
 4. Procedure_________
 Subtask 53-11-00-220-068
 A. Inspection (Ref. Fig. 604/TASK 53-11-00-991-003) 
R R R  (1) Do a detailed inspection of the structure of the forward face of the pressure bulkhead. This inspection also includes the vertical angles, the horizontal stiffeners and the supports of the honeycomb panels.
 (2) Make sure that there is no:
 (a) corrosion damage: if you find corrosion damage, refer to the Structural Repair Manual (Ref. SRM 512200 P.Block 001) for types, inspection, removal and corrosion protection.

 EFF : ALL

53-11-00Page 615
May 01/03


R  Forward Face of the Forward Pressure Bulkhead Figure 604/TASK 53-11-00-991-003
 EFF :  ALL  53-11-00 Page 616 May 01/03
 CES 

 

 (b) other damage (cracks, scratches, stress, marks, dents, bumps,...): if you find other damage, refer to the Structural Repair Manual (Ref. SRM 511100 P.Block 001) for damage classification and corrective action. ________
5. Close-up
 Subtask 53-11-00-410-052
 A. Close Access
 (1)
 Install the upper protective shield (Ref. TASK 53-11-41-400-001).

 (2)
 Make sure that the work area is clean and clear of tool(s) and other items.

 (3)
 Close the radome 110AL (Ref. TASK 53-15-11-410-001).

 (4)
 Remove the access platform(s).

 

R TASK 53-11-00-210-809


R  General Visual Inspection of Avionics Compartment Doors, Surround Corners, 
R  External Surface (4 Doors) 
R  1. Reason for the Job__________________ 
R  Refer to the MPD TASK: 531111-01 
R  2. Job Set-up Information______________________ 
R  A. Fixtures, Tools, Test and Support Equipment 
R  -------------------------------------------------------------------------------
R  REFERENCE QTY DESIGNATION 
R  -------------------------------------------------------------------------------
R  No specific access platform 1.5 m (4 ft. 11 in.) 
R  B. Consumable Materials 
R  -------------------------------------------------------------------------------
R  REFERENCE DESIGNATION 
R  -------------------------------------------------------------------------------
R  Material No. 11-004 USA MIL-T-81533 
R  1.1.1TRICHLOROETHANE (METHYL CHLOROFORM) 
R  (Ref. 20-31-00) 
R  Material No. 19-003 USA AMS 3819 
R  LINT-FREE COTTON CLOTH (Ref. 20-31-00) 
R  C. Referenced Information 
R  -------------------------------------------------------------------------------
R  REFERENCE DESIGNATION 
R  -------------------------------------------------------------------------------
R  SRM 511100 P.Block 001 (for corrective action) 
R  SRM 512200 P.Block 001 (for corrective action) 
R  53-11-00-991-083 Fig. 605

 EFF : ALL

53-11-00Page 618
May 01/03

R 3. Job Set-up
__________

R  Subtask 53-11-00-941-088 
 