REFERENCE  DESIGNATION
 -------------------------------------------------------------------------------
Material No. 09-018  USA AMS 3267/3
 CORROSION INHIBITING LOW ADHESION SEALANT
 (Ref. 20-31-00)

 Material No. 09-019  USA AMS 3267/3
 LOW ADHESION CORROSION INHIBITING SEALANT
 (Ref. 20-31-00)

R Material No. 09-025  USA MIL-PRF-81733 CORROSION INHIBITING SEALANT SPRAYABLE (Ref. 20-31-00)
 C. Referenced Information
 -------------------------------------------------------------------------------
REFERENCE  DESIGNATION
 -------------------------------------------------------------------------------
24-41-00-861-002 Energize the Aircraft Electrical Circuits from the External Power 24-41-00-862-002 De-energize the Aircraft Electrical Circuits Supplied
 from the External Power 53-12-13-000-001 Removal of the avionics compartment floor panels 53-12-13-400-001 Installation of the avionics compartment floor panels 53-19-41-991-003 Fig. 402
 EFF : ALL
53-19-41Page 413

R 3. Job Set-up
__________

R  Subtask 53-19-41-860-052 
R  A. Aircraft Maintenance Configuration 
R  (1) Make sure that the aircraft electrical circuits are energized 
R  (Ref. TASK 24-41-00-861-002). 
R  Subtask 53-19-41-010-055 
R  B. Get Access 
R  (1) Make sure that the access platform is in position at zone 811. 
R  (2) Make sure that the avionics-compartment access door 811 is open. 
R  (3) Make sure that the access platform is in position at zone 824. 
R  (4) Make sure that the avionics-compartment access door 824 is open. 
R  (5) On the panel 50VU: 
R  - make sure that the AVIONICS/COMPT LT pushbutton switch 23LS is 
R  pushed. 
R  (6) In the avionics compartment, make sure that the applicable floor 
R  panel is removed (Ref. TASK 53-12-13-000-001). 
R  (7) Make sure that the insulation blanket is removed. 
R  4. Procedure_________ 
R  Subtask 53-19-41-840-052 
R  A. Preparation for Installation 
R  (1) Make sure that the parts retained from the removed component are 
R  clean and in the correct condition. 
R  (2) Clean the component interface and/or the adjacent area.

 EFF : ALL
53-19-41Page 414
Nov 01/00


R  Subtask 53-19-41-420-052 
R  B. Installation of the Drain Valve 
R  (Ref. Fig. 402/TASK 53-19-41-991-003) 
R  (1) Apply SEALANTS (Material No. 09-025) on the component interface. 
R  (2) Put the retaining valve (2) in position. 
R  (3) Apply SEALANTS (Material No. 09-025) around the retaining valve (2). 
R  (4) Put the two nuts (1) in position. 
R  (5) Install the two bolts (3). Tighten the two nuts (1). 
R  (6) Apply SEALANTS (Material No. 09-018) or SEALANTS (Material No. 09-
R  019) between the valve (4) and the structure. 
R  (7) Install the valve (4). 
R  5. Close-up________ 
R  Subtask 53-19-41-410-052 
R  A. Installation of Components 
R  (1) Install the insulation blanket on the drain valve. 
R  (2) Make sure that the work area is clean and clear of tool(s) and other 
R  items. 
R  (3) Install the floor panel (Ref. TASK 53-12-13-400-001). 
R  Subtask 53-19-41-941-051 
R  B. Close Access 
R  (1) On the panel 50VU: 
R  - push then release the AVIONICS COMPT/LT pushbutton switch. 
R  (2) Close the avionics-compartment access doors 824 and 811. 
R  (3) Remove the access platform(s).

 EFF : ALL
53-19-41Page 415
Nov 01/00


R Subtask 53-19-41-862-052
R C. De-energize the aircraft electrical circuits R (Ref. TASK 24-41-00-862-002).
 EFF : ALL
53-19-41Page 416


 BLANKING PLATE - STATIC PORT - REMOVAL/INSTALLATION
___________________________________________________ TASK 53-19-42-000-001 Removal of the Static Port Blanking-Plate WARNING : MAKE SURE THAT THE CIRCUIT BREAKERS RELATED TO THE WEATHER RADAR ARE
_______ OPENED, SAFETIED AND TAGGED.
 WARNING : MAKE SURE THAT:
_______
 -
THE STATIC PROBE IS NOT HOT

 -
THE ELECTRICAL SUPPLY TO THE HEATING ELEMENT OF THE PROBE IS ISOLATED BEFORE YOU START THE TASK.


 1.
 Reason for the Job
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM FUSELAGE 机身1(126)