Subtask 53-21-00-941-082
A. Get Access
(1) Put an access platform in position at the zone 130.
Subtask 53-21-00-110-097
B. Cleaning of the Structure
WARNING : USE SOLVENTS/CLEANING AGENTS, SEALANTS AND OTHER SPECIAL
_______ MATERIALS ONLY WITH A GOOD SUPPLY OF AIR. OBEY THE MANUFACTURERS INSTRUCTIONS. PUT ON PROTECTIVE CLOTHING. DO NOT GET THEM IN YOUR MOUTH. DO NOT SMOKE. DO NOT BREATHE THE GAS. THESE MATERIALS ARE POISONOUS, FLAMMABLE AND SKIN IRRITANT. GET MEDICAL HELP IF YOUR SKIN OR EYES BECOME IRRITATED.
(1) Clean the inspection area with CLEANING AGENTS (Material No. 11-004) and a lint-free cotton cloth MISCELLANEOUS (Material No. 19-003), if necessary.
4. Procedure
_________
Subtask 53-21-00-210-081
A. Inspection
(Ref. Fig. 612/TASK 53-21-00-991-053)
(1)
Do a visual inspection of the fuselage external surface around the water-drain panel cutout (133AL). This inspection is applicable between FR25 and FR29 at the STGR43, left side.
(2)
Make sure that there is no:
(a) Corrosion damage: If you find corrosion damage, refer to the Structural Repair Manual (Ref. SRM 512200 P.Block 001) for types of corrosion, inspection, removal and corrosion protection.
EFF : ALL
53-21-00Page 663
May 01/05
R
CES
Fuselage External Surface around the Water-Drain Panel Cutout between FR25 and
FR29 at STGR43, Left Side
Figure 612/TASK 53-21-00-991-053
EFF : ALL
53-21-00Page 664
May 01/05 R CES
(b) Other damage (cracks, scratches, stress, marks, dents, bumps,...): If you find other damage, refer to the Structural Repair Manual (Ref. SRM 511100 P.Block 001) for damage classification and corrective action.
5. Close-up
________
Subtask 53-21-00-942-088
A. Close Access
(1)
Make sure that the work area is clean and clear of tool(s) and other items.
(2)
Remove the access platform(s).
EFF : ALL
53-21-00Page 665
May 01/05
R
CES
TASK 53-21-00-210-008
General Visual Inspection of Forward Cargo Door Actuator Attach Brackets, between Cabin Floor Beams, from FR 25 to FR 27
1. Reason for the Job
__________________
Refer to the MPD TASK: 532195-01
2. Job Set-up Information
______________________
A. Fixtures, Tools, Test and Support Equipment
-------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
No specific access platform 1.80 m (5 ft. 11 in.)
B. Consumable Materials
-------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
Material No. 11-004 USA MIL-T-81533 1.1.1TRICHLOROETHANE (METHYL CHLOROFORM) (Ref. 20-31-00)
Material No. 19-003 USA AMS 3819 LINT-FREE COTTON CLOTH (Ref. 20-31-00)
C. Referenced Information
-------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
25-54-12-000-002 Removal of the Ceiling Panels in the FWD Cargo Compartment 25-54-12-400-002 Installation of the Ceiling Panels in the FWD Cargo Compartment 52-30-00-860-001 Open the FWD or AFT Cargo-Compartment Door with the Yellow Electric Pump 52-30-00-860-002 Close the FWD or AFT Cargo-Compartment Door with the
Yellow Electric Pump SRM 511100 P.Block 001 (for corrective action) SRM 512200 P.Block 001 (for corrective action)