(b)
Other damage (cracks, scratches, stress, marks, dents, bumps...):
-If you find this type of damage, refer to the Structural Repair Manual (Ref. SRM 511100,P.Block 001) for damage classification and corrective action.
4. Procedure
_________
Subtask 53-11-00-250-057
A. Inspection
(Ref. Fig. 619/TASK 53-11-00-991-075)
(1)
Do a special detailed inspection of the internal side of the lower attachment of the windshield side post. This inspection is applicable at FR4, left and right sides. Refer to the Non-destructive Testing Manual (Ref. NTM 531133,P.Block-601).
(2)
Make a report of the damage after the NDT inspection:
(a)
Corrosion damage:
-If you find damage, refer to the Structural Repair Manual (Ref. SRM 512200,P.Block 001) for types, inspection, removal and corrosion protection.
(b)
Other damage (cracks, scratches, stress, marks, dents, bumps...):
-If you find this type of damage, refer to the Structural Repair Manual (Ref. SRM 511100,P.Block 001) or damage classification and corrective action.
5. Close-up
________
Subtask 53-11-00-410-069
A. Close Access
(1)
Install the lining panel 211NW (212NW) on the side post at FR4.
(2)
Install the lining panel 211PW (212PW).
R EFF : 001-049, 051-099, 101-105, 151-154, 53-11-00Page 675 201-207, May 01/05
CES
(3)
Close the sliding window.
(4)
Make sure that the work area is clean and clear of tool(s) and other items.
(5)
Close the forward passenger/crew door 831 (841) (Ref. TASK 52-10-00-410-001).
(6)
Remove the access platform(s).
R EFF : 001-049, 051-099, 101-105, 151-154, 53-11-00Page 676 201-207, May 01/05
CES **ON A/C ALL
TASK 53-11-00-210-026
Special Detailed Inspection of Windshield Side Post at Frame 4, Upper
Attachment, Internal Side, LH/RH
1. Reason for the Job
__________________
R Refer to the MPD TASK: 531135-01
2. Job Set-up Information
______________________
A. Fixtures, Tools, Test and Support Equipment
-------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
No specific access platform 3.50 m (11 ft. 6 in.)
B. Consumable Materials
-------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
Material No. 09-005 USA MIL-S-81733 CLASS C CORROSION INHIBITIVE INTERFAY SEALANT (Ref. 20-31-00)
Material No. 11-004 USA MIL-T-81533
1.1.1TRICHLOROETHANE (METHYL CHLOROFORM)
(Ref. 20-31-00)
Material No. 19-003 USA AMS 3819
LINT-FREE COTTON CLOTH (Ref. 20-31-00)
EFF : ALL
53-11-00Page 677
C. Referenced Information
-------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
52-10-00-010-001 Opening of the Passenger/Crew Door
52-10-00-410-001 Closing of the Passenger/Crew Door
56-12-11-010-001 Opening of the Cockpit Sliding Windows
56-12-11-410-001 Closing of the Cockpit Sliding Windows
NTM 531135,P.Block-601
SRM 511100,P.Block 001 (for corrective action)
SRM 512200,P.Block 001 (for corrective action)
53-11-00-991-041 Fig. 620
R 53-11-00-991-042-A Fig. 621 53-11-00-991-069-A Fig. 622
3. Job Set-up
__________
Subtask 53-11-00-010-066
A. Get Access
R (1) Put an access platform in position at zone 831 (841).
(2)
Open the forward passenger/crew door 831 (841) (Ref. TASK 52-10-00-010-001).
(3)
Open the sliding window (Ref. TASK 56-12-11-010-001).
(4)
Remove the lining panels 211NW (212NW).
(Ref. Fig. 620/TASK 53-11-00-991-041)
(5)
Remove the lining panels 211BC, 211KC, 211LC (212BC, 212KC, 212LC). (Ref. Fig. 620/TASK 53-11-00-991-041)
Subtask 53-11-00-020-062
B. Removal of the Components R (Ref. Fig. 621/TASK 53-11-00-991-042-A)
(1) Remove the 3 bolts (1) and the nuts (2).
EFF : ALL
53-11-00Page 678
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM FUSELAGE 机身1(52)