3. Job Set-up__________
Subtask 53-11-00-010-094
R A. Get Access
R (1) Open the nose landing-gear doors 713 (714) (Ref. TASK 32-22-00-010-001).
Subtask 53-11-00-110-109
B. Cleaning of the Structure
WARNING : USE SOLVENTS/CLEANING AGENTS, SEALANTS AND OTHER SPECIAL_______ MATERIALS ONLY WITH A GOOD SUPPLY OF AIR. OBEY THE MANUFACTURERS INSTRUCTIONS. PUT ON PROTECTIVE CLOTHING. DO NOT GET THEM IN YOUR MOUTH. DO NOT SMOKE. DO NOT BREATHE THE GAS. THESE MATERIALS ARE POISONOUS, FLAMMABLE AND SKIN IRRITANT. GET MEDICAL HELP IF YOUR SKIN OR EYES BECOME IRRITATED.
R R R (1) Clean the inspection area with CLEANING AGENTS (Material No. 11-004) and a lint-free cotton cloth MISCELLANEOUS (Material No. 19-003), if necessary.
4. Procedure_________
Subtask 53-11-00-210-083
R A. Inspection (Ref. Fig. 631/TASK 53-11-00-991-064)
R R (1) Do a general visual inspection of all the panels of the nose landing-gear well, left and right sides.
(2) Make sure that there is no:
R R (a) corrosion damage: - If you find corrosion damage, refer to the Structural Repair Manual (Ref. SRM 512200 P.Block 001) for types, inspection, removal and corrosion protection.
R R Nose-Landing-Gear Well Panels Figure 631/TASK 53-11-00-991-064
EFF : ALL 53-11-00 Page A615 Aug 01/03
CES
R R R R (b) other damage (cracks, scratches, stress, marks, dents, bumps,...): - If you find other damage, refer to the Structural Repair Manual (Ref. SRM 511100 P.Block 001) for damage classification and corrective action.
Subtask 53-11-00-916-066
B. Application of Temporary Protection
CAUTION : DO NOT APPLY TEMPORARY PROTECTION ON THE OXYGEN SYSTEMS._______ MAKE SURE THAT THE TEMPORARY PROTECTION DOES NOT GET: -ON COMPOSITE PARTS, CONTROL CABLES, PULLEYS,TEFLON BEARINGS. -ON LUBRICATED SURFACES. -IN DRAIN VALVES OR OTHER ORIFICES. TEMPORARY PROTECTION ON OR IN THESE PARTS CAN CAUSE DAMAGE.
R R R (1) Apply masking paper or masking tape BONDING AND ADHESIVE COMPOUNDS (Material No. 08-074) on the equipment and fittings adjacent to the area.
(2) Apply a layer of STORAGE PRESERVATION (Material No. 15-005) or STORAGE PRESERVATION (Material No. 15-006) to the inspection area.
R (3) Remove the masking tape or the masking paper.
5. Close-up________
Subtask 53-11-00-410-094
A. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other items.
R (2) Close the nose landing-gear doors 713 (714) (Ref. TASK 32-22-00-410-001).
CES TASK 53-11-00-210-018
Detailed Inspection of NLG Bay, Rear Panel Aft Face, Lower Corners, LH/RH
1. Reason for the Job
__________________
Refer to the MPD TASK: 531162-01
2. Job Set-up Information
______________________
A. Fixtures, Tools, Test and Support Equipment
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
R No specific access platform 1.50 m (4 ft. 11 in.)
B. Consumable Materials
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------