 Remove the access panel (Ref. TASK 57-41-37-000-003):

 -
FOR 12QM
 remove 522AT


 -
FOR 13QM
 remove 622AT.

 

 

 Subtask 28-24-00-865-064
 D. Open, safety and tag this(these) circuit breaker(s):
 -------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------49VU FLIGHT CONTROLS/SLT/CTL AND MONG/SYS1 5CV B06 121VU FLIGHT CONTROLS/SLT/CTL/SYS2 7CV R21
 4. Procedure
_________ R **ON A/C 001-049, 051-099, 101-149, 151-199, 201-299, 401-499,
 (Ref. Fig. 501/TASK 28-24-00-991-002)
 **ON A/C 301-399,

 (Ref. Fig. 501A/TASK 28-24-00-991-002-A)
 **ON A/C ALL

 (Ref. Fig. 503/TASK 28-24-00-991-005)
 1EFF : ALL 1 28-24-00Page 533 1 1 Aug 01/05 1 1 1CES 1 Subtask 28-24-00-860-057


 A. Aircraft Maintenance Configuration
 (1)
 Make sure the slats are at the 0-degree position.

 (2)
 Install the TOOL-ZERO LOCKING, FLAP SLAT CTL LEVER (98D27803500001) on the flap/slat control lever on the panel 114VU.

 (3)
 Energize the aircraft electrical circuits (Ref. TASK 24-41-00-861-002).

 (4)
 Do the EIS start procedure (ECAM only) (Ref. TASK 31-60-00-860-001).

 (5)
 On the ECAM CP 11VU, push (in) the FUEL P/BSW to get the FUEL system page on the ECAM lower DU.


 Subtask 28-24-00-865-065
 B. Make sure that this(these) circuit breaker(s) is(are) closed: -------------------------------------------------------------------------------
PANEL ------ DESIGNATION ---------------------------------- -------------------- IDENT. LOCATION-------------------
49VU FUEL/LP VALVE/MOT1/ENG2  2QG  A09
 49VU FUEL/LP VALVE/MOT1/ENG1  1QG  A08
 121VU FUEL/LP VALVE/MOT2/ENG2  4QG  M26
 121VU FUEL/LP VALVE/MOT2/ENG1  3QG  M25
 Subtask 28-24-00-720-054
 C. Test of the Valve 12QM
 ----------------------------------------ACTION  --------------------RESULT -------------------

-------------------------------------------------------------------------------
1. On the panel 121VU:  The ENG 1 LP valve MOTOR 2 SUPPLY and
 -Open, safety and tag the  CONTROL is isolated. circuit breaker 3QG.
 On the ECAM lower DU:
 -the LEFT LP valve indication shows the valve closed (amber cross-line).
 2. On the panel 115VU:  On the ECAM lower DU:
 1EFF : ALL 1 28-24-00Page 534 1 1 May 01/04R 1 1 1CES 1


 -------------------------------------------------------------------------------
ACTION RESULT -------------------------------------------------------------------------------
- put the ENG/MASTER 1 switch to  - the LEFT LP valve indication shows
 the ON position.  the valve open (green in-line).
 3. On the panel 115VU:  On the ECAM lower DU:
 - put the ENG/MASTER 1 switch to  - the LEFT LP valve indication shows
 the OFF position.  the valve closed (amber cross-line).
 4. On the panel 121VU:  - the ENG 1 LP valve MOTOR 2 SUPPLY and
 - remove the safety clip and tag  CONTROL is energized.
 and close the circuit breaker
 3QG.
 5. On the panel 49VU:  - the ENG 1 LP VALVE MOTOR 1 SUPPLY and
 - open, safety and tag the  CONTROL is isolated.
 circuit breaker 1QG.
 On the ECAM lower DU:
 - the LEFT LP valve indication shows
 the valve closed (amber cross-line).
 6. On the panel 115VU:  On the ECAM lower DU:
 - put the ENG/MASTER 1 switch to  - the LEFT LP valve indication shows
 the ON position.  the valve open (green in-line).
 7. On the panel 115VU  On the ECAM lower DU:
 - put the ENG/MASTER 1 switch to  - the LEFT LP valve indication shows
 the OFF position.  the valve closed (amber cross-line).
 8. On the panel 49VU:  The ENG 1 LP valve MOTOR 1 SUPPLY and
 - remove the safety clip and the  CONTROL is energized.
 tag and close the circuit
 breaker 1QG.

 1EFF : ALL 1 28-24-00Page 535 1 1 May 01/04R 1 1 1CES 1


 Subtask 28-24-00-720-055
 D. Test of the Valve 13QM
 -------------------------------------------------------------------------------ACTION RESULT -------------------------------------------------------------------------------
1. On the panel 121VU:  The ENG 2 LP valve MOTOR 2 SUPPLY and
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM FUEL 燃油4(9)