• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-03-22 06:55来源:蓝天飞行翻译 作者:admin
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

 position.

 

 8.
 Stop the pump on the fuel tanker/pump unit.

 9.
 On the ECAM lower DU:


 -make sure that the fuel
 quantities are the same as the
 quantities on the indicator
 6QT.

 5. Close-up
________
 Subtask 28-25-00-860-058
 A. Aircraft Maintenance Configuration
 (1)
 Do the EIS stop procedure (Ref. TASK 31-60-00-860-002).

 (2)
 De-energize the aircraft electrical circuits (Ref. TASK 24-41-00-862-002).


 1EFF : ALL 1 28-25-00Page 533 1 1 May 01/05 1 1 1CES 1 Subtask 28-25-00-410-061


 B. Close Access
 (1)
 Make sure that the work area is clean and clear of tool(s) and other items.

 (2)
 Disconnect the hose coupling of the fuel tanker at the aircraft refuel/defuel coupling.

 (3)
 Install the refuel coupling cap on the applicable refuel/defuel coupling.

 (4)
 Disconnect these bonding/ground cables:


 -between the aircraft and the fuel tanker/pump unit
 -
if applicable, between the fuel tanker/pump unit and the ground

 -
if applicable, between the aircraft and the ground.


 (5) Close the access door 192MB. Subtask 28-25-00-942-061
 C. Removal of Equipment
 (1)
 Remove the safety barriers.

 (2)
 Remove the warning notice(s).

 (3)
 Remove the access platform(s).

 (4)
 Remove the ground support and maintenance equipment, the special and standard tools and all other items.


 1EFF : ALL 1 28-25-00Page 534 1 1 May 01/05 1 1 1CES 1R COUPLING/CAP - REFUEL/DEFUEL (40QM,41QM,100QM,101QM) - REMOVAL/INSTALLATION

 

___________________________________________________________________________ TASK 28-25-41-000-001 Removal of the Refuel/Defuel Coupling/Cap WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
 START A TASK ON OR NEAR:

 -
THE FLIGHT CONTROLS

 -
THE FLIGHT CONTROL SURFACES

 -
THE LANDING GEAR AND THE RELATED DOORS


 -COMPONENTS THAT MOVE. WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
 GEAR.

 1.
 Reason for the Job

__________________
 Self Explanatory


 2.
 Job Set-up Information


______________________
 A. Fixtures, Tools, Test and Support Equipment
 -------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
No specific blanking plugs
 No specific safety barriers
 No specific container 1 l (0.2641 USgal)
 No specific access platform 4 m (13 ft. 1 in.)

 1EFF : ALL 1 28-25-41Page 401 1 1 May 01/05 1 1 1CES 1 B. Referenced Information


 -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
28-00-00-910-001 Fuel Safety Procedures 28-10-00-910-002 Access to the Fuel Tanks and the Work Areas 57-27-11-000-002 Removal of the Access Panel (540HB, 540JB, 540KB,
 540LB, 540MB, 540NB, 540PB, 540QB, 540RB, 550AB, 550BB, 550CB, 550DB, 560AB, 640HB, 640JB, 640KB, ....)

R **ON A/C 001-049, 052-099, 101-149, 151-199, 201-299, 301-399, 401-499,
 28-25-41-991-002  Fig. 401
 **ON A/C 051-051,
 28-25-41-991-002-A Fig. 401A FOR FIN 100QM, 101QM 28-10-00-910-002 Access to the Fuel Tanks and the Work Areas FOR FIN 40QM 57-27-11-000-002 Removal of the Access Panel (540HB, 540JB, 540KB,
 540LB, 540MB, 540NB, 540PB, 540QB, 540RB, 550AB, 550BB, 550CB, 550DB, 560AB, 640HB, 640JB, 640KB, ....)
 FOR FIN 100QM
 57-27-11-000-002  Removal of the Access Panel (540HB, 540JB, 540KB, 540LB, 540MB, 540NB, 540PB, 540QB, 540RB, 550AB, 550BB, 550CB, 550DB, 560AB, 640HB, 640JB, 640KB, ....)
 **ON A/C ALL
 3. Job Set-up
__________
R **ON A/C 001-049, 052-099, 101-149, 151-199, 201-299, 301-399, 401-499,
 (Ref. Fig. 401/TASK 28-25-41-991-002)
 1EFF : ALL 1 28-25-41Page 402 1 1 Aug 01/05 1 1 1CES 1


 Refuel Coupling/Cap - Right Wing
 Figure 401/TASK 28-25-41-991-002

R 1EFF : 001-049, 052-099, 101-149, 151-199, 1 28-25-41Page 403 1201-299, 301-399, 401-499, 1Aug 01/05 1 1 1CES 1 **ON A/C 051-051,


 (Ref. Fig. 401A/TASK 28-25-41-991-002-A)
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM FUEL 燃油4(59)