Fuel Control Valve Actuator 11QL (12QL)
Figure 401/TASK 28-26-51-991-001
1EFF : 301-399, 1 28-26-51 Page 404
1 1 May 01/04
1 1
1CES 1
TASK 28-26-51-400-001
Installation of the Fuel Control Valve Actuator 11QL(12QL)
WARNING : MAKE SURE THAT THE FLIGHT CONTROL SAFETY-LOCKS AND THE WARNING
_______ NOTICES ARE IN POSITION.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______ GEAR.
1. Reason for the Job
__________________
Self Explanatory
2. Job Set-up Information
______________________
A. Fixtures, Tools, Test and Support Equipment
-------------------------------------------------------------------------------REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
No specific safety barriers
No specific access platform 1.65 m (5 ft. 5 in.)
B. Consumable Materials
-------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
Material No. 01-001 USA ASTM-D-1655-93 (JET A-1) FUEL, TURBO (Ref. 20-31-00) Material No. 04-012 USA VV-P-236 PURE MINERALVASELINE OR PETRO- LATUM (Ref. 20-31-00) Material No. 11-026 GB DEF-STAN 68-148/1 SOLVENT GENERAL PURPOSE (Ref. 20-31-00) Material No. 19-003 USA AMS 3819 LINT-FREE COTTON CLOTH (Ref. 20-31-00)
Material No. 19-010 USA AMS 5687 LOCKWIRE STAINLESS STEEL ANNEALED 0.8MM DIA (Ref. 20-31-00)
1EFF : 301-399, 1 28-26-51Page 405 1 1 May 01/04 1 1 1CES 1
C. Expendable Parts -------------------------------------------------------------------------------
FIG.ITEM --------- |DESIGNATION ---------------------------------------- |IPC-CSN------------------------------
3 O-ring 28-26-43 01 -020
D. Referenced Information
------------------REFERENCE -------------------------------DESIGNATION ------------------------------
-------------------------------------------------------------------------------
12-11-28-650-003 Pressure Refuel with Automatic Control 24-41-00-861-002 Energize the Aircraft Electrical Circuits from the
External Power 24-41-00-862-002 De-energize the Aircraft Electrical Circuits Supplied
from the External Power 28-00-00-910-001 Fuel Safety Procedures 28-25-00-650-001 Pressure Defuel 28-25-00-869-001 Fuel Transfer 31-60-00-860-001 EIS Start Procedure 31-60-00-860-002 EIS Stop Procedure 28-26-51-991-001 Fig. 401
3. Job Set-up
__________
Subtask 28-26-51-941-052
A. Safety Precautions
WARNING : OBEY THE FUEL SAFETY PROCEDURES.
_______
(1)
You must obey the fuel safety procedures (Ref. TASK 28-00-00-910-001) when you do work on the fuel system.
(2)
Make sure that the safety barriers are in position.
1EFF : 301-399, 1 28-26-51Page 406 1 1 May 01/04 1 1 1CES 1 Subtask 28-26-51-860-050
B. Aircraft Maintenance Configuration
(1)
Make sure that the access platform is below the applicable access panel 195AB (196AB).
(2)
Make sure that the applicable access door on the access panel 195AB (196AB) is open.
Subtask 28-26-51-865-051
C. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged
-------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------
121VU FUEL/CTR TK/AUTO/CTL 3QL R27 121VU FUEL/CTR TK/L&R XFR/CTL & IND 2QL R26 121VU FUEL/CTR TK/L&R XFR/CTL & IND 1QL R25
4. Procedure
_________
(Ref. Fig. 401/TASK 28-26-51-991-001)
Subtask 28-26-51-420-051
A. Preparation for Installation
(1)
Clean the component interfaces and the adjacent areas with a MISCELLANEOUS (Material No. 19-003) made moist with CLEANING AGENTS (Material No. 11-026).
(2)
Do an inspection of the component interface and/or the adjacent area.
(3)
Make sure that the parts retained from the removed component are clean and in the correct condition.
(4)
Lubricate the new O-ring (3) with FUELS (Material No. 01-001) or COMMON GREASE (Material No. 04-012).
(5) Install the new O-ring (3) in the drive sub-assembly (1).
Subtask 28-26-51-420-050
R B. Installation of the Fuel Control Valve Actuator 11QL (12QL) CAUTION : MAKE SURE THAT YOU ASSEMBLE THE ACTUATOR WITH THE DRIVE 中国航空网 www.aero.cn 航空翻译 www.aviation.cn 本文链接地址:A320飞机维护手册 AMM FUEL 燃油4(134)