(g)
Operate the check-valve (in the element assembly (4)) by hand to drain all the fuel that remains. Remove the container.
1EFF : ALL 1 28-25-41Page 427 1 1 Aug 01/05 1 1 1CES 1
(h)
Hold the element assembly (4) and remove the remaining bolts (7) and the washers (6).
(i)
Remove the shroud-ring (5), the element assembly (4) and the laminated shim(s) (3).
(j)
Remove and discard the O-ring (2).
(k)
On the refuel/defuel panel 800VU:
(l)
Close the access door 192MB.
1_ Put the RIGHT REFUEL VALVES switch in the NORM position and
lower the guard.
2_ Put the MODE SELECT switch in the OFF position and lower the
guard.
(2) If the check-valve in the element assembly will not operate, continue as follows:
(a)
Open the access door 192MB.
(b)
On the refuel/defuel panel 800VU: 1 Lift the guard and put the MODE SELECT switch in the REFUEL
_ position.
2 Lift the guard and put the RIGHT REFUEL VALVES switch in the
_ SHUT position.
(c)
Remove the coupling cap (8) from the coupling (1). NOTE : The coupling cap (8) will hang by the chain (9) from the
____ shroud-ring (5).
(d)
Remove the bolt (7) that attaches the attachment tag (10) to the shroud-ring (5).
NOTE : The attachment tag (10) will stay connected to the chain
____ (9).
(e)
Remove the coupling cap (8) together with the chain (9).
(f)
Hold the element assembly (4) and remove the remaining bolts (7) and the washers (6).
R 1EFF : 001-049, 052-099, 101-149, 151-199, 1 28-25-41Page 428 1201-299, 301-399, 401-499, 1Aug 01/05 1 1 1CES 1 1EFF : ALL 1 28-25-41Page 429 1 1 May 01/05 1 1 1CES 1 1EFF : 051-051, 1 28-25-41Page 430 1 1 May 01/05 1 1 1CES 1 1EFF : 051-051, 1 28-25-41Page 431 1 1 May 01/05 1 1 1CES 1R **ON A/C ALL
(g) Put a container below the coupling (1).
(h) Carefully remove the shroud-ring (5) and the element assembly (4), and drain the fuel that remains into the container. Remove the container.
(i) Remove the laminated shim(s) (3).
(j) Remove and discard the O-ring (2).
(k) On the refuel/defuel panel 800VU:
1_ Put the RIGHT REFUEL VALVES switch in the NORM position and lower the guard.
2_ Put the MODE SELECT switch in the OFF position and lower the guard.
(l) Close the access door 192MB.
R **ON A/C 051-051,
R Subtask 28-25-41-020-058-A
R A. Removal of the Refuel/Defuel Coupling Element Assembly
R R (1) If the check-valve in the element assembly is operational, continue as follows:
R (a) Open the access door 192MB.
R (b) On the refuel/defuel panel 800VU:
R R 1_ Lift the guard and put the MODE SELECT switch in the REFUELposition.
R R 2_ Lift the guard and put the LEFT/RIGHT REFUEL VALVES switch inthe SHUT position.
R (c) Remove the coupling cap (8) from the coupling (1).
R R NOTE : The coupling cap (8) will hang by the chain (9) from the____ shroud-ring (5).
R (d) Remove the bolt (7) that attaches the attachment tag (10) to the
R shroud-ring (5).
R NOTE : The attachment tag (10) will stay connected to the chain____
R (9).
R (e) Remove the coupling cap (8) together with the chain (9).
R (f) Put a container below the coupling (1).
R (g) Operate the check-valve (in the element assembly (4)) by hand to
R drain all the fuel that remains. Remove the container.
R (h) Hold the element assembly (4) and remove the remaining bolts (7)
R and the washers (6).
R (i) Remove the shroud-ring (5), the element assembly (4) and the
R laminated shim(s) (3).
R (j) Remove and discard the O-ring (2).
R (k) On the refuel/defuel panel 800VU:
R 1_ Put the LEFT/RIGHT REFUEL VALVES switch in the NORM position
R and lower the guard.
R 2_ Put the MODE SELECT switch in the OFF position and lower the
R guard.
R (l) Close the access door 192MB.
R (2) If the check-valve in the element assembly will not operate, continue
R as follows:
R (a) Open the access door 192MB.
R (b) On the refuel/defuel panel 800VU:
R 1_ Lift the guard and put the MODE SELECT switch in the REFUEL