(2)
Disconnect the hose coupling of the fuel tanker from the aircraft.
(3)
Disconnect these bonding/ground cables:
-between the aircraft and the fuel tanker/pump unit
-
if applicable, between the fuel tanker/pump unit and the ground
-
if applicable, between the aircraft and the ground.
(4)
Install the refuel coupling cap 41QM on the refuel/defuel coupling 40QM.
(5)
Remove the warning notice(s).
(6)
Remove the access platform(s).
(7)
Remove the ground support and maintenance equipment, the special and standard tools and all other items.
1EFF : ALL 1 28-25-00Page 318 1 1 Aug 01/05 1 1 1CES 1
R **ON A/C 051-051,
R Subtask 28-25-00-942-074-A
R C. Removal of Equipment
R (1) Remove the safety barriers.
R (2) Disconnect the hose coupling of the fuel tanker from the aircraft.
R (3) Disconnect these bonding/ground cables:
R - between the aircraft and the fuel tanker/pump unit
R - if applicable, between the fuel tanker/pump unit and the ground
R - if applicable, between the aircraft and the ground.
R (4) Install the refuel coupling cap 101QM (41QM) on the refuel/defuel
R coupling 100QM (40QM).
R (5) Remove the warning notice(s).
R (6) Remove the access platform(s).
R (7) Remove the ground support and maintenance equipment, the special and
R standard tools and all other items.
R 1EFF : 051-051, 1 28-25-00Page 319 1 1 May 01/05 1 1 1CES 1 **ON A/C ALL
TASK 28-25-00-869-001
Fuel Transfer
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
-
THE FLIGHT CONTROLS
-
THE FLIGHT CONTROL SURFACES
-
THE LANDING GEAR AND THE RELATED DOORS
-COMPONENTS THAT MOVE.
1. Reason for the Job
__________________
Self Explanatory
2. Job Set-up Information
______________________
A. Fixtures, Tools, Test and Support Equipment
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
No specific safety barriers
No specific warning notice
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
24-41-00-861-002 Energize the Aircraft Electrical Circuits from the External Power 24-41-00-862-002 De-energize the Aircraft Electrical Circuits Supplied
from the External Power
28-00-00-910-001 Fuel Safety Procedures
31-60-00-860-001 EIS Start Procedure
28-25-00-991-003 Fig. 303
R **ON A/C 001-049, 051-099, 101-149, 151-199, 201-299, 401-499,
28-25-00-991-004 Fig. 304
1EFF : ALL 1 28-25-00Page 320 1 1 Aug 01/05 1 1 1CES 1 -------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
**ON A/C 301-399,
28-25-00-991-004-A Fig. 304A
**ON A/C ALL
3. Job Set-up
__________
(Ref. Fig. 303/TASK 28-25-00-991-003)
R **ON A/C 001-049, 051-099, 101-149, 151-199, 201-299, 401-499,
(Ref. Fig. 304/TASK 28-25-00-991-004)
**ON A/C 301-399,
(Ref. Fig. 304A/TASK 28-25-00-991-004-A)
**ON A/C ALL
Subtask 28-25-00-941-070
A. Safety Precautions
WARNING : OBEY THE FUEL SAFETY PROCEDURES.
_______
(1)
You must obey the fuel safety procedures (Ref. TASK 28-00-00-910-001) when you do work on the fuel system.
(2)
Put the safety barriers in position.
(3)
Put a warning notice in position to tell persons not to operate the flight controls.
1EFF : ALL 1 28-25-00Page 321 1 1 Aug 01/05 1 1 1CES 1 Subtask 28-25-00-860-074
B. Aircraft Maintenance Configuration
(1)
Energize the aircraft electrical circuits
(Ref. TASK 24-41-00-861-002).
(2)
Do the EIS start procedure (lower ECAM DU only) (Ref. TASK 31-60-00-860-001).
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM FUEL 燃油4(31)