(e)
Install the thrust lever covers and seals: 1) Put the two right thrust lever covers and seals in their position for installation. 2) Install the three screws into each thrust lever cover and
seal.
3) Tighten the six screws.
(f)
Install the forward thrust lever stop: 1) Put the forward thrust lever stop in its position for
installation. 2) Install the four screws into the forward thrust lever stop.
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. AIRPLANES WITH EFIS-REINFORCED CONTROL ú
76-11-11 STANDS WITH A STABLIZER TRIM SHAFT WITH ú CONFIG 3 A SELF-LOCKING INSERT-AND-BOLT ú C01 Page 405
ú Mar 12/02
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
////////////////////////A / /
CFM56 ENGINES
737-300/400/500/ /MAINTENANCE MANUAL ////////////////////////
3) Tighten the four screws.
(g) Install the aft thrust lever stop:
CAUTION: MAKE SURE THAT THE AFT STOP IS IN THE CORRECT
_______ POSITION. IF THE AFT STOP IS REVERSED, THE THRUST REVERSER WILL NOT OPERATE.
1) Put the aft thrust lever stop in its position for installation. a) Make sure the tabs on the aft stop are pointing aft and
down. 2) Install the three screws into the aft thrust lever stop. 3) Tighten the three screws.
(h)
Install the aft guard plate: 1) Put the aft guard plate in its position for installation. 2) Install the two screws into the aft guard plate. 3) Tighten the two screws.
(i)
Install the stabilizer trim control wheels: 1) Install the left stabilizer trim control wheel on the spline shaft.
2) Install the right stabilizer trim control wheel on the spline shaft.
NOTE: Handles on the stabilizer trim control wheels must
____ be 90 (|15) degrees apart when installed on the control stand.
3) Install the bolts. a) Tighten the bolts to 150-170 inch-pounds (16.9-19.2 newton-meters).
S 864-009-C03
(2)
Remove the protective cover from the Aft Electronics Panel, P8.
S 864-010-C03
(3)
Supply hydraulic power (AMM 29-15-00/201).
S 724-011-C03
(4)
With the reverse thrust levers in their stowed position (forward and down), move each forward thrust lever through its full travel.
(a) Make sure the levers move smoothly and freely without
interference, binding, or scraping.
S 714-012-C03
(5) Do the Normal Operations Procedure to make sure the reverse thrust levers are correctly installed (AMM 78-31-00/501).
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:737-300 400 500 AMM 飞机维护手册 发动机控制 ENGINE CONTROLS(88)