• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-04-08 12:04来源:蓝天飞行翻译 作者:航空
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

_________________________________________
 A. Consumable Materials
 (1)  Sealant - DC 93-006-1 (AMM 70-10-01/201)
 B. References
 (1)  
AMM 12-31-91/201, Nacelle and Engine To Wing Fairing Access Doors and Panels

 (2)  
AMM 27-81-00/201, Leading Edge Flaps and Slats

 (3)  
AMM 54-32-01/401, Forward Fairing

 (4)  
AMM 71-11-02/401, Fan Cowl Panels

 (5)  
AMM 76-11-00/501, Engine Control System


 C. Access
 (1)  Location Zones
 5700, Engine No. 1 (Left)
 5800, Engine No. 2 (Right)

 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 76-11-09
 ALL  ú ú C01 Page 406 ú Nov 12/00
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
////////////////////////A / /
CFM56 ENGINES
737-300/400/500/ /MAINTENANCE MANUAL ////////////////////////
(2)  Access Panels
 5726L, Strut Access Door, Eng. No. 1 - left
 5727L, Strut Access Door, Eng. No. 1 - top
 5728L, Strut Access Door, Eng. No. 1 - top
 5729L, Strut Access Door, Eng. No. 1 - top
 5731L, Strut Access Door, Eng. No. 1 - right
 5746L, Fan Cowl Panel, Eng. No. 1 - left
 5826R, Strut Access Door, Eng. No. 2 - left
 5827R, Strut Access Door, Eng. No. 2 - top
 5828R, Strut Access Door, Eng. No. 2 - top
 5829R, Strut Access Door, Eng. No. 2 - top
 5831R, Strut Access Door, Eng. No. 2 - right
 5846R, Fan Cowl Panel, Eng. No. 2 - right

 D. Install the Start Control Push-Pull Cable (Fig. 401).
 S 864-011-C00
 (1)  Prepare the start control cable.
 (a)  
Remove the rodend fitting, the checknut, the jamnuts and washers from the end of cable that you connect to the fuel shutoff quadrant in the strut.

 (b)  
START CONTROL CABLES WITH ADJUSTABLE END FITTINGS; Remove the rodend fitting, the checknut, one jamnut and one tabwasher from the lower end of the cable.


 NOTE: The start control cable with the adjustable end fitting
____ can be used only with the cable support plate with a bearing.
 S 424-012-C00
 (2)  Install the start control cable.
 (a)  
Insert the upper end of control cable through the hole in the fan cowl support beam.

 (b)  
Move the control cable aft through the fan cowl support beam and the strut to the fuel shutoff assembly.

 (c)  
Connect the upper end of the control cable to the fuel shutoff assmbly. 1) At the upper end of the control cable, install the jamnuts,


 the washers, the rodend fitting and the checknut on the cable. 2) Install the control cable on the support bracket. a) Push the control cable on the support bracket flange
 with the flange between the jamnuts. b) Tighten the jamnuts. c) Install the lockwire on the forward jamnut and the
 support bracket. d) Attach the support bracket to the fuel shutoff assembly with two bolts and washers. e) Install the lockwire between the bolts that hold the support bracket to the fuel shutoff assembly.
 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 76-11-09
 ALL  ú ú C01 Page 407 ú Jul 12/99
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
////////////////////////A / /
CFM56 ENGINES
737-300/400/500/ /MAINTENANCE MANUAL ////////////////////////
3)  Connect the rodend of the control cable to the fuel shutoff quadrant. a) Put the rodend on the flanged bushing in the quadrant. b) On engine No. 1, install the retainer pin through the
 large washer, the bushing and the rodend. c) On engine No. 2, install the retainer pin through the
 cable retainer, the bushing, and the rodend.
 d) Install the small washer and the nut.
 e) Tighten the nut.

 (d)  Install the penetration fitting on the control cable to the support beam with the two bolts. 1) You can install the bolts with the boltheads on the inside
 or the outside of the support beam.
 NOTE: Do not apply sealant to the interface between the
____ cable and the penetration fitting until you have adjusted the control cable.
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:737-300 400 500 AMM 飞机维护手册 发动机控制 ENGINE CONTROLS(79)