• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-04-01 08:39来源:蓝天飞行翻译 作者:航空
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

A 737-300/400/500MAINTENANCE MANUAL
 (ak) Make sure the CDU display shows "*CHANNEL B NOT POWERED".
 (al) Follow the CDU instructions until the CDU display show the CHANNEL SELECTION page.
 (am) Push the LSK adjacent to <CHANNEL A.
 (an) Push the LSK adjacent to <TEST SELECTION.
 (ao) Use the CDU keyboard to put the library test 18 into the scratchpad.
 (ap) Push the LSK 6R to put the library test 18 on the screen and in the memory.
 (aq) Push the LSK adjacent to <EXECUTE to do the test 60.18 (FMC).
 (ar) Follow the instructions as shown on the CDU display but keep the AFCS B FCC DC circuit breaker open and FMC transfer switch in the NORMAL position.
 (as) Push the LSK adjacent to <CONTINUE.
 (at) Make sure the CDU display shows "DFCS TEST PASSED".
 (au) Push the LSK adjacent to <CONTINUE.
 (av) Push the LSK adjacent to EXIT>.
 (aw) Close the FMCS CMPTR No. 2 circuit breaker on the P6-1 panel.
 (ax) Set the FMC transfer switch in the BOTH ON R position.
 (ay) Push the INIT/REF key on the CDU keyboard to show the POS INIT page or PERF INIT page.
 (az) Push the LSK adjacent to <INDEX to show the INIT REF INDEX 1/1 page.
 (ba) Push the LSK adjacent to MAINT> to show the MAINT BITE INDEX 1/1 page.
 (bb) Push the LSK adjacent to <DFCS to show the DFCS BITE TEST LINE MAINT 1/2 page.
 (bc) Ignore the message "MOVE FMC TRANSFER SWITCH TO BOTH ON L" shows on the CDU, and keep the FMC transfer switch in the BOTH ON R position.
 (bd) Stop for approximately 15 seconds.
 (be) Push the LSK adjacent to <PUSH IF NO RESPONSE.
 (bf) Push the LSK adjacent to <CONTINUE.
 (bg) Push the NEXT PAGE key on the CDU keyboard to show the DFCS BITE OVERNIGHT MAINT 2/2 page.
 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. AIRPLANES WITH EFIS ú

 22-11-01
 ú ú 40 Page 547 ú Nov 12/99
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
737-300/400/500MAINTENANCE MANUAL
 (bh) Push the LSK adjacent to <GROUND FUNCTIONAL TEST.
 NOTE: The CDU display will show TEST IN PROGRESS during the
____ 13-second cross-channel test.
 (bi) Push the LSK adjacent to <CHANNEL A AND B.
 (bj) Push the LSK adjacent to <TEST SELECTION.
 (bk) Use the CDU keyboard to put the library test 18 into the
 scratchpad.
 (bl) Push the LSK 6R to put the library test 18 on the screen and in
 the memory.
 (bm) Push the LSK adjacent to <EXECUTE to do the test 60.18 (FMC).
 (bn) Follow the instructions as shown on the CDU display but keep
 the FMC transfer switch in the BOTH ON R position.
 (bo) Push the LSK adjacent to <CONTINUE.
 (bp) Push the LSK adjacent to EXIT>.
 (bq) Set the FMC transfer switch to the NORMAL position.
 (br) Push the INIT/REF key on the CDU keyboard to get out of BITE.
 TASK 22-11-01-835-064
 4. Rigging Tests
_____________
 A. General
 (1)  The BITE rigging test makes sure that the surfaces are correctly aligned. The rigging test includes the pitch and roll actuators, LVDT feedback, aileron and elevator position signals, and neutral shift sensor rigging. The authority checks are for the pitch, roll, and stabilizer actuators.
 NOTE: Use the rigging limits shown in this section for the
____ latest engineering values. The CDU display can show incorrect limits.
 (2)  The BITE rigging test includes:
 (a)  
Elevator Rigging Test

 (b)  
Aileron Rigging Test


 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. AIRPLANES WITH EFIS ú

 22-11-01
 ú ú 08 Page 548 ú Nov 12/99
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
 B.
C.
D.
A
737-300/400/500MAINTENANCE MANUAL
 (c)  
Flaps Rigging Test

 (d)  
Stabilizer Rigging Test

 (e)  
Pitch Control Wheel Steering Rigging Test

 (f)  
Roll Control Wheel Steering Rigging Test

 (g)  
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:737-300 400 500 AMM 飞机维护手册 自动飞行 AUTOFLIGHT 1(138)