R 1EFF : ALL 1 54-51-00Page A642 1 1 May 01/05 1 1 1CES 1
Pylon-to-Wing Aft Attachment Shackles at RIB10 Figure 628/TASK 54-51-00-991-063
R 1EFF : 1 1 1CES ALL 1 111 54-51-00 Page A643 May 01/05
5. Close-up________
Subtask 54-51-00-440-072
A. Aircraft Maintenance Configuration
(1) Make the thrust reverser serviceable (Ref. TASK 78-30-00-081-041).
Subtask 54-51-00-410-077
B. Close Access
R (1) Install the panels:
R (a) For the left pylon: 471CL, 472BR, 475AL, 475BL, 476AR, 476BR.
R (b) For the right pylon: 481BL, 482CR, 485AL, 485BL, 486AR, 486BR.
(2) Make sure that the work area is clean and clear of tool(s) and other items.
(3) Remove the access platform(s).
R (4) Remove the warning notice(s).
R 1EFF : ALL 1 54-51-00Page A644 1 1 May 01/05 1 1 1CES 1 PYLON-TO-WING ATTACH FITTINGS - REMOVAL/INSTALLATION
____________________________________________________
TASK 54-51-17-000-001
Removal of the Pylon-to-Wing Forward Attach Fitting at RIB4
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______ START A TASK ON OR NEAR:
-
THE FLIGHT CONTROLS
-
THE FLIGHT CONTROL SURFACES
-
THE LANDING GEAR AND THE RELATED DOORS
-COMPONENTS THAT MOVE.
WARNING : MAKE SURE THAT YOU HAVE THE CORRECT FIRE FIGHTING EQUIPMENT
_______ AVAILABLE.
1. Reason for the Job
__________________
Self Explanatory
2. Job Set-up Information
______________________
A. Fixtures, Tools, Test and Support Equipment
-------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
No specific blanking caps No specific warning notice No specific access platform 1.5 m (4 ft. 11 in.) No specific dynamometric cell 400 kg (881.8488 lb) 98D54003005000 1 PYLON SHAFT EXTRACTOR RIB 4/RIB 10 98D54403000000 1 DUMMY SHACKLES - PYLON TO WING YOKES 98D54403001000 1 DUMMY SLEEVES - PYLON TO WING YOKES 98D54503000000 1 PYLON REMOVAL-WRENCH
B. Referenced Information
-------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
05-57-00-200-001 Aircraft Stability 07-11-00-581-001 Lifting for Aircraft Maintenance Operations 28-00-00-910-001 Fuel Safety Procedures 71-00-00-000-042 Removal of the Power Plant 71-13-11-000-040 Removal of the Fan Cowl Doors 78-32-11-000-040 Removal of the Left or Right Half Door of Thrust
Reverser 54-51-17-991-001 Fig. 401 54-51-17-991-012 Fig. 402 54-51-17-991-003 Fig. 403 54-51-17-991-005 Fig. 404
3. Job Set-up
__________
Subtask 54-51-17-860-050
A. Safety Precautions
(1)
On the center pedestal, on the ENG panel 115VU:
(a) Put a warning notice to tell persons not to start the engine.
(2)
Make sure that the engine 1(2) shutdown occurred not less than 5 minutes before you do this procedure.
(3)
On the overhead maintenance panel 50VU:
(a)
Make sure that the ON legend of the ENG/FADEC GND PWR/1(2) pushbutton switch is off.
(b)
Put a warning notice to tell persons not to energize the FADEC 1(2).
(4)
Obey the fuel safety procedures (Ref. TASK 28-00-00-910-001) when you do work on the fuel system.
Subtask 54-51-17-869-050
B. Aircraft Stability
(1) Let the aircraft become stable (Ref. TASK 05-57-00-200-001).
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM NACELLES/PYLONS(52)